Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NO 87 NEW BALAJI NAGAR ATTIPATTU CHENNAI 600 120 | CHENNAI | CHENNAI | TAMIL NADU | 600120 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
27 Nov 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE-ES
SUPERINTENDING ENGINEER/ ELECTRICAL SYSTEM, NCTPS-I, CHENNAI-120
NCTPS I ES Circle EM I Dn GM S Dn II Estimate for Unit I Annual Overhauling of 6 6 KV Switchgear panels 6 6KV 15 75KV busduct USS BMCC BVDC TVDC N E SBMCC SSSA switchgear and all LT bus duct of Unit I during the Annual Ove
2020_EB_185148_1
SE ES NCTPS I WC No 85 2020 21
Open Tender
Power/Energy Projects/Products
Works
15 days
NCTPS-I
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2,000
Yes
7 Dec 2020
13 Nov 2020
30 Nov 2020
13 Nov 2020
27 Nov 2020
13 Nov 2020
90 days
Amount
I. HT Switchgear Charges for releasing all inspection covers of bus ducts, checking of Initial IR value, thorough cleaning by applying Acetone / IPA and checking healthiness of supporting insulators & tightness checking of bus bar joints and checking of healthiness of Rubber bellows for the Incomer & Tie bus ducts of one bus (U1A 6.6KV Switchgear bus duct)
Charges for releasing all inspection covers of bus ducts, checking of Initial IR value, thorough cleaning by applying Acetone / IPA and checking healthiness of supporting insulators & tightness checking of bus bar joints and checking of healthiness of Rubber bellows for the Incomer & Tie bus ducts of one bus (U1B 6.6KV Switchgear bus duct)
Charges for releasing all inspection covers of bus ducts, checking of Initial IR value, thorough cleaning by applying Acetone / IPA and checking healthiness of supporting insulators & tightness checking of bus bar joints and checking of healthiness of Rubber bellows for the Incomer & Tie bus ducts of one bus ( C1A - U1A link bus duct)
Charges for releasing all inspection covers of bus ducts, checking of Initial IR value, thorough cleaning by applying Acetone / IPA and checking healthiness of supporting insulators & tightness checking of bus bar joints and checking of healthiness of Rubber bellows for the Incomer & Tie bus ducts of one bus (C1B - U1B link bus duct)
Charges for dismantling and assembling of all the inspection covers, checking tightness & healthiness of supporting insulators and internal cleaning of 15.75 KV bus duct of GT (15.75 KV 'R' 'Y' 'B' busduct of GT-I)
Cleaning of Excitation Transformer & its cooling fan & its ducts ( 04 Nos) (Cleaning of Excitation transformer and its cooling fan and its duct)
Charges for cleaning and lubricating of all moving parts of HT breakers, upper and lower pole arms, vacuum bottles with Acetone / IPA. All bolts and nuts tightness checking, checking healthiness of Interrupters, closing / Tripping operations mechanically and checking of IR value for 1 No. breaker . (U1A 6.6KV Switchgear panels)
Charges for cleaning and lubricating of all moving parts of HT breakers, upper and lower pole arms, vacuum bottles with Acetone / IPA. All bolts and nuts tightness checking, checking healthiness of Interrupters, closing / Tripping operations mechanically and checking of IR value for 1 No. breaker(U1B 6.6KV Switchgear panels)
Charges for Inspection & cleaning of Bus PT cubicle, SP cubicle and checking tightness of Bus PT & SP (Bus PT cubicle (LAVT cubicle)
II. LT Switchgear Cleaning of all the modules, cleaning & healthiness checking of power contactor tips and replacing if necessary, terminal tightness of all components, checking & cleaning of finger contacts in breaker with IPA, healthiness of spring charging motors and the mechanisms, terminal tightness of all components of breakers and checking their operations. (USS 1A SWGR)
Cleaning of all the modules, cleaning & healthiness checking of power contactor tips and replacing if necessary, terminal tightness of all components, checking & cleaning of finger contacts in breaker with IPA, healthiness of spring charging motors and the mechanisms, terminal tightness of all components of breakers and checking their operations. (USS 1B SWGR)
Cleaning of all the modules, cleaning & healthiness checking of Power Contactor tips and replacing if necessary, termination tightness of all components, cleaning the breakers with IPA, healthiness of spring charging motor, termination tightness of all components and checking breaker operations and refixing the modules and breakers in the respective panels. (BMCC 1A & 1B SWGR)
Cleaning of all the modules with IPA, cleaning & healthiness checking of Power Contactor tips and replacing if necessary, terminal tightness of all components, and refixing the modules in the respective panels.(SBMCC -1 SWGR)
Cleaning of all the modules, cleaning & healthiness checking of power contactor tips and replacing if necessary, termination tightness of all components, checking & cleaning the Isolator switches. (N/E SWGR)
Cleaning of all the modules, cleaning & healthiness checking of Power Contactor tips and replacing if necessary, termination tightness of all components, cleaning the sliding contacts with IPA and refixing the modules in the respective panels. (BVDC & TVDC (VMCC) SWGRs)
III. 6.6KV ST -I Charges for releasing and Re-fixing all inspection covers of bus-ducts, checking of Initial IR value, thorough cleaning by applying Acetone / IPA and checking healthiness of supporting insulators & tightness checking of bus bar joints and checking of healthiness of Rubber bellows for the In-comer & tie bus ducts of C1 Bus. (C1 A & B incomer & Tie busduct)(ST-I to C1A)(ST-I to C1B)
Charges for cleaning and lubricating of all moving parts of HT breaker upper and lower pole arms, vacuum bottles with Acetone / IPA. All bolts and nuts tightness checking, checking healthiness of Interrupters closing / Tripping operations mechanically and checking of IR value for 1 No. panel.(C1A & C1B SWGR)
Complete overhauling of LT station Bus (SSSG) for SWGR. 1) Releasing the Top covers and side covers of the bus chamber, checking IR value and releasing out all the modules (78 Nos).(for 1 No. SSSG LT bus)
A.R.C.ENGINEERING
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .