| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAdmitted-Finance | ₹2.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.5 Cr+₹11.4 L (4.88%)Admitted-Finance 18 CORPORATION ROAD DEVAKOTTAI | SIVAGANGA | TAMIL NADU | 630001 | ₹2.5 Cr+₹11.4 L (4.88%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Vetri constructions L1 | V MEENAL AND CO L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all kinds of soils and sub soils to full depth as directed by the departmental officers except hard rock requiring blasting inclusive of shoring strutting and balling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth with in the compound in places shown by the departmental officers with initial lead of 10 meters and initial lift of 2 meters including clearing leveling the site etc., complete complying with standard specification (TNDSS No. 23, 24) | 195 | M3 | 75 ₹14,625 Lowest | 78 ₹15,210 |
| 2.00 | Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam (WMM ) soecification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 127 | M3 | 2,080 ₹2,64,160 Lowest | 2,182 ₹2,77,114 |
| 3.00 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev V Specifications | 1,270 | M2 | 77 ₹97,790 Lowest | 80 ₹1,01,600 |
| 4.00 | Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM/ surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | 1,270 | M2 | 18 ₹22,860 Lowest | 19 ₹24,130 |
| 5.00 | Providing and laying tack coat of 2.0 kgs/10 sqm over the B.T surface treated with binder using 2.0 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | 70,011 | M2 | 24 ₹16,80,264 Lowest | 25 ₹17,50,275 |
| 6.00 | Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix | 65 | M3 | 3,919 ₹2,54,735 Lowest | 4,112 ₹2,67,280 |
| 6.01carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications | |||||
| 7.00 | Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 45.27kgs of VG30 / VG40 bitumen and 5.03Kg of plastic waste (50.30*10%=5.03Kg) for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform | 2,139 | M3 | 9,693 ₹2,07,33,327 Lowest | 10,172 ₹2,17,57,908 |
| 7.01thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5. | |||||
| 8.00 | Conveyance of excess excavated and surpluse earth to low laying areas upto 3 km lead including loading , unloading charges and cost of transportion charges, including cost of all labours charges etc complete | 195 | M3 | 79 ₹15,405 Lowest | 83 ₹16,185 |
Tender Value
₹2.9 Cr
EMD Value
₹2.9 L
Closing Date
30 Jun 2023, 3:00 pmClosed
THE COMMISSIONER, ERODE CITY MUNICIPAL CORPORATION
246,MEENAKHISUNDARANAR SALAI,ERODE-638001
RESTORATION OF B.T SURFACE DAMAGED DUE TO UGSS SCHEMES AND WATER SUPPLY SCHEMES AT SELVAM NAGAR E TO W 1ST CROSS ROAD 056020R1816 , SELVAM NAGAR E TO W 2ND CROSS ROAD 056020R1817 , SELVAM NAGAR N TO S 1ST CROSS 056020R1818 , SELVAM NAGAR N TO
2023_MAWS_331686_1
E1-0846-2023-3-ERODE CITY MUNICIPAL CORPORATION
Open Tender
Civil Works - Roads
Works
180 days
ERODE CITY MUNICIPAL CORPORATION
Please refer Tender documents.
17 documents required · 17 mandatory
₹0
₹2.9 L
ERODE CITY MUNICIPAL CORPORATION
5 Jul 2023
24 Jun 2023
30 Jun 2023
24 Jun 2023
30 Jun 2023
24 Jun 2023
26 Jun 2023
Amount
Earth work excavation for foundation in all kinds of soils and sub soils to full depth as directed by the departmental officers except hard rock requiring blasting inclusive of shoring strutting and balling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth with in the compound in places shown by the departmental officers with initial lead of 10 meters and initial lift of 2 meters including clearing leveling the site etc., complete complying with standard specification (TNDSS No. 23, 24)
Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam (WMM ) soecification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev V Specifications
Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM/ surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications
Providing and laying tack coat of 2.0 kgs/10 sqm over the B.T surface treated with binder using 2.0 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications
Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix
carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 45.27kgs of VG30 / VG40 bitumen and 5.03Kg of plastic waste (50.30*10%=5.03Kg) for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform
thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5.
Conveyance of excess excavated and surpluse earth to low laying areas upto 3 km lead including loading , unloading charges and cost of transportion charges, including cost of all labours charges etc complete
Providing laying and jonting of UGSS house service connection ( HSC ) pipe line up to side drian using 110mmOD PVC pipe 6kg/cm2 with same diameter PVC dummy including cost of all materials to site, laying and Jointing of pvc pipe to proper gradient and alignmentetc including cost of necessary dismantling to existing UGSS manhole side wall and redo the nessary manhole wall makeing good etc complete
V MEENAL AND CO
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_393551.xls
BOQ • 0.29 MB
CONDITIONS_3.pdf
Additional Documents • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .