| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 CrAdmitted-Finance | ₹2.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.9 Cr+₹9.0 L (3.23%)Admitted-Finance NO 74 SADRAS MAIN ROAD NARASANKUPPAM VILLAGE 603109 MULLIKULATHUR POST THIRUKKAZUKUNDRAM TALUK CHENGALPATTU DISTRICT | CHENGALPATTU | TAMIL NADU | 603109 | ₹2.9 Cr+₹9.0 L (3.23%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not meeting the NIT eligibility criteria of similar works |
| Sl No | Description | Qty | Unit | VNV ENGINEERS AND CONSTRUCTION L2 | SEKAR CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation by mechanical means (Hydraulic excavator) or manual means for foundation, substructures, plinth beam, cess pits & trenches, all kinds of foundation etc., in all types of soil like hard gravelly soil, sandy soil for the following depth from average ground level up to the required founding level, line and grades in both dry and wet conditions including shoring, strutting, bailing out of water if necessary, leveling and ramming the bottom of trenches, dressing of sides, stacking the excavated materials away from the edge of trenches, refilling the sides of foundation as required with selected excavated earth and depositing / disposing the surplus excavated earth (Disposed soil to be leveled by breaking clods, if any and neatly dressed and leveled) within the lead specified below all complete as per specifications and as directed by the Engineer-in-charge. All kinds of soil with depth up to 1.5m below average Ground level and disposing surplus excavated earth up to a lead of 50 meters. | 680 | Cum | 800 ₹5,44,000 Lowest | 850 ₹5,78,000 |
| 2.00 | Earthwork excavation by mechanical means (Hydraulic excavator) or manual means for foundation, substructures, plinth beam, cess pits & trenches, all kinds of foundation etc., in all types of soil like hard gravelly soil, sandy soil for the following depth from average ground level up to the required founding level, line and grades in both dry and wet conditions including shoring, strutting, bailing out of water if necessary, leveling and ramming the bottom of trenches, dressing of sides, stacking the excavated materials away from the edge of trenches, refilling the sides of foundation as required with selected excavated earth and depositing / disposing the surplus excavated earth (Disposed soil to be leveled by breaking clods, if any and neatly dressed and leveled) within the lead specified below all complete as per specifications and as directed by the Engineer-in-charge. All kinds of soil with depth exceeding 1.5m but not exceeding 3m below average Ground level and disposing surplus excavated earth up to a lead of 50 meters. | 80 | Cum | 875 ₹70,000 Lowest | 900 ₹72,000 |
| 3.00 | Earthwork excavation by mechanical means (Hydraulic excavator) / manual means for foundation, substructures, plinth beam, cess pits & trenches all kinds of foundation etc., in soft rock for the following depth from average ground level up to the required line, level and grades in both dry and wet conditions including shoring, strutting, bailing out of water if necessary, leveling and ramming the bottom of trenches, dressing of sides, stacking the excavated materials away from the edge of trenches, refilling the sides of foundation as required with selected excavated earth and depositing / disposing the surplus earth (Disposed soil to be leveled by breaking clods, if any and neatly dressed and leveled) with an lead specified below and stacking the soft rock boulders in a neatly leveled ground for measurement to departmental gauge all complete as per specifications and as directed by the Engineer-in-charge. All kinds of soft rock with depth exceeding 1.5m but not exceeding 3m below average Ground level and disposing surplus excavated earth up to a lead of 50 metres. | 50 | Cum | 1,930 ₹96,500 Lowest | 2,000 ₹1,00,000 |
| 4.00 | Earthwork excavation for foundation, substructures, plinth beam, cess pits & trenches, and all kinds of foundation etc., in hard rock (by chiseling) for the following depth from average ground level up to the required line, level and grades in both dry and wet conditions including shoring, strutting, bailing out of water if necessary, leveling and ramming the bottom of trenches, dressing of sides, stacking the excavated materials away from the edge of trenches, refilling the sides of foundation as required with selected excavated earth and depositing / disposing the surplus earth (Disposed soil to be leveled by breaking clods, if any and neatly dressed and leveled) with an lead specified below and stacking the hard rock boulders in a neatly leveled ground for measurement to departmental gauge all complete as per specifications and as directed by the Engineer-in-charge. All kinds of hard rock with depth exceeding 1.5m but not exceeding 3m below average Ground level and disposing surplus excavated earth up to a lead of 50 metres. | 20 | Cum | 5,000 ₹1,00,000 | 4,500 ₹90,000 Lowest |
| 5.00 | Filling with selected excavated earth available at site up to a lead of 200m, filling in layer of not more than 150mm thickness, each layer well rammed and consolidated by hand/earth rammer including excavation of dumped earth, hire charges of rammer, water consolidation, leveling to proper gradient, dressing the top surface to the required level, complying with specification and all as directed by the Engineer. | 500 | Cum | 300 ₹1,50,000 Lowest | 320 ₹1,60,000 |
| 6.00 | Supplying and filling the selected earth from outside of DAE installation (with a lead of 28 kilometers), including excavation from borrow pits if any required, filling in layer of not more than 150mm thick, each layer well rammed and consolidated by mechanical roller including water consolidation etc., leveling, dressing the top surface to the required level, complying with standard specification and as directed by the Engineer-in-charge. Note: Proper Trip sheet records shall be maintained for bringing the earth through DAE main gate with security stamp duly signed by Departmental Engineer. | 120 | Cum | 1,430 ₹1,71,600 Lowest | 1,500 ₹1,80,000 |
| 7.00 | Leveling the area to the required gradient in all types of soil including cutting the mounds wherever required, for filling the low lying area in layers not more than 150mm thickness, each layer well rammed and consolidated by hand/mechanical roller including ramming, consolidation, leveling to proper gradient, dressing the top surface to the required level, conveying the surplus excavated soil by head load up to a lead of 200m, all complete as directed by Engineer-in-charge. | 50 | Cum | 330 ₹16,500 Lowest | 350 ₹17,500 |
| 8.00 | Providing and laying plain cement concrete 1:3:6 using 40mm maximum size graded aggregates including mechanical mixing, transporting and placing in required position, ramming, compaction, leveling, curing, shuttering, dewatering if any, complete all as per specification for leveling courses in foundation for walls, footings, floor drains etc., encasing pipes and other required works directed by Engineer-in-Charge complete all as per specifications. | 50 | Cum | 9,000 ₹4,50,000 | 8,500 ₹4,25,000 Lowest |
| 9.00 | Supplying, fabricating, erecting and fixing in position at all levels, centering and shuttering to correct line and levels including strutting, propping, etc., with necessary bracings in all axes to give a stable assembly with provision for making the joints in the shuttering fully leak proof and with provision for fixing coil nuts with tie rods along with suitable channel for lateral supports and for inserts, projecting dowels, anchor bolts or any other fixture, including staging, access and working platforms etc., all complete as specified and directed including dismantling and removing the aforesaid assembly after the concrete attains the sufficient strength to self-support itself without cracking and distortion all as per specification, including all materials and labour complete in all respects at all lifts. The measurement for the formwork will be the actual area of forms in contact with concrete surfaces. Shuttering with plywood panels alone will be permitted. | 2,450 | Sqm | 1,100 ₹26,95,000 | 1,050 ₹25,72,500 Lowest |
| 10.00 | Providing, straightening, decoiling wherever necessary bending, cutting, binding and fixing in position steel reinforcement TMT bars of Fe500D grade steel conforming to IS:1786 'SAIL or VIZAG or approved equivalent make' and tying with approved annealed binding wire of 1.6mm dia in all reinforced cement concrete work at all lifts, including cost of supplying and fixing the spacer/cover blocks and binding wire complete all as per specification and as directed by Engineer-in-Charge at all lifts. Note: The rate shall be including the cost of reinforcement steel. The reinforcement steel will be procured from dealers with a test certificate as approved by the department. For further details please see Clause 11 of Section VIII, General Information for Guidance of Tenderers. | 65 | MT | 1,12,000 ₹72,80,000 | 1,11,000 ₹72,15,000 Lowest |
Tender Value
₹2.6 Cr
EMD Value
₹5.2 L
Closing Date
25 Sept 2025, 3:00 pmClosed
General Manager, INRP(K)
Office of GM, 608 Building, BARC, Kalpakkam
Construction of Exhaust Building for SWPB at CWMF, BARCF, Kalpakkam
2025_BARC_877051_1
BARCF/INR-PRJ/CI/TR/11/2025
Open Tender
Civil Works - Buildings
Item Rate
150 days
INRPK/NRB/BARC/Kalpakkam
Please refer tender documents
8 documents required · 8 mandatory
₹0
₹5.2 L
16 Oct 2025
12 Sept 2025
26 Sept 2025
12 Sept 2025
25 Sept 2025
12 Sept 2025
12 Sept 2025 - 18 Sept 2025
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.07 MB
tenderdoc.pdf
Tender Documents • 35.38 MB
BOQ_921924.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .