Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-Finance | ₹1.5 L | L1 | Accepted-Finance 1st Lowest Bidder |
| 2 | L2₹1.5 LRejected-Finance | ₹1.5 L | L2 | Rejected-Finance 2nd Lowest Bidder |
| 3 | L3₹1.5 LRejected-Finance | ₹1.5 L | L3 | Rejected-Finance 3rd Lowest Bidder |
| Sl No | Description | Qty | Unit | Harshit Enterprises L3 | M/s Radha Enterprises L2 | K. D AND GUPTA ELECT. AND ENGG. WORKS L1 |
|---|---|---|---|---|---|---|
| 1.00Extraction and removal of useless/defective control cable of 400 KV switchyard and 200 KV switchyard of different equipment installed at 400 KV Sub Station Motiram Adda, Gorakhpur by tracking one from either panel side or equipment side then after rolling the cable from one end for macking bunch and then shifting of these bunches from work side to store with all other associated work. | ||||||
| 1.01 | 2 CX 2.5 sqmm | 3 | KM | 7,020 ₹21,060 | 7,010 ₹21,030 | 6,990 ₹20,970 |
| 1.02 | 4 CX 2.5 sqmm | 3.5 | KM | 8,500 ₹29,750 | 8,500 ₹29,750 | 8,490 ₹29,715 |
| 1.03 | 6 CX 2.5 sqmm | 3.5 | KM | 12,020 ₹42,070 | 12,010 ₹42,035 | 11,990 ₹41,965 |
| 1.04 | 10 CX 2.5 sqmm | 3.5 | KM | 12,510 ₹43,785 | 12,495 ₹43,732.50 | 12,450 ₹43,575 |
| 1.05 | 14 CX 2.5 sqmm | 1 | KM | 15,000 ₹15,000 | 14,990 ₹14,990 | 14,900 ₹14,900 |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
28 Apr 2026, 5:00 pmClosed
Executive Engineer
Office of Executive Engineer Electricity 400 KV Sub Station Division Motiram Adda, Gorakhpur
Cost Estimate for Removing old and used control cable at 400 KV Sub Station Motiram Adda, Gorakhpur Under Electricity 400 KV Sub Station Division Gorakhpur.
2026_UPTCL_1131146_1
E-TENDER No. 34/400KV/SSD/GKP/2025-26
Open Tender
Electrical Works
60 days
E400 KV S/S Motiram Adda
Please refer Tender Documents
2 documents required · 2 mandatory
₹590
Yes
EE E400 KV S/S Division Gorakhpur
₹2,000
Yes
8 May 2026
28 Mar 2026
29 Apr 2026
28 Mar 2026
28 Apr 2026
28 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Extraction and removal of useless/defective control cable of 400 KV switchyard and 200 KV switchyard of different equipment installed at 400 KV Sub Station Motiram Adda, Gorakhpur by tracking one from either panel side or equipment side then after rolling the cable from one end for macking bunch and then shifting of these bunches from work side to store with all other associated work. | - | - | - | - | |
2 CX 2.5 sqmm | - | KM | - | - | |
4 CX 2.5 sqmm | - | KM | - | - | |
6 CX 2.5 sqmm | - | KM | - | - | |
10 CX 2.5 sqmm | - | KM | - | - | |
14 CX 2.5 sqmm | - | KM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
TECHNICAL_34.pdf
Tender Documents • 1.08 MB
BOQ_2110394.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid