| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.2 LAccepted-AOC | ₹35.2 L | L1 | Accepted-AOC LER |
| 2 | L2₹35.3 LRejected-Finance | ₹35.3 L | L2 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | Arivazhagan R L2 | OVIYA CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.10Part I :Rejuvenation of Vella Kulam with Construction of Bhating Ghat ,Baby Pond Lining wall, Inlet and Outlet @ Karunthuvampadi Panchayat | |||||
| 1.20Desilting of Vella Kulam in Karunthuvampadi Panchayat. | |||||
| 1.30 | Clearing light jungles including cost and conveyance of all materials and all labour charges etc., complete | 407.16 | Sqm | 15 ₹6,107.40 | 5.5 ₹2,239.38 |
| 1.40 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan | 584.64 | Cu.m | 43.3 ₹25,314.91 | 43.3 ₹25,314.91 |
| 1.50 | Earth work excavation in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinaries and tippers including benching , breaking clods, sectioning etc. | 499.2 | Cu.m | 51.45 ₹25,683.84 | 51.45 ₹25,683.84 |
| 1.60Construction of Baby Pond Lining wall to Vella Kulam in Karunthuvampadi Panchayat. | |||||
| 1.70 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 10.74 | Cu.m | 400 ₹4,296 | 212 ₹2,276.88 |
| 1.80 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 2.69 | Cu.m | 1,590 ₹4,277.10 | 1,590 ₹4,277.10 |
| 1.90 | Cement concrete 1 :4 : 8mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 2.69 | Cu.m | 4,807 ₹12,930.83 | 4,807 ₹12,930.83 |
| 2.00 | Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 22.18 | Cu.m | 5,134.5 ₹1.1 L | 5,134.5 ₹1.1 L |
Tender Value
₹35.6 L
EMD Value
₹37,500
Closing Date
17 Nov 2022, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER V P THURINJAPURAM
BLOCK DEVELOPMENT OFFICER V P BLOCK DEVELOPMENT OFFICE THURINJAPURAM 606805
Providing Infrastructure Development works to AGAMT 2022-23 Village Panchayat at Karunthuvambadi Panchayat of Thurinjapuram Block in Package No. TPRM/2022-23/5 Tiruvannamalai District
2022_RDTN_263371_1
Roc. No. A13-3/2156/2022 Dt.06.10.2022 005
Open Tender
Civil Works - Others
90 days
BLOCK DEVELOPMENT OFFICE, THURINJAPURAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹37,500
30 Mar 2026
12 Nov 2022
17 Nov 2022
12 Nov 2022
17 Nov 2022
12 Nov 2022
Amount
Part I :Rejuvenation of Vella Kulam with Construction of Bhating Ghat ,Baby Pond Lining wall, Inlet and Outlet @ Karunthuvampadi Panchayat
Desilting of Vella Kulam in Karunthuvampadi Panchayat.
Clearing light jungles including cost and conveyance of all materials and all labour charges etc., complete
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
Earth work excavation in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinaries and tippers including benching , breaking clods, sectioning etc.
Construction of Baby Pond Lining wall to Vella Kulam in Karunthuvampadi Panchayat.
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 :4 : 8mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and erection of centering for retaining wall and bathing ghat including cost and conveyance of all material and all labour charges etc, complete
Providing and laying reinforced cement concrete pipe NP2 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry
Refilling Earth filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Construction of Baby Pond Lining wall to Vella Kulam in Karunthuvampadi Panchayat.
Earth work excavation and depositing onsides with initial lead of 10 meter and initial lift of 2 meters in sand,silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth SS 20 B
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance to all material to site and all labour charges etc., complete
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour chages etc.,
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Construction of Retaining Wall
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Construction of Bhathing Ghat
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Provision for Name Board
Part II :Rejuvenation of Pullaa Kulam with Construction of Bhating Ghat ,Baby Pond Lining wall, Inlet and Outlet @ Karunthuvampadi Panchayat
Desilting of Pulla Kulam in Karunthuvampadi Panchayat.
Clearing light jungles including cost and conveyance of all materials and all labour charges etc., complete
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
Earth work excavation in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinaries and tippers including benching , breaking clods, sectioning etc.
Construction of Bhating Ghat to Pulla Kulam in Karunthuvampadi Panchayat.
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 :4 : 8mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and erection of centering for retaining wall and bathing ghat including cost and conveyance of all material and all labour charges etc, complete
Construction of Baby Pond to Vella Kulam in Karunthuvampadi Panchayat.
Earth work excavation and depositing onsides with initial lead of 10 meter and initial lift of 2 meters in sand,silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth SS 20 B
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance to all material to site and all labour charges etc., complete
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour chages etc.,
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Lining Wall
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Providing and laying reinforced cement concrete pipe NP2 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry
Refilling Earth filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Construction of Retaining Ghat
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Provision for Name Board
Part III: Providing CC Pavement in Yadava street @ Karunthuvampadi Panchayat (90m)
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement concrete 1:4:8 using 40 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete complying with standard specification
Plain Cement concrete 1:2:4 using 20 mm ISS size HBG metal including labour charges etc,complete
Provision for Bitumen Pad (12mm thick) including cost & conveyance etc,.
Provision for Name Board
Part IV : Construction of Threshing Floor in Near Sorakolathur RF @ Karunthuvampadi Panchayat [14.80x15.50m]
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete.
Cement Concrete 1:3:6 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges, etc.
Supplying and erecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plance surfaces in all floors with all cross bracings using mild steel of size 90cm. X 60 cm. and 10 gauge stiffened, welded with mild steel angles of size 25mm x 25mm x 3mm for boarding laid over silver oak (country wood) joist of size 10cm. x 6.5 cm. dia spaced about 90 cm. center to center and supported by casuarinas props of 10 cm. to 13 cm. dia spaced at 75 cm. center to center etc., complete coplying with standard specification ans as directed for the following items.
Cement Concrete 1:2:4 mix using 20 mm ISS HBG metal including cost and conveyace of all materials and all labour charges, etc.
Providing name board including lettering
Bitmen Pad
Part V : Construction of Threshing Floor in Near VPSC Building @ Karunthuvampadi Panchayat [14.80x15.50m]
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete.
Cement Concrete 1:3:6 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges, etc.
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all material to site including all labour
Supplying and erecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plance surfaces in all floors with all cross bracings using mild steel of size 90cm. X 60 cm. and 10 gauge stiffened, welded with mild steel angles of size 25mm x 25mm x 3mm for boarding laid over silver oak (country wood) joist of size 10cm. x 6.5 cm. dia spaced about 90 cm. center to center and supported by casuarinas props of 10 cm. to 13 cm. dia spaced at 75 cm. center to center etc., complete coplying with standard specification ans as directed for the following items.
Cement Concrete 1:2:4 mix using 20 mm ISS HBG metal including cost and conveyace of all materials and all labour charges, etc.
Providing name board including lettering
Bitmen Pad
Part VI : Providing Fencing and green net work for moringa nursery @ Karunthuvampadi panchayat.
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting etc complete.,
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cpost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete.,
Supply of Precast RCC Column Post for chain link fencing purpose of size 2.00 x 0.15 x 0.15 including all cost and conveyance of materials to work site and all charges etc complete.
Cement concrete 1:2:4 mix usin 20 mm HBGS metal inculding cpost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,
Fabrication and supply of mild steel Door with single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and paritally covered with 18 G plate and partially covered with 12 mm square rod grill work etc complete.(1.00 m width x 1.50 m Height)
Labour charges for fixing doors alongwith frames in position etc., complete
Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Supplying and Fixing Chain Link Fencing of 5cm x 5 cm x 10 gauge including cost and conveyance of all materials to work site and all kind labour charges and all charges for tools, machineries and equipments etc complete.
Supplying and Fixing Barbed Wire Fencing 12G, 2 PLY including cost and conveyance of all materials to work site and all kind labour charges and all charges for tools, machineries and equipments etc complete.
Labour Charges for fixing of RCC Precost Post in foundation with necessary supports and position in longitudinal alignment, including all tools and machineries, safety arrangements and other incidental charges etc complete.
Painting Two coats of Only Priming Coat with white cement including cost and conveyance of all materials to site and all labour charges etc complete (Precast RCC Post)
Provision for Lock and Key
Provision for Information Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Arivazhagan R
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_311747.xls
BOQ • 0.33 MB
Tendernotice.pdf
Tender Documents • 0.85 MB
Download all tender documents and submit your bid