Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance NO 99 A VILAPAKKAM ROAD ARUMBAKKAM VILLAGE MANNAVEDU POST TIRUVALLUR DISTRICT 602 021 | ARUMBAKKAM | TIRUVALLUR | TAMIL NADU | 602021 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance NO 33 PILLAYAR KOIL ST PULIYAMBEDU CHENNAI 77 | CHENNAI | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹12.2 L
EMD Value
₹31,000
Closing Date
13 Jan 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block development office vp
Block development office poonamallee union
Construction of Cement Concrete Drainage with Culvert 1 no near Amman Koil Street in Padur Panchayat 2 Construction of Cement Concrete Drainage with Culvert 1 no at Bajanai Koil Street in Padur Panchayat
2022_RDTN_276007_1
4028/2022/A7AGAMT-II/2022-23
Open Tender
Civil Works
Works
90 days
poonamallee
Class 3
3 documents required · 3 mandatory
₹0
₹31,000
Yes
Block development office
13 Jan 2023
28 Dec 2022
13 Jan 2023
28 Dec 2022
13 Jan 2023
28 Dec 2022
28 Dec 2022
Amount
1. Construction of Cement Concrete Drainage with Culvert(1 no) near Amman Koil Street in Padur Panchayat - 29.5m.
Earth work excavasion in all soil includind all cost and conveancy charges
Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cement Concrete 1:3:6 using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cost towards supply centering with planks including all cost and conveyance charges
Plastering in cement morter 1:4 20mm thick including cost and conveyance of all materials site and all labour charges etc. complete
sub estimate for culvert
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B.
Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cement Concrete 1:3:6 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cost towards supply centering with planks including all cost and conveyance charges
Below sill
Above sill
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (20mm Metal)
Reinforced cement concrete 1:1 1/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works.
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
2. Construction of Cement Concrete Drainage with Culvert(1 no) at Bajanai Koil Street in Padur Panchayat-6m
Earth work excavasion in all soil includind all cost and conveancy charges
Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cement Concrete 1:3:6 using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cost towards supply centering with planks including all cost and conveyance charges
Plastering in cement morter 1:4 20mm thick including cost and conveyance of all materials site and all labour charges etc. complete
sub estimate for culvert
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B.
Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cement Concrete 1:3:6 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cost towards supply centering with planks including all cost and conveyance charges
Basement level
Aboves level
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (20mm Metal)
Reinforced cement concrete 1:1 1/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works.
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M/s. New Mohana Constructions
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .