| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹2.1 L+₹21,755 (11.7%)Accepted-AOC | L2 | Accepted-AOC The rates quoted by L1 Contractor is below 30 percent from the amount put to tender hence the work has been awarded to the L2 Contractor | |
| 2 | L1₹1.9 LRejected-Finance | L1 | Rejected-Finance The rates quoted by L1 Contractor is below 30 percent from the amount put to tender hence the work has been awarded to the L2 Contractor | |
| 3 | L3₹2.3 L+₹43,625 (23.5%)Rejected-Finance | L3 | Rejected-Finance Rejected | |
| 4 | Rejected-Technical HIMACHAL PRADESH HP | - | Rejected-Technical Rejected | |
| 5 | Rejected-Technical HARI NIWAS DHANDA P O TOTU TEHSIL DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | - | Rejected-Technical Rejected |
Tender Value
₹2.9 L
EMD Value
₹5,800
Closing Date
10 Mar 2022, 5:00 pmClosed
Executive Engineer R B M C Shimla
Executive Engineer R B M C Shimla
Construction of Retaining wall near Anil Victor Dream House Hari Nagar in ward No 10 TutiKandi
2022_MC_57361_1
430Dated21022022
Open Tender
Civil Works
Item Rate
60 days
Shimla
Please refer Tender Documents
7 documents required · 7 mandatory
₹350
Executive Engineer R B M C Shimla
₹5,800
1 Jun 2022
2 Mar 2022
11 Mar 2022
2 Mar 2022
10 Mar 2022
2 Mar 2022
Amount
Earth work in surface excavation not exceeding 30 cm in (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.Ordinary rock
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form work for :Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Stone filling behind retaining walls :
Providing and Laying PVC Pipe weep hole 100mm dia
ABDUL RAZAK BUTT
BILAL AHMED BUTT
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .