| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAdmitted-Finance | ₹8.3 L | L1 | Admitted-Finance |
| 2 | L2₹8.3 L+₹4,915 (0.60%)Admitted-Finance | ₹8.3 L+₹4,915 (0.60%) | L2 | Admitted-Finance |
| 3 | L3₹8.6 L+₹29,270 (3.54%)Admitted-Finance | ₹8.6 L+₹29,270 (3.54%) | L3 | Admitted-Finance |
| 4 | L4₹9.1 L+₹84,202 (10.2%)Admitted-Finance | ₹9.1 L+₹84,202 (10.2%) | L4 | Admitted-Finance |
| 5 | L5₹9.2 L+₹94,268 (11.4%)Admitted-Finance | ₹9.2 L+₹94,268 (11.4%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | IMPLA GENERAL SUPPLIERS L2 | RIM ELECTRICALS & SUPPLIERS L3 | M/S SHUJAT ELECTRICALS MECHINICALS AND SUPPLIERS L5 | MOHAMMAD SADIQ LONE L6 | M/S SYED YAQOOB CONSTRUCTIONS L7 | Heaven Electricals L4 | khanconstructions L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Work items identified; | ||||||||||
| 1.01 | Supply, installation, testing and commisioning of 63 kVA ,11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound , and with LV
Cable Box having detachable Aluminium Gland plate 11/0.433KV, 3-phase(EE Level-II) complete in all respect as per Standards. | 2 | No. | 1,30,000 ₹2,60,000 | 1,38,000 ₹2,76,000 | 1,45,000 ₹2,90,000 | 1,60,000 ₹3,20,000 | 1,39,000 ₹2,78,000 | 1,34,000 ₹2,68,000 | 1,22,000 ₹2,44,000 Lowest |
| 2.01 | Supply, installation, testing and commisioning of 9 mtr (410 SP-33) long Steel Tubular Poles complete with base plate(350x350x5mm) with 50mm dia hole, top cap, Earthing Channel(75x40x6mm) including digging of pit positioning etc, complete in all respect as per Standards. | 15 | Nos. | 14,000 ₹2,10,000 Lowest | 16,200 ₹2,43,000 | 17,500 ₹2,62,500 | 17,500 ₹2,62,500 | 17,200 ₹2,58,000 | 17,400 ₹2,61,000 | 14,300 ₹2,14,500 |
| 3.01 | Supply, installation, testing and commisioning of 8 mtr(410 SP-15) long Steel Tubular Poles complete with base plate(350x350x5mm) with 50mm dia hole, top cap, Earthing Channel(75x40x6mm) positioning etc, complete in all respect as per Standards. | 2 | Nos. | 11,000 ₹22,000 Lowest | 12,200 ₹24,400 | 13,500 ₹27,000 | 14,200 ₹28,400 | 13,000 ₹26,000 | 12,000 ₹24,000 | 11,000 ₹22,000 Lowest |
| 4.01 | Supply, laying, stringing, tensioning, binding of 50 Sqmm ACSR Conductor complete in all respects as per standards. | 0.2 | Km. | 40,000 ₹8,000 | 40,000 ₹8,000 | 5,000 ₹1,000 Lowest | 40,000 ₹8,000 | 57,000 ₹11,400 | 40,000 ₹8,000 | 38,000 ₹7,600 |
| 5.01 | Supply, laying, stringing, tensioning, binding of 30 Sqmm ACSR Conductor complete in all respects as per standards. | 1.8 | Km. | 27,000 ₹48,600 | 28,000 ₹50,400 | 29,000 ₹52,200 | 25,000 ₹45,000 Lowest | 37,000 ₹66,600 | 27,000 ₹48,600 | 28,000 ₹50,400 |
| 6.01 | Supply,Carraige upto site and fixing of GI V cross-arm with top Bracket including clamp duly fabricated as per site requirement including clamps(50x8 mm), GI Nuts & Bolts,washers etc complete in all respects as per standards. | 315 | Kg | 110 ₹34,650 Lowest | 115 ₹36,225 | 117 ₹36,855 | 125 ₹39,375 | 135 ₹42,525 | 125 ₹39,375 | 125 ₹39,375 |
| 7.01 | Supply,Carraige upto site, fixing and installation of GI Channels of different sizes including clamps and braces. | 600 | Kg | 110 ₹66,000 Lowest | 115 ₹69,000 | 115 ₹69,000 | 125 ₹75,000 | 135 ₹81,000 | 125 ₹75,000 | 115 ₹69,000 |
| 8.01 | Supply,Carraige upto site,Installation,testing and Commissioning of 11kV Polymeric composite Pin Insulators 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance
320mm complete in all respects as per standards. | 45 | No. | 170 ₹7,650 Lowest | 190 ₹8,550 | 180 ₹8,100 | 250 ₹11,250 | 250 ₹11,250 | 220 ₹9,900 | 220 ₹9,900 |
| 9.01 | Supply,Carraige upto site,Installation,testing and Commissioning of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative,
creepage distance 320mm complete in all respects as per standards. | 2 | Set | 500 ₹1,000 | 200 ₹400 Lowest | 500 ₹1,000 | 2,000 ₹4,000 | 1,350 ₹2,700 | 1,700 ₹3,400 | 1,000 ₹2,000 |
Tender Value
₹12.6 L
EMD Value
₹25,100
Closing Date
1 Sept 2025, 4:00 pmClosed
Executive Engineer, ED Budgam, KPDCL
Executive Engineer, ED Budgam, KPDCL
installation of 63 KVA Transformer along with HT/LT improvement.
2025_PDD_285314_1
EDB/41 of 2025-26
Open Tender
Electrical and Maintenance Works
Turn-key
60 days
ED Budgam, KPDCL
As per SBD
7 documents required · 7 mandatory
₹1,000
Executive Engineer, ED Budgam, KPDCL
₹25,100
15 Sept 2025
23 Aug 2025
2 Sept 2025
23 Aug 2025
1 Sept 2025
26 Aug 2025
25 Aug 2025 - 26 Aug 2025
Amount
Work items identified;
Supply, installation, testing and commisioning of 63 kVA ,11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound , and with LV Cable Box having detachable Aluminium Gland plate 11/0.433KV, 3-phase(EE Level-II) complete in all respect as per Standards.
Supply, installation, testing and commisioning of 9 mtr (410 SP-33) long Steel Tubular Poles complete with base plate(350x350x5mm) with 50mm dia hole, top cap, Earthing Channel(75x40x6mm) including digging of pit positioning etc, complete in all respect as per Standards.
Supply, installation, testing and commisioning of 8 mtr(410 SP-15) long Steel Tubular Poles complete with base plate(350x350x5mm) with 50mm dia hole, top cap, Earthing Channel(75x40x6mm) positioning etc, complete in all respect as per Standards.
Supply, laying, stringing, tensioning, binding of 50 Sqmm ACSR Conductor complete in all respects as per standards.
Supply, laying, stringing, tensioning, binding of 30 Sqmm ACSR Conductor complete in all respects as per standards.
Supply,Carraige upto site and fixing of GI V cross-arm with top Bracket including clamp duly fabricated as per site requirement including clamps(50x8 mm), GI Nuts & Bolts,washers etc complete in all respects as per standards.
Supply,Carraige upto site, fixing and installation of GI Channels of different sizes including clamps and braces.
Supply,Carraige upto site,Installation,testing and Commissioning of 11kV Polymeric composite Pin Insulators 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm complete in all respects as per standards.
Supply,Carraige upto site,Installation,testing and Commissioning of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm complete in all respects as per standards.
Supply, Carraige upto site, installation, testing and Commissioning of Gapless Surge Arrestor 9 kV, 10 kA, LA with polymer housing, Stn. Type complete in all respects as per standards.
Supply, Carraige upto site, installation, testing and Commissioning of 11 kV G.O AB Switch 3-phase, 3 pole 200-Amp, vertical Type with fittings complete in all respects as per standards.
Supply, Carraige upto site, installation, testing and Commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A complete in all respects as per standards.
Supply, Carraige upto site, laying, stringing, tensioning, binding of 185mm² (1Ckt )1.1kV Grade, XLPE Insulated Stranded Conductor FRLS type cable complete in all respects as per standards.
Supply,Carraige upto site, fixing of Aluminium Thimbles of size 120 Sqmm.
Supply,Carraige upto site, fixing and Commissioning of Aluminium Solderless Clamps of size 120 Sqmm.
Supply, Carraige upto site, installation, testing and Commissioning of LT Distribution Box for 63 kVA DTR with 100 Amp adjustable MCCB 3P 16 kA for incomer & 100 Amp MCCB 3P 16 kA 1 No. and 63 Amp MCCB 3P 16 kA 1 No.s for Outgoing Circuits.complete in all respects as per standards.
Earthing of substation-Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239. GI Strip for neutral earthing of size 25 mmx3 mm, for connection of transformer body,G.O set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover complete in all respects as per standards.
Supply,Carraige upto site, fixing of G I Muky Clamps. As per standards
Supply,Carraige upto site, fixing of 45 KN Shackale insulators as per standards.
Cement bottoming 1:2:4 mix as per Standards 0.5cum/0.45 cum pole comlete in all respects.
Earthing of steel tubular poles complete by GI pipe 40mm or GI rod 20mm 3.0 mtr long through GI strip 25x3 as per standards.
Painting of Poles with one coat of Red Oxide and two coats of alimunium paint to give uniform shine.
Supply and fixing of GI barbed wire Anti climbind Device with clamps complete in all respects as per Standards
Supply and fixing of danger plates with clamps complete in all respects as per Standards
Paint mark of scheme
NOTE: 1.The rates quoted by the bidder for all the items shall be inclusive of GST/freight/insurance/storage/installation/testing and any other charges FOR (1)Installation of 63-Kilowatt Transformer with Low tension poles near House of Habibullah Ganaie at Gampora (2)Installation of Transformer along with Poles near the house of Mohd Hussain Ganie, Master Ghulam Mustafa Mir and others at Mulshulla
IMPLA GENERAL SUPPLIERS (BID ID -2465687)
RIM ELECTRICALS & SUPPLIERS (BID ID -2465068)
Heaven Electricals (BID ID -2464913)
M/S SHUJAT ELECTRICALS MECHINICALS AND SUPPLIERS (BID ID -2466752)
MOHAMMAD SADIQ LONE (BID ID -2465577)
M/S SYED YAQOOB CONSTRUCTIONS (BID ID -2466591)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .