| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.6 CrAccepted-AOC 10 1 JAMIR LANE BALLYGUNGE KOLKATA 700019 | KOLKATA | KOLKATA | WEST BENGAL | 700019 | ₹18.6 Cr | L1 | Accepted-AOC 1ST LOWEST |
| 2 | L2₹21.9 Cr+₹3.3 Cr (17.5%)Rejected-Finance KISMATDAPAT TRIMOHINI HILI DAKSHIN DINAJPUR | HILI | DAKSHIN DINAJPUR | WEST BENGAL | ₹21.9 Cr+₹3.3 Cr (17.5%) | L2 | Rejected-Finance MORE THAN 1ST LOWEST |
| 3 | L3₹27.0 Cr+₹8.4 Cr (45.2%)Rejected-Finance | ₹27.0 Cr+₹8.4 Cr (45.2%) | L3 | Rejected-Finance MORE THAN 1ST LOWEST |
| 4 | Rejected-Technical | - | - | Rejected-Technical NOT QUALIFIED DUE TO NON SUBMISSION OF CORRIGENDUM AS PER CLAUSE NO. 4.1 OF NIT |
| 5 | Rejected-Technical D V C PARA P O MEMARI DIST PURBA BARDHAMAN PIN 713146 | MEMARI | PURBA BARDHAMAN | WEST BENGAL | 713146 | - | - | Rejected-Technical NOT QUALIFIED DUE TO NON SUBMISSION OF CORRIGENDUM AS PER CLAUSE NO. 4.1 OF NIT |
Tender Value
₹27.4 Cr
EMD Value
₹50 L
Closing Date
28 Jan 2026, 3:00 pmClosed
SE/CTU
Central Tender Unit Jalasampad Bhawan, 8thFloor, Salt Lake, Kolkata-700091
Raising and strengthening of Narajole Circuit (NC) Embankment for a length of 32.50 KM at Mouzas. Chandipur, Raikundu, Harirajpur, Kismat Narjol, Kalyanpur, Bachhra Kundu, Ramdevpur, Rajnagar, Hossenpur, Samat, Balipota, Ramdaspur,
2026_IWD_983561_1
WBIW/CTU/CE(SW) /e-NIT- 28 (e)/2025-26
Open Tender
CIVIL WORKS
Percentage
730 days
Chandipu
Please refer Tender documents.
6 documents required · 6 mandatory
₹50 L
Yes
Central Tender Unit Jalasampad Bhawan, 8thFloor, S
1 Sept 2026
7 Jan 2026
29 Jan 2026
7 Jan 2026
28 Jan 2026
7 Jan 2026
14 Jan 2026
Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed. (iii) 15 cm av. diameter
Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. (iii) 15 cm av. diameter
Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site. (a) Width of thinner end above 10 cm. and less than 15 cm. (i) Jhaw / Eucalyptus.
Supplying at site High Density Polyethylene (HDPE) bag of size 0.84 m x 0.38 m conforming to BIS : 14252 : 2015 for bank protective works including all cost of cost of transportation on road by all means,including other incidental charges complete. Note: Payment will be made subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge departmentally. Paragraphs 2.8 including the sub-paragraphs, i.e. 2.8.1 and 2.8.2 under the Chapter of “Specification for Works” in the USoR shall be reproduced and included in the tender document as “Specification and Special Terms & Conditions for High Density Polyethylene (HDPE) Bags” in case of use of this item in the estimate.”
Labour charges for filling HDPE bags with filler materials (earth/sand), machine stitching the open end of the bag with thread as per design and placing the same on slope or dumping from bank within initial lead of 30m and all lifts including carriage and hire charges of all materials and equipments but excluding the cost of filler materials as directed by Engineer-in-Charge (Volume of earth/sand filled bag should not be less than 0.0328 cum).
Earthwork in excavation in all kinds of soil for making embankments,repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of. NB :- Measurement to be taken on the basis of stack measurement / pre- post work section measurement after deduction of void as per norms. No extra payment will be made for stacking. A) Beyond 0.500 km and upto 1.00 km
Earthwork in excavation in all kinds of soil for making embankments,repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of. NB :- Measurement to be taken on the basis of stack measurement / pre- post work section measurement after deduction of void as per norms. No extra payment will be made for stacking. B) Beyond 1.00 km and upto 2.00 km
Earthwork in excavation in all kinds of soil for making embankments,repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of. NB :- Measurement to be taken on the basis of stack measurement / pre- post work section measurement after deduction of void as per norms. No extra payment will be made for stacking. C) Beyond 2.00 km and upto 3.00 km
Earthwork in excavation in all kinds of soil for making embankments,repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of. NB :- Measurement to be taken on the basis of stack measurement / pre- post work section measurement after deduction of void as per norms. No extra payment will be made for stacking. D) Beyond 3.00 km and upto 4.00 km
Earthwork in excavation in all kinds of soil for making embankments,repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of. NB :- Measurement to be taken on the basis of stack measurement / pre- post work section measurement after deduction of void as per norms. No extra payment will be made for stacking. E) Beyond 4.00 km and upto 5.00 km
Earthwork in making new embankment / ring bundh/ retired embankment by excavation of earth from borrow pits in all kinds of soil including making berms and depositing the same in layers not exceeding 25 cm. as per profile within an initial lead of 30 metre and lift of 1.5 metre including cost of nicking outlines, dug-belling, putting profiles, cutting and removing thick and thorny jungles, uprooting trees and stumps of all sizes upto 30 cm., girth from the site alignment as per direction of the Engineerin- Charge including dewatering, removal of weeds, carcasses, organic matter etc., if any, breaking clods, rough dressing, watering, ramming, compacting etc. complete. (Work to be executed on section measurement by pre-work & post-work level section) A. Where land for earth owned/arranged by the Department.
Extra rate over Item Nos.11.0, for all kinds of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres. One EXTRA LEAD
Extra rate over Item Nos.11.0, for all kinds of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres. TWO EXTRA LEAD
Extra rate over Item Nos.11.0 for all kinds of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres. THREE EXTRA LEAD
Extra rate over Item Nos.11.0 for all kinds of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres. FOUR EXTRA LEAD
Extra rate over Item Nos.11.0 for all kinds of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres. FIVE EXTRA LEAD
Supplying at site and laying in position UV stabilized polypropylene woven geotextile of 430 gsm as filter, as per specification, including cost of preparing the bed, placing the geotextile as per profile with at least 15cm lapping, wherever required and anchorage at top, sewing / welding the overlapped portion, storage and transportation by all means, complete as per direction of the Engineer-in-charge. Note: 1. Payment to be made on measurement of finished surface without lapping, but including anchoring length at top. 2. Payment will be made subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge departmentally. Paragraphs 2.7.7, 2.7.9 and 2.7.10 under the Chapter of “Specification for Works” in the USoR shall be reproduced and included in the tender document as “Specification & Special Terms & Conditions for Geotextile” in case of use of this item in the estimate. 3. This particular item is to be used in special cases, either in continuation of previous usage or after offering adequate justification from techno-economical angles.
Testing of Geo-textile materials including UV Test from well eqipped laboratories like Jadavpur University, BITRA, CIPET etc.) (This item is applicable only for third party testing conducted by the Engineer-in-charge to assure the quality of the Geo- textile material)
Coal tarring with 5% pitch including cost of material and labour complete as per direction of the Engineer-in-charge a) One Coat
Compacting earthwork in embankment in layers of 25 cm. by power roller or by any other mechanical means, like tractor driven sheep foot roller/ vibrating plate compactor earth rammer etc., (not at OMC) including necessary watering, labour charges, hire charges of all materials, tools & plants etc. and including cost and supply of all materials complete as per direction of the Engineer-in-charge. (Payment will be made on the basis of Pre-work & Post-work level)
Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. To be measured at mid length).
Driving bamboo pins in standing or flowing water including scaffolding and driving appliances Where boats are not necessary
Supplying, fitting and fixing with iron nails half split bamboo wailingpieces (av. Dia. Of bamboo not less than 5.0 cm.)
Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incidental charges etc. all complete (capacity 50 kg)."
Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or aggregates(stone / brick) and sewing as done in case of cement bags ,(tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag.
Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts.
Extra rate for item no above for each additional lead of 60 metre or part thereof beyond the initial lead of 30 metre.
Making filter with well graded 40 mm down ballasts and laying uniformly behind weep holes, below pitching on bed, side slopes including supply and carriage of all materials to site including preparing bed with earthwork up to 30 cm depth, where necessary and compacting with wooden malllet after laying to achieve designed section as per direction of the Engineer- in - Charge (measurements will be on finished work / in stack after deducting necessary void).) "
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.73 MB
BARCHART1.pdf
Tender Documents • 0.83 MB
WB2911.pdf
Tender Documents • 1.86 MB
BOQ_2399909.xls
BOQ • 0.40 MB
DRAWING1.pdf
Tender Documents • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .