Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.4 L+₹8,697.60 (6.66%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹1.5 L
EMD Value
₹2,960
Closing Date
8 Jul 2026, 6:00 pmClosed
XEN OFFICE REW JAMMU
XEN OFFICE REW JAMMU
Constt of Water Storage Tank at Batlalehar Ward 8 Pyt Sagoon Block Nagrota AC Nagrota,4th Call
2026_RDPR_314246_1
eNIT No.85-REWJ of 2026-27 Dated 02-07-2026
Open Tender
Civil Works
Percentage
XEN OFFICE REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹2,960
Yes
13 Jul 2026
2 Jul 2026
9 Jul 2026
2 Jul 2026
8 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 5.18 | cum | 479.3 | ₹2,482.77 |
| 2 | P/Laying of cement conct. 1:5:10( 1 cement :5coarse sand :10 graded stone aggregates 40mm) Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | 1.16 | cum | 4,826.5 | ₹5,598.74 |
| 3 | P/Laying of cement conct. 1:3:6( 1 cement :3 coarse sand :6 graded stone aggregates 20mm) Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | 4.13 | cum | 5,733.6 | ₹23,679.77 |
| 4 | supply and dumping of stone | 1.77 | cum | 700 | ₹1,239 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size | 2.21 | cum | 9,821.85 | ₹21,706.29 |
| 6 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete . | 176.94 | kg | 123.1 | ₹21,781.31 |
| 7 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 4.69 | cum | 7,571.22 | ₹35,509.02 |
| 8 | Centring and shuttring and propping etc. | 21.65 | sqm | 286.35 | ₹6,199.48 |
| 9 | Centring and shuttring and propping atc. | 6.7 | sqm | 718.2 | ₹4,811.94 |
| 10 | CEMENT PLASTER (IN FINE SAND) 12mm Cement plaster of mix 1:4 | 36.98 | sqm | 283.8 | ₹10,494.92 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.63 MB
BOQ_1017552.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .