| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-Finance | L1 | Accepted-Finance Lowest quoted | |
| 2 | L2₹8.5 L+₹18,430 (2.23%)Rejected-Finance | L2 | Rejected-Finance Highest quoted |
| Sl No | Description | Qty | Unit | Sri Vaideeswara & Co L1 | T Vaithy L2 |
|---|---|---|---|---|---|
| 1.00 | Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam (WMM ) soecification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers | 14 | m3 | 2,231 ₹31,234 Lowest | 2,278 ₹31,892 |
| 1.10 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bitumi | 134 | m2 | 83 ₹11,122 Lowest | 85 ₹11,390 |
| 1.20 | Providing and laying tack coat of 2.5 kgs/10 sqm over the Prime surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of b | 134 | m2 | 18 ₹2,412 Lowest | 18 ₹2,412 Lowest |
| 1.30 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | 1,978 | m2 | 26 ₹51,428 Lowest | 27 ₹53,406 |
| 1.40 | Advance Patch work 13.20mm Providing Advance Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bitumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric gauge for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat separately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications | 14 | m3 | 4,332 ₹60,648 Lowest | 4,424 ₹61,936 |
| 1.50 | Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00-9.50mm graded metal, 0.17 cum of 9.50-2.36mm graded metal and 0.26 cum of 2.36 and below metal by adding the shredded plastic 10% of bitumen quality 5.03Kg (50.30x10%=5.03Kg) s | 63 | m3 | 10,632 ₹6,69,816 Lowest | 10,858 ₹6,84,054 |
Tender Value
₹9.9 L
EMD Value
₹9,900
Closing Date
4 Sept 2025, 3:00 pmClosed
THE COMMISSIONER, SALEM CITY MUNICIPAL CORPORATION
Salem City Municipal Corporation, Fort Main Road, Salem.
Providing Advance B.T. Patch work a Old Market road,River side road,Anna Nagar Main Road ( Housing Board),Thirumani Naalangadi Main road, in Division No.29 and 31 Zone II, Salem Corporation.
2025_MAWS_598285_1
E6-Est No 348-B-2024-2025
Open Tender
Civil Works
Lump-sum
30 days
SALEM CITY MUNICIPAL CORPORATION
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹9,900
26 Sept 2025
28 Aug 2025
4 Sept 2025
28 Aug 2025
4 Sept 2025
28 Aug 2025
Amount
Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam (WMM ) soecification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bitumi
Providing and laying tack coat of 2.5 kgs/10 sqm over the Prime surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of b
Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications
Advance Patch work 13.20mm Providing Advance Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bitumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric gauge for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat separately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00-9.50mm graded metal, 0.17 cum of 9.50-2.36mm graded metal and 0.26 cum of 2.36 and below metal by adding the shredded plastic 10% of bitumen quality 5.03Kg (50.30x10%=5.03Kg) s
T Vaithy (BID ID -1443317)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .