Tender Value
₹4.9 Cr
EMD Value
₹7.3 L
Closing Date
9 Sept 2026, 4:00 pmClosed
Public Works Department
S Nagaraj
Construction of Buddha-Basava-Ambedkar Samskrutika Bhavan in Kukanoor Taluka of Koppal District.
PWD/2026-27/BD/WORK_INDENT39149
PWD/2026-27/BD/WORK_INDENT39149
Open
Buildings
Two Tender Document System(Two Cover)
PWD Division Office Koppala
11 documents required · 11 mandatory
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
List of works for which tenders already submitted
Banker Details for reference
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
As per Clause 3.2(b) : To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2021-22, 2022-23 2023-24, 2024-25 & 2025-26 (b) satisfactorily completed (at least 90% of the contract value) as prime contractor, at least one similar work such as Building Work of value not less than Rs. 243.73 Lakhs. (usually not less than 50% estimated value of contract)
As per Clause 3.2(c) To qualify for award of this contract, each Tenderer in its Name should have in the last fve years i.e., 2021-22 2022-23, 2023-24, 2024-25 and 2025-26 (c) executed in any one year, the following minimum quantities of work (a)Earthwork Excavation-2157.00Cum.(b)RCC/ PCC-666.00 Cum(c)BBM-260.00Cum(d)TMT Steel-51.00 Tonne.(e)Plastering-3069.00 Sqm (f)Flooring/Cladding/Dadoing/Skirting-1452.00 Sqm(g)Wood Work-2.00 Cum(h)Structural Steel Work (Truss)-44640.00 Kg..
As per Clause 3.3(a)&(b) : To qualify for award of this contract, Each Tenderer should demonstrate the availability of the machineries/equipment as mentioned1)Transit mixer - 2 Nos. i.e.,1 No. Own, 1 No. Own/Lease/Hire 2)Tippers - 4 Nos : 2 Nos Own, 2Nos. Own/Hire/ Lease 3)Excavators - 2 Nos :1No.Own, 1No. Own/Hire/Lease 4)Water Tankers : 2 Nos. - 1No. Own, 1No. Own/ Hire/Lease. 5)Centering and shuttering:2320.00Sqm -1160.00Sqm Own,1160.00Sqm. Own/ Hire/Lease.6)Concrete Batching plant-1 No.Own.. 7)Pin/Needle Vibrator-4 Nos. - 2No. Own, 2No.Own/ Hire/Lease. 8)Tower Crane/Hydra -1 No.Own/ Hire/ Lease.
As per Clause 3.2(a): To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2021-22, 2022-23 2023-24, 2024-25 and 2025-26 (a) achieved in at least two financial years a minimum financial turn over (in all classes of civil engineering construction works only) of Rs. 974.91 Lakhs. (usually not less than two times the estimated annual payments under this contract)
As per Clause 3.3(c) : To qualify for award of this contract, Each Tenderer should further demonstrate: Liquid assets and /or availability of credit facilities of not less than Rs.132.95 Lakhs.(Credit lines/ letter of credit/ certificates from banks for meeting the fund requirement etc. (usually the equivalent of the estimated cash flow for three months in the peak construction period)
Cost of work for which Tenders submitted
Cost of existing commitments and ongoing works
Copy of Registration
Litigation in which the Tenderer is involved.
Principal Place of Business
₹5,000
₹7.3 L
4 Sept 2026
29 Aug 2026
10 Sept 2026
4 Sept 2026
3 Sept 2026
Financial Year Total value of Civil Engineering works executed and payments received in the last five years (in Rs. lakh)
Attach Chartered Accountant's Yearwise Statements.
Work executed as prime contractor (in the same name) on works of similar nature during the five years specified)
Project Name Name & Address of the Employer Name of Work Contract Number Value of contract Rs. Lakhs Date of Markout /Date of Handing over of site Specified period of completion (including/excluding Monsoon Actual date of completion Remarks (appreciation letter received for early completion or reasons, if there is delay in completion)
Attach Workdone Certificate for each work indicated above, in Format 3, obtained from the Competent Authority
FORMAT FOR WORK DONE CERTIFICATE TO BE OBTAINED FROM COMPETENT AUTHORITY
has executed/ is executing(strike off which ever is not applicable) the work of .............................................
in this Organisation. The details of the work is as under:
1 Name of the Project :
2 Name of the Work :
3 Contract Amount :
4 Date of signing the Agreement :
5 Date of handing over of the Site :
6 Progress * : 2020
January February March April May June July August September October November December
Physical in cum :
Financial in lac :
Physical in cum :
Financial in lac :
Physical in cum :
Financial in lac :
Physical in cum :
Financial in lac :
Others (Pl specify) Physical is cum/sqm :
Financial in lac :
Others (Pl specify) Physical :
Financial in lac :
Progress * : 2021
January February March April May June July August September October November December
Earthwork Physical in cum :
Financial in lac :
Physical in Quintal :
Financial in lac :
Physical in cum :
Financial in lac :
Physical in cum :
Financial in lac :
Others (Pl specify) Physical is cum/sqm :
Financial in lac :
Others (Pl specify) Physical :
Financial in lac :
Progress * : 2022
January February March April May June July August September October November December
Earthwork Physical in cum :
Financial in lac :
Physical in Quintal :
Financial in lac :
Physical in cum :
Financial in lac :
Physical in cum :
Financial in lac :
Others (Pl specify) Physical is cum/sqm :
Financial in lac :
Others (Pl specify) Physical :
Financial in lac :
Progress * : 2023
January February March April May June July August September October November December
Earthwork Physical in cum :
Financial in lac :
Physical in Quintal :
Financial in lac :
Physical in cum :
Financial in lac :
Physical in cum :
Financial in lac :
Others (Pl specify) Physical is cum/sqm :
Financial in lac :
Others (Pl specify) Physical :
Financial in lac :
Progress * : 2024
January February March April May June July August September October November December
Earthwork Physical in cum :
Financial in lac :
Physical in Quintal :
Financial in lac :
Physical in cum :
Financial in lac :
Physical in cum :
Financial in lac :
Others (Pl specify) Physical is cum/sqm :
Financial in lac :
Others (Pl specify) Physical :
Financial in lac :
Progress * : 2025
January February March April May June July August September October November December
Earthwork Physical in cum :
Financial in lac :
Physical in Quintal :
Financial in lac :
Physical in cum :
Financial in lac :
Physical in cum :
Financial in lac :
Others (Pl specify) Physical is cum/sqm :
Financial in lac :
Others (Pl specify) Physical :
Financial in lac :
7 Stipulated Period of Completion (including monsoon)
8 Prescribed Date of completion
9 Actual Date of Completion/ Probable Date of Completion
10 Cost of balance work (if work is in progress) :
11 Reasons if any for delay in completion, if work completion is delayed :
12 Penalty if any imposed :
13 Any other information :
* Monthwise progress shall be furnished seperately.
Date: (Authorised Signatory)
Address for correspondence:
Monthly Physical and Financial Progress Achieved in all Contracts which are referred to in Format 3
Names of Works Item of Work Names of Employers Years Remarks (Indicate contract reference)
January February march April May June July August September October November December
Others Specify Details Physical
Others Specify Details Physical
Others Specify Details Physical
Others Specify Details Physical
Others Specify Details Physical
Others Specify Details Physical
Information on works which are yet to be completed.
(EXISTING COMMITMENTS AND ON-GOING WORKS)
Project Name Name & Address of the Employer Name of Work Contract Number Value of contract Rs. Lakhs Date of Markout /Date of Handing over of site Specified period of completion (including/excluding Monsoon cost of balance works remaining Rs. in lac Probable date of completion
Attach Certificate for each work indicated above, in Format 3, obtained from the Competent Authority
Information of the works for which Tender acceptance letters are received.
Project Name Name & Address of the Employer Name of Work Tendered Amount in Rs lac Specified period of completion (including/excluding Monsoon Probable Date of Handing over of site
Attach letters of Acceptance received.
Information of the works for which Tenderer has submitted Tender.
Project Name Name & Address of the Employer Name of Work Amount put to Tender in Rs lac. Specified period of completion (including/excluding Monsoon Prescribed last date of submission of tender Probable date of decision on the Tender Remarks if any.
List of Machineries Required
Item of Equipment Requirement Owned/ Hired/Leased Owned/ Hired/Lease and available Remarks
No. Capacity Number/Capacity Age/ Condition
BANKER’S CERTIFICATE
This is to certify that M/s. …………………………............... is a reputed company with a good financial standing. If the contract for this work, namely........................................................................................................................................ (Name of the work) is awarded to the above firm, we shall be able to provide overdraft/credit facilities to the extent of Rs. …………...........................................… to meet the working capital requirements for executing the above contract.
Name of the Bank, Senior Bank Manger
Address:…………………………
Information on litigation in which the Tenderer is involved:
Other Party/Parties Employer Details of Dispute Amount involved Remarks showing Present Status
Name of work : Construction of Buddha-Basava-Ambedkar Samskrutika Bhavan in Kukanoor Taluka of Koppal Dist.
STEEL MEASUREMENTS SHEET
SL. NO Description Dia of bar in mm Spacing Nos Length of each bar Total length weight (kg/mtr) Total weight
No of items No of bars
22 Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification a. Buildings Vol-1 (pg no 18, I No 2.11(a))
RC wall footing top & bottom
Bottom Main bars 16 2 2 6.06 24.24 1.580 38.30
Bottom Main bars 20 2 3 6.06 36.36 2.470 89.81
Bottom Main bars 16 1 2 4.92 9.84 1.580 15.55
Bottom Main bars 16 1 2 4.92 9.84 1.580 15.55
Bottom Main bars 16 4 2 2.66 21.28 1.580 33.63
Bottom Main bars 16 1 2 4.05 8.10 1.580 12.80
Bottom Main bars 16 1 2 4.05 8.10 1.580 12.80
Bottom Main bars 16 6 2 3.78 45.36 1.580 71.67
Bottom Main bars 16 4 2 4.06 32.48 1.580 51.32
Bottom Main bars 16 1 2 4.06 8.12 1.580 12.83
Bottom Main bars 16 1 2 4.06 8.12 1.580 12.83
Bottom Main bars 16 2 2 4.06 16.24 1.580 25.66
LB (230x450) staircase landing beam
Bottom Main bars 16 1 3 4.20 12.60 1.580 19.91
Bottom CRT bars 12 1 2 2.80 5.60 0.890 4.99
SL (230x150) railing
Bottom Main bars 8 1 2 10.00 20.00 0.395 7.90
sL (230x150) realing
Bottom Main bars 8 1 2 28.60 57.20 0.395 22.60
L1 (230x230) staircase
Distribution bars 8 0.150 2 4 2.00 16.00 0.395 6.32
Distribution bars 8 0.150 4 3 2.30 27.60 0.395 10.91
Distribution bars 8 0.150 4 3 2.86 34.32 0.395 13.56
Distribution bars 8 0.150 2 2 1.10 4.40 0.395 1.74
Ornamental works
Roman Columns near arches
Roman Columns near arches
Roman Columns near staircase
Front porch bottom moulds columns
Roman Columns at corner
Roman Columns at end
Roman Columns near green room
side porch bottom moulds columns
Roman Columns near side passage
Roman Columns near side passage
Roman Columns near ramp
Bottom Main bars 16 2 3 6.28 37.68 1.580 59.54
Bottom Main bars 20 2 3 6.28 37.68 2.470 93.07
Bottom Main bars 16 2 3 4.92 29.52 1.580 46.65
Bottom Main bars 20 1 3 9.14 27.42 2.470 67.73
Bottom Main bars 16 4 3 2.33 27.96 1.580 44.18
Bottom Main bars 16 1 3 4.05 12.15 1.580 19.20
Bottom Main bars 16 1 3 4.05 12.15 1.580 19.20
Bottom Main bars 16 4 3 4.28 51.36 1.580 81.15
Bottom Main bars 20 2 3 4.46 26.76 2.470 66.10
Bottom Main bars 20 3 2 6.10 36.60 2.470 90.41
Bottom Main bars 20 1 3 6.33 18.99 2.470 46.91
Bottom Main bars 16 2 3 4.56 27.36 1.580 43.23
Bottom Main bars 20 2 2 5.00 20.00 2.470 49.40
Bottom Main bars 20 2 2 7.00 28.00 2.470 69.16
Bottom Main bars 20 1 3 7.00 21.00 2.470 51.87
Bottom Main bars 16 2 2 9.90 39.60 1.580 62.57
Bottom Main bars 16 2 2 9.90 39.60 1.580 62.57
Bottom Main bars 16 2 2 5.00 20.00 1.580 31.60
Bottom Main bars 16 2 2 5.00 20.00 1.580 31.60
Bottom Main bars 16 2 2 5.00 20.00 1.580 31.60
Grid A to B line
Main bar shorter span 10 0.100 1 35 3.96 138.60 0.620 85.94
Top distribution shorter span 10 0.100 1 20 3.96 79.20 0.620 49.11
Top distribution longer span 10 0.100 1 20 3.63 72.60 0.620 45.02
Main bar shorter span 10 0.100 2 15 4.32 129.60 0.620 80.36
Main bar shorter span 10 0.100 2 15 4.32 129.60 0.620 80.36
Grid D to F line 1 to 6
Top distribution shorter span 10 0.100 1 13 12.29 159.77 0.620 99.06
Top distribution longer span 10 0.100 1 10 3.50 35.00 0.620 21.70
Grid D to F line 12 to 17
Top distribution shorter span 10 0.100 1 13 12.29 159.77 0.620 99.06
Top distribution longer span 10 0.100 1 10 3.50 35.00 0.620 21.70
Grid J to L line 4 TO 7
Top distribution shorter span 10 0.100 1 10 11.74 117.40 0.620 72.79
Top distribution longer span 10 0.100 1 31 3.68 114.08 0.620 70.73
Grid J to L line 11 TO 13
Top distribution shorter span 10 0.100 1 10 11.74 117.40 0.620 72.79
Top distribution longer span 10 0.100 1 31 3.68 114.08 0.620 70.73
Grid K to L line 7 TO 8 & 10 to 11
Main bar shorter span 10 0.100 2 17 5.62 191.08 0.620 118.47
Top distribution shorter span 10 0.100 2 10 5.62 112.40 0.620 69.69
Top distribution longer span 10 0.100 2 27 5.52 298.08 0.620 184.81
Grid line 8 TO 10
Main bar shorter span 10 0.100 2 45 4.50 405.00 0.620 251.10
Main bar shorter span 10 0.150 2 54 8.90 961.20 0.620 595.95
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
WI No 39149 KW-4 Yel.docx
Tender Document • 0.93 MB
Section-13 Water-Supply.doc
Others - Specifications • 5.43 MB
2 KBS-Section-16 Electrification-External.doc
Others - Specifications • 0.52 MB
Star rates.docx
Others - Star rates • 6.58 MB
GO Copy.pdf
Others - G O 1 • 1.15 MB
Formats.xlsx
Others - Formats • 0.05 MB
Electrical Layout bba.pdf
Others - Electrical layout • 0.40 MB
SBC report bba.pdf
Others - SBC Reports • 2.13 MB
Section-11-Sanitary.doc
Others - Specifications • 5.31 MB
Road concrete pavement specification.doc
Others - Specifications • 2.57 MB
Structural drawings bba.zip
Others - Drawings • 2.54 MB
1KBS-Section-16 Electrification-Internal.doc
Others - Specifications • 0.32 MB
Steel Measurement BBS.xlsx
Others - BBS • 0.06 MB
Architectural drawings1.zip
Others - Drawings • 19.83 MB
Building specifications.doc
Others - Specifications • 0.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .