Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 1008 A PREMIER ENGINEERING COMPANY PURVI RITHANI MEERUT DELHI ROAD MEERUT UTTAR PRADESH 250103 INDIA | MEERUT | UTTAR PRADESH | 250103 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹8,400
Closing Date
26 Feb 2020, 11:30 amClosed
EX. ENGINEER (E AND M) W-S (SOUTH-WEST)
D BLOCK OHT OPP DESU COLONY JANAKPURI NEW DELHI-58
Renovation of Alstom make transformer installed at Command Tank 2 in Dwarka Subcity.
2020_DJB_188312_21
NIT no. 22(2019-20)EE(EandM)WS-SW
Open Tender
Civil Works
Works
60 days
OFFICE OF THE EX. ENGINEER (E AND M) W-S (SOUTH-WE
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
DJB EMD Ac No. 50448339804
₹8,400
2 Mar 2020
19 Feb 2020
26 Feb 2020
19 Feb 2020
26 Feb 2020
19 Feb 2020
Renovation /servicing of ALSTOM make transformer 1000KVA 11/3.3KV 3phase,50Hz at CT-2 BPS by carrying out the following Jobs Dismantling of transformer by de-energize from supply, disconnecting the incoming /outgoing HT cable connection ,Removing the top cover ,oil tank, silica gel breathers etc.
Draining the complete oil of transformer in empty drums by machine
Dismantling of conservator pipe line and cover gasket i/c dismantling of HT /LT bushing connection
Cleaning the transformer oil tank and removing the sludge settled in the bottom with the help of vacuum pressure cleaning machine thoroughly
Providing of HT side insulator complete with oil seal metallic parts bushing rod with copper nuts as required
Replacement of tap changer
Cleaning of core and winding of transformer with hot oil and proper safety precaution to prevent the winding damage as required .cutting the overheated insulation of winding and re-insulation of weak point with the help of HT insulation material and proper taping etc.
Providing of silica gel as required
Providing of gaskets of Top cover of conservator etc.& RTV paste to be provided to stop leakage. Replacement of fasteners’ a required for fitting of the conservator also in its position.
Providing of transformer oil Make: Savita
Filtration & dehydration of Transformer oil in both transformer
Assembling /fitting of the above parts by tri-pod chain pully or crane from the transformer i/c making connection HT/LT sides after degreasing and removing dust/oil from the external surface of transformer, cooling fins for natural cooling & testing with provision of necessary barriers, warning signals and other safety measures during execution of work. Di-electric Testing, Complete testing on load at site.
arun engineers and contractors
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .