Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 CrAccepted-Finance | L1 | Accepted-Finance lowest1 | |
| 2 | L2₹20.0 Cr+₹20.9 L (1.06%)Accepted-Finance | L2 | Accepted-Finance lowest2 | |
| 3 | L3₹21.7 Cr+₹1.9 Cr (9.81%)Accepted-Finance | L3 | Accepted-Finance lowest3 | |
| 4 | L4₹22.4 Cr+₹2.7 Cr (13.5%)Accepted-Finance | L4 | Accepted-Finance lowest4 | |
| 5 | L5₹24.8 Cr+₹5.0 Cr (25.3%)Accepted-Finance | L5 | Accepted-Finance lowest5 |
Tender Value
₹25.5 Cr
EMD Value
₹51.1 L
Closing Date
6 Nov 2025, 6:00 pmClosed
Executive Engineer
Peer bagh Srinagar near Anti Corruption Bureau Hqrs.
Construction of Emergency Operation Theatre Block at Government SMHS Hospital Srinagar (Balance work for Completion by way of Civil, Electrical and Mechanical works).
2025_DGPJK_293218_1
e-NIT/EE/PHC/26/2025-26
Open Tender
Civil Works
Percentage
SMHS Srinagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,000
Executive Engineer
₹51.1 L
15 Nov 2025
25 Oct 2025
7 Nov 2025
25 Oct 2025
6 Nov 2025
27 Oct 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Reinforced cement concrete work in walls (any thickness),including attached pilasters,buttresses,plinth and string courses, fillets, columns, pillars, piers, abutments, posts, suspended floors, landings, stairacases and sturts,etc upto floor five level excluding cost of centring,shuttering,finishing and reinforcement in 1:1:2 (1 cement:1 coarse sand: 2 graded crushed stone aggregate 20 mm nominal size) including all carriages complete. | 566.45 | Cum | 8,457.25 | ₹47,90,609.26 |
| 2 | Reinforcement for RCC works including straightening, cutting, bending placing in position and binding all complete. Thermo Mechanically Treated bars. including all carriages. | 1,01,961.77 | Kg | 79.25 | ₹80,80,470.27 |
| 3Centring and shuttring including strutting , propping etc. including removal of form work. | |||||
| 3.01 | Beams/lintels :- | 7,250.3 | Sqm | 502.85 | ₹36,45,813.36 |
| 3.02 | Suspended Floors | 2,293.43 | Sqm | 635.6 | ₹14,57,704.11 |
| 3.03 | Columns | 767.03 | Sqm | 680.15 | ₹5,21,695.45 |
| 3.04 | Edges of Slab | 1,019.3 | Rm | 242.3 | ₹2,46,976.39 |
| 4 | Extra for Additional height in centering, shuttering where ever required with adequate bracing, propping etc incl, cost of deshuttering and decentering at all levels, over a height of 3.5 meter for every additional height of 1 meter or part thereof (Suspended floors, roofs, landing, beams and balconies)(Plan area to be measured). | 2,293.43 | Sqm | 267.6 | ₹6,13,721.87 |
| 5 | Brick work with FPS bricks of class designation 75 in super structure up to all floors. Including carraige of Bricks In cement mortar 1cement: 6 fine sand mortar. Excluding the carriages of material. | 714.43 | Cum | 7,507.4 | ₹53,63,511.78 |
| 6 | Providing / laying 18-20mm th Granite Stone slab of approved make in all colours and shades, laid on 20mm thick cement mortar 1:4 (1cement: 4 coarse sand) including grouting the joints with white cement and matching pigments etc. complete. including all carriages and costs of material involved. | 1,752.48 | Sqm | 3,576.5 | ₹62,67,744.72 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
BOQ_947220.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .