Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC | ₹3.1 L | L1 | Accepted-AOC L1 Accept |
| 2 | L2₹3.4 L+₹35,382.22 (11.6%)Rejected-Finance | ₹3.4 L+₹35,382.22 (11.6%) | L2 | Rejected-Finance L2 Reject |
| 3 | L3₹3.5 L+₹40,945.09 (13.4%)Rejected-Finance | ₹3.5 L+₹40,945.09 (13.4%) | L3 | Rejected-Finance L3 Reject |
| 4 | L4₹3.8 L+₹72,213.67 (23.6%)Rejected-Finance | ₹3.8 L+₹72,213.67 (23.6%) | L4 | Rejected-Finance L4 Reject |
| 5 | L5₹3.9 L+₹81,906.03 (26.8%)Rejected-Finance | ₹3.9 L+₹81,906.03 (26.8%) | L5 | Rejected-Finance L5 Reject |
| Sl No | Description | Qty | Unit | BALASUBRAMANIAN L5 | M SANTHI L3 | K.SARAVANAN CONTRACTOR L1 | T MANOGARAN L2 | HARIHARASUDAN. C L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00Renovation of PUE School (RCC Roof) Building (North facing) @ R.Puthupattinam (Muslim) in Nattanipurasakudi Panchayat | ||||||||
| 2.00 | Dismantling the existing damaged Pressed tiles | 85.75 | Sqm | 27.83 ₹2,386.42 | 21.93 ₹1,880.5 Lowest | 22 ₹1,886.5 | 24.49 ₹2,100.02 | 26 ₹2,229.5 |
| 3.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete | 85.75 | Sqm | 293.5 ₹25,167.63 | 262.68 ₹22,524.81 | 185 ₹15,863.75 Lowest | 258.28 ₹22,147.51 | 295 ₹25,296.25 |
| 4.00 | Plastering with CM 1:5,12mm Thickness including cost and conveyance of all materials to site and all labour charges etc comoplete | 50.62 | Sqm | 270.43 ₹13,689.17 | 242.03 ₹12,251.56 | 230 ₹11,642.6 Lowest | 237.98 ₹12,046.55 | 277 ₹14,021.74 |
| 5.00 | Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete | 85.75 | Sqm | 1,038.9 ₹89,085.68 | 929.82 ₹79,732.07 | 910 ₹78,032.5 | 914.23 ₹78,395.22 | 800 ₹68,600 Lowest |
| 6.00 | Providing Granolithic Pattern Floor finish with plain cement concrete 1:2:4 using 10-12 mm ISS HBG metal and top rubbed smooth etc., complete | 6.11 | Sqm | 162.3 ₹991.65 | 145.26 ₹887.54 | 150 ₹916.5 | 142.82 ₹872.63 Lowest | 162 ₹989.82 |
| 7.00 | Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three Sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight. | 91.53 | Sqm | 876.03 ₹80,183.03 | 784.05 ₹71,764.1 | 660 ₹60,409.8 Lowest | 770.91 ₹70,561.39 | 1,040 ₹95,191.2 |
| 8.00 | White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete | 85.75 | Sqm | 36.87 ₹3,161.6 | 33 ₹2,829.75 | 30 ₹2,572.5 Lowest | 32.45 ₹2,782.59 | 35 ₹3,001.25 |
| 9.00 | Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete | 105.49 | Sqm | 141.27 ₹14,902.57 | 126.88 ₹13,384.57 | 135 ₹14,241.15 | 124.32 ₹13,114.52 Lowest | 145 ₹15,296.05 |
| 10.00 | Special desing Art work with first class quality emulsion paint including wall putty priming coat etc complete Rate for 100 sq ft | 72.62 | Sqm | 790.47 ₹57,403.93 | 707.47 ₹51,376.47 | 705 ₹51,197.1 | 695.61 ₹50,515.2 Lowest | 720 ₹52,286.4 |
Tender Value
₹3.9 L
EMD Value
₹3,920
Closing Date
20 Feb 2026, 3:00 pmClosed
Bdo.Avudaiyarkoil
Pt.Union Office,Avudaiyarkoil
Renovation of PUE School (RCC Roof) Building (North facing) at R.Puthupattinam (Muslim) in Nattanipurasakudi Panchay
2026_RDTN_655599_1
Avk/BMS/Work--8
Open Tender
Civil Works
Item Rate
Avudaiyarkoil
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3,920
17 Mar 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
Renovation of PUE School (RCC Roof) Building (North facing) @ R.Puthupattinam (Muslim) in Nattanipurasakudi Panchayat
Dismantling the existing damaged Pressed tiles
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete
Plastering with CM 1:5,12mm Thickness including cost and conveyance of all materials to site and all labour charges etc comoplete
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Providing Granolithic Pattern Floor finish with plain cement concrete 1:2:4 using 10-12 mm ISS HBG metal and top rubbed smooth etc., complete
Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three Sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight.
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete
Special desing Art work with first class quality emulsion paint including wall putty priming coat etc complete Rate for 100 sq ft
Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Providing block board painting in two coats with good quality paint including cost and conveyance etc. complete.
Re Painting old wood work with one coat of best synthetic enamel paint of approved quality, colour including ordinary scrapping and preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, finishing neatly etc., complete complying with standard specification and as directed by the Departmental Officer.
Supplying and fixing PVC Rain water down fall pipes of following dia meter etc., complete.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 1 & 14 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
Avk_doc--8.pdf
Tender Documents • 0.26 MB
BOQ_786158.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .