Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Finance | ₹2.4 L | L1 | Admitted-Finance |
| 2 | L2₹2.5 LAdmitted-Finance | ₹2.5 L | L2 | Admitted-Finance |
| 3 | L3₹2.7 LAdmitted-Finance | ₹2.7 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AARADHYA CONSTRUCTION L1 | N.K. BUILDCOM L2 | MANJU NARANG L3 |
|---|---|---|---|---|---|---|
| 1.00 | Flushing / Cleaning of UGR at Jal Vihar (New) BPS under Jangpura Constituency AC-41.
Cleaning of under ground sump, Over Head R.C.C. Tank (independent staging) including disposal of slit and rubbish, all as per direction of Engineer-in-Charge. The cleaning shall consist following operations:-
(i)Tank shall be emptied of water by pumping & bottom shall be cleaned of silt and other deposits.
(ii) Entire surface area of the sump shall then scrubbed thoroughly with wire brush etc. and pressure washed with water.
(iii) Chlorination of RCC internal surface by liquid chlorine.
(iv) The treated surface shall be dried using air jetting and all loose particles shall be removal from the surface.
(v) Finally the surface shall be treated with ultraviolet radiation etc. as per direction of Engineer-in-Charge. | 4,715 | Sq. Mtr. | 2,05,856.9 ₹2,42,911.14 | 2,12,175 ₹2,50,366.5 | 2,26,320 ₹2,67,057.6 |
Tender Value
Refer Docs
EMD Value
₹8,100
Closing Date
5 Jan 2026, 3:00 pmClosed
EXECUTIVE ENGINEER (EM) M-11
GREATER KAILASH, PART-I, NEW DELHI
Flushing / cleaning of UGR at Jal Vihar (New) BPS under Jangpura Constituency AC-41.
2025_DJB_283549_19
NIT No. 21/EE(EM)M-11/(25-26)
Open Tender
Electrical Work/ Equipment
30 days
EXECUTIVE ENGINEER (E/M) M-11
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Delhi Jal Board
₹8,100
Yes
26 Feb 2026
24 Dec 2025
5 Jan 2026
24 Dec 2025
5 Jan 2026
24 Dec 2025
Flushing / Cleaning of UGR at Jal Vihar (New) BPS under Jangpura Constituency AC-41. Cleaning of under ground sump, Over Head R.C.C. Tank (independent staging) including disposal of slit and rubbish, all as per direction of Engineer-in-Charge. The cleaning shall consist following operations:- (i)Tank shall be emptied of water by pumping & bottom shall be cleaned of silt and other deposits. (ii) Entire surface area of the sump shall then scrubbed thoroughly with wire brush etc. and pressure washed with water. (iii) Chlorination of RCC internal surface by liquid chlorine. (iv) The treated surface shall be dried using air jetting and all loose particles shall be removal from the surface. (v) Finally the surface shall be treated with ultraviolet radiation etc. as per direction of Engineer-in-Charge.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_374910.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid