Loading…
Loading…
Tender Value
₹60 L
EMD Value
₹1.2 L
Closing Date
16 Jul 2026, 2:00 pm
Ex. Engineer SND Div IIND
Darish Kadal
Maintenance of Drainage network within the jurisdiction of Dood Ganga Sub Division Zone III for the year 2026-27
2026_HAUDD_314752_3
FRESH E-NIT NO 10 SNDII OF 2026-27
Open Tender
Civil Works
365 days
within the jurisdiction of Dood Ganga Sub Division
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,000
Ex Engineer SND Division IIND
₹1.2 L
6 Jul 2026
6 Jul 2026
17 Jul 2026
6 Jul 2026
16 Jul 2026
6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Desilting / Clearance of open, covered drain/ sewere manholes, Silt Chambers, Sump Wells , etc. by way of removal of silt, garbage, sewage, mud, slush, organic / inorganic matters and other solids, cleaning of sewer pipes by rodding or by any means from manholes and well flushing after cleaning including all leads lifts including disposal of removed / unwanted material beyond Municipal Limits. Shrinkage will be deducted @25% as water content. | 1 | Cum | 900 | ₹900 |
| 2 | Dismantling manually/ mechanically including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: 1)- Water bound macadam road. | 1 | Sqm | 156.3 | ₹156.3 |
| 2.01 | Dismantling including stacking of serviceable material & disposal of un-serviceable material within 50M. Lead ii)- Bituminous Road | 1 | Sqm | 305.9 | ₹305.9 |
| 3 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50m. Lead 1)- 1:3:6 or Richer mix | 1 | Cum | 1,725.2 | ₹1,725.2 |
| 3.01 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50m. Lead ii)- 1:4:8 or Leaner mix | 1 | Cum | 1,064.55 | ₹1,064.55 |
| 4 | Extra for scrapping cleaning and straightening reinforcement from RCC or R.B. work | 1 | kgs | 6.75 | ₹6.75 |
| 5 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth 1 meter from cutting edge. 1. All Kinds of soils :- | 1 | Cum | 479.3 | ₹479.3 |
| 5.01 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres:
1 All kinds of soil : | 1 | Cum | 256.85 | ₹256.85 |
| 6 | Filling available excavated earth (excld. Rock) in trenches plinth slides of foundation etc. layers not exceeding 20cm in depth consolidating each deposited layer by ramming & watering lead upto 50m. & lift upto 1.5m. | 1 | Cum | 218.4 | ₹218.4 |
| 7 | Engagement of skilled/unskilled labours | 1 | Per Day | 750 | ₹750 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_1019615.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid