Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-AOC | ₹6.6 L | L1 | Accepted-AOC work order issued |
| 2 | L2₹6.6 LRejected-Finance CHENDARAPATTY | ₹6.6 L | L2 | Rejected-Finance High rate |
Tender Value
Refer Docs
EMD Value
₹16,000
Closing Date
11 Mar 2025, 3:00 pmClosed
Executive Officer
Thedavoor Town Panchayat Office
Extension of Pipeline from Ward No 14 PUE School to Navalmaram in Thedavoor Town Panchayat
2025_DTP_530260_1
70/2025-1/A
Open Tender
Civil Works - Water Works
120 days
Thedavoor Town Panchayat Office
Refer to Tender notice
3 documents required · 3 mandatory
₹0
₹16,000
Thedavoor Town Panchayat Office
31 May 2025
6 Mar 2025
11 Mar 2025
6 Mar 2025
11 Mar 2025
6 Mar 2025
6 Mar 2025 - 11 Mar 2025
10 Mar 2025
Amount
Earth work excavation and depositng on bank within an initial lead of 10 m and initial lift of 2 m in Hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders for laying pipeline in respect of following size of pipe with standard trench width and required depth including shoring, struting, baling out water wherever necessary and all other incidental works such as barricading, providing danger lights, labour for watch and ward,as per standard specifications and as directed by the Department officers
Supply and delivery of HDPE Pipes PE 100 PN 8 of standard length conforming to IS 4984/1995 and as amended from time to time The cost of pipes should include loading, freight, transit insurance, incidental charges, packing, taxes and transportation charges to stack yard in good condition excluding excise duty (the cost excluding unloading from lorries at stack yard and stacking which will be paid seperately) etc., complete as directed by the Departmental officers.
90 mm HDPE 6ksc (WD-M0187)
Lowering HDPE pipes and specials to trench and laying to proper grade and alignment as per standard specifications and as directed by the Department Officers
Jointing HDPE Pipes and Specials by butt fusion welding/ electro fusion welding joints using fusion equipments as per ISO 21307-2011 and as per IS 7634(Part-2):2012 including cost of hire charges for butt fusion equipment.power supply arrangements etc., complete as per directed by Department officers
Refilling with excavated soil ( other than sand) complying with the standard specification for filling in foundation and basement
SRI SAKTHI CONSTRUCTIONS (BID ID -1266557)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid