Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.8 L
EMD Value
₹9,609
Closing Date
24 Jun 2026, 6:00 pmClosed
EE WRD I BHILWARA
EE WRD I BHILWARA
Repair Work of Waste Weir of Beadesera Talab and Shahpura Secation for Rainy Season for Year 2026-27
2026_WRDAS_569623_11
NIT-02/26-27/887/BHL/WRD-I
Open Tender
Civil Works
Percentage
120 days
BHILWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
AS NIT CONDITIONS
₹9,609
Yes
25 Jun 2026
19 Jun 2026
25 Jun 2026
19 Jun 2026
24 Jun 2026
19 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Julicflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting.Thick | 11,050 | P.sqm | 2.5 | ₹27,625 |
| 2 | Demolishing stone rubble masonry including stacking of useable material and disposal of unuseable material within 50 meters lead inclusive of de-watering wherever required in cement mortar | 1.5 | cum | 489 | ₹733.5 |
| 3 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect Hard soil/dense soil | 85.83 | Cum | 79 | ₹6,780.57 |
| 4 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect Hard soil mixed with kankar | 57.22 | Cum | 99 | ₹5,664.78 |
| 5 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20mm | 7.5 | Cum | 4,818 | ₹36,135 |
| 6 | Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete. In cement sand mortar 1:6 | 43.75 | Cum | 4,375 | ₹1,91,406.25 |
| 7 | Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for super structure including curing all leads of all construction materials including curing etc. complete. in cement sand mortar (1:6). | 35 | Cum | 4,565 | ₹1,59,775 |
| 8 | Providing and laying cement concrete coping in (1:2:4) with maximum size of crusher broken aggregate upto 20 mm including shuttering etc. with all leads of material complete in all respect in thickness of:75 mm | 15 | Sqm | 480 | ₹7,200 |
| 9 | Plaster in cement sand mortar (1:3) including racking of joints, smooth finishing and curing etc. complete including all leads of all construction materials, of thickness:20 mm mortar mixing done by mixer machine. | 75 | Sqm | 299 | ₹22,425 |
| 10 | Providing, Fabrication, machining with straightening work of Guide Tee, Track, Sealing frame, Leaf frame or any part of gate's, complete as per drawing with testing, including cost of all materials, with machinery, labour, tools and tackles cutting, aligning, welding, finishing, cleaning etc., applying one coat of zinc rich epoxy primer and two coats of cold applied coal tar epoxy paint, etc., complete as per specifications and approved drawings with all lead and lifts, including packing & forwarding, transportation charges for structural steel components and other materials. with materials | 200 | Kg | 113.56 | ₹22,712 |
stage.html
html • 0.02 MB
finance_1013659.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.92 MB
BOQ_1013659.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .