Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.3 LAdmitted-Finance ALINGURE KUNDURMUNDA BOLBA SIMDEGA JHARKHAND 835223 | SIMDEGA | JHARKHAND | 835223 | -20.29% | ₹19.3 L | L1 | Admitted-Finance |
| 2 | L2₹19.9 LAdmitted-Finance | -18.10% | ₹19.9 L | L2 | Admitted-Finance |
| 3 | L3₹20.3 LAdmitted-Finance SIMDEGA | JHARKHAND | 835201 | -16.41% | ₹20.3 L | L3 | Admitted-Finance |
| 4 | L4₹21.1 LAdmitted-Finance BHELWADIH SIMDEGA | SIMDEGA | JHARKHAND | 835201 | -12.96% | ₹21.1 L | L4 | Admitted-Finance |
| 5 | L5₹21.4 LAdmitted-Finance SORA BANO SIMDEGA | SIMDEGA | JHARKHAND | 835201 | -11.91% | ₹21.4 L | L5 | Admitted-Finance |
Tender Value
₹24.2 L
EMD Value
₹48,500
Closing Date
25 Apr 2026, 5:00 pmClosed
EE NREP Simdega
Collectoriate Building Khuntitoli Simdega.
Construction of 1360 ft PCC Road at Village Kupudana Dongijhariya in Panchayat Banki Block Bano
2026_SIMDC_112701_1
01/2026-27/NREP/SIMDEGA
Open Tender
Civil Works
90 days
Bano
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹48,500
4 May 2026
16 Apr 2026
27 Apr 2026
16 Apr 2026
25 Apr 2026
16 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil tem-A) and disposal of excavated earth a obtained to a distance up to 50M including all lifts with leveling ramming the foundaton trenches removing roots of trees shrubs all complete as per approved design and per building specification and direction E/I.
S.O.R Item No. 5.1.1 | - | M3 | 151.82 | - | BI01010001010000000000000515BI0100001113 |
| 2Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, Labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume). S.O.R Item No. 5.1.10 | ||||||
| 3Providing designation 75A one brick flat soling joints filled with local sand including cost of watering, taxes, royalty all complete as per building specification and direction of E/I. S.O.R Item No. 5.6.1 | ||||||
| 4Providing P.C.C. M 200 with normal mix of (1:2:4)) in foundation and plinth with approved quality of stone chips 20mm to 6mm size graded and clean coarse sand of F.M. 2.5 to 3 including screening, shuttering, mixing cement concrete in cement mixer andplacing in position, vibrating, striking, curing, tax and royalty all complete job as per building specification and direction of Engineer in charge. S.O.R Item No. 5.3.2.1 | ||||||
| 5Filling in foundation treches and plinth in layers not exceeding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained agter cutting within a lead of 50 M and lift of 1.5 M all complete job as per building specification and direction of Engineer in charge. S.O.R Item No.5.1.8 | ||||||
| 6Foundation, footings, bases of coulumns, etc, for mass concrete- all complete job as per building specification and direction of Engineer in charge. S.O.R Item No. 5.3.17.1 | ||||||
| 7Carriage of Materials | ||||||
| 7.01 | Cement - | - | MT | - | - | BI01010001010000000000000515BI0100001120 |
| 7.02 | Sand - | - | M3 | - | - | BI01010001010000000000000515BI0100001121 |
| 7.03 | Chips - | - | M3 | - | - | BI01010001010000000000000515BI0100001122 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.44 MB
FoB.pdf
Additional Documents • 0.43 MB
BOQ_152189.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid