Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H5₹20 L−₹4.9 L (19.7%)Accepted-AOC | H5 | Accepted-AOC lowest bid | |
| 2 | H1₹24.9 LRejected-Finance | H1 | Rejected-Finance Highest bid | |
| 3 | H2₹24.7 L−₹20,000 (0.80%)Rejected-Finance VILLAGE GOLHUIEN PO KILOD TEHSIL DISTT CHAMBA HP | CHAMBA | CHAMBA | HIMACHAL PRADESH | H2 | Rejected-Finance Highest bid | |
| 4 | H3₹24.1 L−₹75,000 (3.01%)Rejected-Finance | H3 | Rejected-Finance Highest bid | |
| 5 | H4₹22.9 L−₹2.0 L (8.11%)Rejected-Finance GOVT CONTRACTOR DISTT CHAMBA HP 176303 | CHAMBA | HIMACHAL PRADESH | 176303 | H4 | Rejected-Finance Highest bid |
Tender Value
₹23.1 L
EMD Value
₹46,200
Closing Date
8 Jul 2025, 11:00 amClosed
Executive Engineer
EE Jal shakti Shimla Rural Division at Sunni
Deploying manpower for distribution of water by operating pumping Machinary and wheel valves and minor repairs etc. for 12 months
2025_HPIPH_108861_1
SNN-SML-003-740-Tdr-25-69-77 dt 26.6
Open Tender
Civil Works - Water Works
Item Rate
365 days
EE Sunni
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
₹46,200
24 Jul 2025
28 Jun 2025
8 Jul 2025
28 Jun 2025
8 Jul 2025
28 Jun 2025
28 Jun 2025 - 8 Jul 2025
Amount
Laying and Jointing PVC Pipe. Heading
Operation and maintenance of pumping machinery, valves, storage tanks and distribution system for one year including major repair i.e repair of pumps, motors and Panel boards etc. and minor repairs i.e welding of rising mains, repair of distribution pipelines, providing of various dia fittings, lubrication/greacing of pumps and motors, maintenace and cleanliness of storage tanks etc. The time scheduled shall be as directed by Engineer-in-charge complete in all respect. The technical details of the scheme is as below:-
Name of Scheme:- LWSS Pandoa Khad to Kail Bagri
No. of stages:- 4 Stages
Location of pump houses:-
1st stage :- Pandoa
2nd stage (Phase-I):- Kail Nallah
2nd stage (Phase-II):- Kail Nallah
3rd stage (Phase-I):- Banuna
3rd stage (Phase-II):- Dhanpad (Roptu)
Pump make:- KSB make
Moor make:- Kirloskar
Pump H.P
1st stage :- 3x125 HP
2nd stage (Phase-I):- 2x250 HP
2nd stage (Phase-II):- 2x50 HP
3rd stage (Phase-I):- 2x100 HP
3rd stage (Phase-II):- 2x100 HP
(One Set will be Standby)
Pumping Hours:-
1st and 2nd stage :- 12 hours
3rd stage Phase-I:- 8 hours
3rd stage Phase-II:- 8 hours
Dia of Rising main:-
1st stage :- 150 mm
2nd stage (Phase-I):- 150 mm
2nd stage (Phase-II):- 80 mm
3rd stage (Phase-I):- 125 mm
3rd stage (Phase-II):- 80 mm
Length of Rising main:- 17 Km
Distribution length:- 119 Km
Kamlesh Kumar (BID ID -532680)
gulshan kumar (BID ID -532016)
NARENDER KUMAR (BID ID -532519)
Satya Prakash (BID ID -532737)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .