Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
Closing Date
4 Jun 2024, 5:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Accessories Division, Lucknow
HINDUSTAN AERONAUTICS LIMITED Accessories Division, Lucknow Post Office, Lucknow - 226 016 Uttar Pradesh, India
INVITATION FOR EXPRESSION OF INTEREST EOI FOR INDIGENISATION OF ASSEMBLY SLIP RING FOR ALTERNATOR OF JAGUAR AIRCRAFT UNDER HAL MAKE II PROCEDURE
7349
HAL/ADL/INDG/INST/ALT/SLIPRING/2024
Works
Accessories Complex - Lucknow Divn - Bonded Purchase - Instrument
₹0
Exempted
4 Jun 2024
8 May 2024
8 May 2024
4 Jun 2024
Project entails indigenous design, development and manufacture of Assembly Slip Ring for use in Alternator of Jaguar aircraft.
Draft specifications for Assembly Slip Ring are detailed in “Annexure A” along with its provisional drawing. However, for better understanding of Assembly Slip Ring, awarded vendor may collect sample from HAL, Lucknow.
Final qualification test requirement shall be evaluated during development process in co-ordination with approving agency & Indigenization committee at HAL, Lucknow.
Material used for manufacturing of Assembly Slip Ring should be airworthy and COC (Certificate of Conformance) of material used should be available whenever it is required for verification. In case any alternate material is proposed by the vendor then also the material should be airworthy and manufacturing of Assembly Slip Ring should be done after taking approval of material substitution by regulating authorities.
Material Proposed by vendor for manufacturing of Assembly Slip Ring should be filled in the chart below: SL# Part Original Material Proposed Material 1 Varnish Poltmide Varnish (Rhodeftal-210ES) 2 Moulding Compound Micaver 3 Collecting Ring Industrial Bronze NS5 4 Wire Not Known 5 Hub Half hard steel XC38f 6 Other parts Not Known
The Initial estimated volume of Assembly Slip Ring for 03 years is around 120 Nos. However, this requirement is arrived considering the stock available & pending purchase orders, so once the existing BOF stock is consumed the requirement of these items will increase and Assembly Slip Ring will be required for entire life of aircraft subjected to the customer order.
Once the product is successfully developed and production clearance / type approval is received from CEMILAC, the production order will be placed on successful development agency. It is to be noted that development shall be as per HAL Make-II procedure (Refer HAL MAKE-II Procedures provided on HAL website).
Time line for manufacturing and certification of Assembly Slip Ring should not be more than 12 months.
Assembly Slip Ring should be identical in form, fit and function with the existing Assembly Slip Ring. The weight of the Assembly Slip Ring should not be more than that of BOF.
All necessary design documents required for airworthiness certification including drawings, material test certificate, manufacturing process layouts etc. shall be prepared by the developing agency (DA) and approved by airworthiness agency as applicable. However, Indigenization Committee at HAL, Lucknow will co-ordinate between DA and airworthiness agency.
The vendor shall do necessary procurement along with COC (Certificate of Conformance) traceable to OEM as per approved document.
The development procedure and Airworthiness Certification (Type Approval / Production Clearance) of Assembly Slip Ring shall be as per latest version of IMTAR.
All development activities shall be done by vendor in co-ordination with RCMA, ORDAQA and HAL Indigenization / QC as defined in latest version of IMTAR-21 & AFQMS
Vendor on which PO is placed shall manufacture the Assembly Slip Ring based on the Drawings, draft specification & samples collected from HAL, Lucknow (refer para-3.2). Vendor shall provide its compliance to Scope of Project given at para – 3.
Vendor shall provide 05 Nos. of Assembly Slip Ring (Free of Cost) for end use testing as per the test procedures finalized by regulating authorities.
Vendor shall absorb any minor changes in test requirements, if encountered during reviews, integration and certification of the Assembly Slip Ring to meet the requirement.
Vendor shall absorb any minor changes in test requirements, if encountered during reviews, integration and certification of the Assembly Slip Ring to meet the requirement.
Vendor shall commit for trouble free and obsolescence free supply of Assembly Slip Ring for next 20 years.
Only Original Equipment Manufacturer (OEM), with proven expertise in manufacturing of similar items are requested to participate in the EOl.
Prior experience- The vendor should be with full knowledge in the field of manufacturing and supply of similar item / system. Vendor should have developed /supplied in last 5 years same /similar /advanced specification type items.
Details of similar projects (if any) completed by vendor including contact addresses of the existing customers should be provided (necessary documentary proof shall be provided).
If vendor has any dealing with Indian Air Force for similar items, the same shall be provided with contract / P.O. details.
Vendor shall define quantitatively amount of import (if to be used) in development and indigenous content for Assembly Slip Ring, it should not be less than 50% by value. Vendor has to provide a self-declaration in this regard. HAL team may verify the documentary evidence to confirm the given indigenous contents after scrutiny.
Vendors shall confirm that they have read and understood the HAL Make-II Procedure as provided on HAL website and would abide by the procedure and condition stated therein. In case of any ambiguity between EOI document and HAL Make-II procedure, HAL Make-II procedure will be the final.
The prospective vendor should provide details of manufacturing facilities, details of current capabilities (technical expertise) related to design, manufacture, certification and supply of the proposed items.
The prospective vendor should have AS9100 rev D accreditation (please attach supporting document).
Based on the Technical evaluation of EOI responses received, HAL will evaluate the vendors based on the Compliance of EOI T&C.
For Technical evaluation, following documents to be submitted by vendors: -Compliance Sheet for acceptance of Scope of Project/ Technical Terms and conditions & eligibility criteria as specified in EOI(refer Annexure-C) -Support documents for submission as mentioned in EOI.
HAL may visit the vendor’s place for audit purpose during vendor evaluation based on the EOI responses.
Vendor's credential: i) Detail of Business Establishment-Certificate of incorporation, Memorandum of Association under companies Act 1956/partnership Deed etc ( As applicable). ii) In case of proprietary Company/Public Partnership Company where firm registration is not mandatory, full address of office and proof thereof certified from notary. iii) Copy of PAN and GST registration required.
The Scope of Project for Indigenisation of Assembly Slip Ring as per para 3 is only tentative in nature and are subject to change. This may be considered only as advance information for market exploration. a) HAL will freeze the technical scope based on response to this EOl and as deemed necessary at the time of issuing RFP (Request for Proposal) at HAL’s discretion. b) Compliance against each requirement of para 3 of this document (Scope of Project) and para 4 of this document (Evaluation Criteria) should be provided in a matrix form by the vendor in the technical offer (refer Annexure-B)
The potential vendor can propose suitable and proven solution to meet HAL’s EOl requirements.
This document is not intended to form the basis of any decision to purchase / finalize contract and it does not constitute an offer or invitation or solicitation of an offer to purchase.
Based on the evaluation of EOI proposals received, HAL will finalize Technical Specification/ Drawings of Assembly Slip Ring and float Request for Proposal (RFP) at HAL’s discretion.
Minimum following documents are required to be submitted by respondents a) Technical Offer b) Budgetary offer – ROM(Rough Order of Magnitude) Cost for Design & Development and Production unit separately along with all Taxes & duties c) Documents in proof of evaluation criteria.
Please submit your response along with documents stipulated in the EOI uploaded on e-portal. Response to bid through e-procurement should be uploaded in the e-portal only.
Responses submitted in any other form, such as courier/ post/ in-person/ fax/ telegram/ telex, shall not be accepted against this EOI. No hard copy of the offer is to be sent. The detailed technical literature is to be uploaded in PDF format.
Bidders are advised, in their own interest, to ensure that their responses/ bids are submitted well before the "Due Date & Time of Bid/response-Submission" of the EOI as HAL's "e-Procurement System" at -https://eproc.hal-india.com will not allow submission of bids once the closing date and time of the Tender (i.e. Due Date & Time of Bid-Submission) is reached.
HAL shall not be responsible if bidder is not able to submit the bid on account of failure in network / internet connection at bidder's end.
A company can submit only one response.
Bid shall be opened as per schedule indicated on e-portal. The date fixed for opening of bid, if subsequently declared as holiday, revised date of schedule will be notified. However in absence of such notification, the bid will be opening on next working day at same time.
The Competent Authority reserves the right to reject any or all the bids/responses without assigning any reason and the decision of the competent authority of the Accessories Division, Hindustan Aeronautics Limited, Lucknow shall be final and binding.
This EoI is being invited with no financial commitment on part of HAL. HAL reserves the right to withdraw or change or vary any part thereof at any stage. HAL also reserves the right to disqualify any company should it be so necessary at any stage on grounds of national security.
Bidder would be disqualified if they make false, incorrect, or misleading claims in their response to this EOI.
HAL/ADL/INDG/INST/ALT/SLIPRING/2024
Part Number
Total Price without any GST or Taxes (INR)
ASSEMBLY SLIP RING Estimated Unit Price (Rough order of magnitude) inclusive of amortized design & development and other cost.
Grand Total
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
raw.json
RAW_JSON
AnnexureESelfCertification.pdf
TENDER_DOCUMENT • 0.19 MB
HALMakeIIProcedure.pdf
TENDER_DOCUMENT • 0.61 MB
AnnexureCTechnicalComplianceMatrixSlipRing.xlsm
TENDER_DOCUMENT • 0.02 MB
AnnexureBPriceBid.xlsm
TENDER_DOCUMENT • 0.02 MB
EOISLIPRING.pdf
TENDER_DOCUMENT • 1.56 MB
AnnexureASpecifications.pdf
TENDER_DOCUMENT • 1.59 MB
AnnexureFGFR144.pdf
TENDER_DOCUMENT • 3.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .