Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical AS PER TENDER DOCUMENT |
| 2 | Accepted-Technical | Accepted-Technical AS PER TENDER DOCUMENT |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹24.7 L
EMD Value
₹49,341
Closing Date
3 Aug 2026, 11:00 amClosed
EXECUTIVE ENGINEER MECHANICAL DIVISION LEH
OFFICE OF THE EXECUTIVE ENGINEER MDL
Reorientation Repair Replacement Modification of Central Heating System at Sindhu Sanskriti Kendrya Leh.
2026_PWD_19244_1
MDL TS 06 2026-27
Open Tender
Miscellaneous Works
Turn-key
15 days
LEH
AS PER TENDER DOCUMENT
2 documents required · 2 mandatory
₹1,000
EXECUTIVE ENGINEER MECHANICAL DIVISION LEH
₹49,341
Yes
7 Aug 2026
24 Jul 2026
5 Aug 2026
24 Jul 2026
3 Aug 2026
24 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Reorientation/Repair/Replacement/Modification of Central Heating System at Sindhu Sanskriti Kendrya Leh. | - | - | - | - |
| 3 | Dismantle of all MS heating pipes and AHU'S and refitting of all existing equipments along with additional items as mentioned in the BOQ after completion of civil works. The job also includes providing of crane, labours and any other item or job not mentioned in the BOQ but is necessary for completion of the work. Complete draining of the system before repairs and making good after repairs all damages made during the execution of the work. | - | Job | 100 | - |
| 4 | AHUs , control panel and Louvers
Supply, installation, testing and commissioning of horizontal double-skinned Air Handling Unit (AHU), comprising an extruded aluminium frame with 48±2 mm PUF insulated panels (40 kg/m³ density), 0.8 mm pre-painted GI outer sheet and 0.8 mm Aluzinc/GI inner sheet, complete with thermal break profile and airtight gasketed construction. The unit shall include AMCA-certified SISW fan(s) with EC motors (415V, 50Hz), 6-row aluminium fin/copper tube cooling coil with premium corrosionresistant coating, mixing box, pre-filter and MERV-13 fine filter sections, insulated stainless steel drain pan with diamond-cut slope, and aluminium-mounted motor/blower assembly along with control Panel . SystemAir, Edgetech, Zeco, Daikin. Air Quantity 1640-1650 LPS
Static Pressure 120-130MMWG
Motor 3.6 to 3.8 KW
The job includes:
AHUs along with control panel = 02Nos
Adjustable blade Louvers 24 x 24 inch = 08 Nos
Adjustable blade Louvers 12 x 48 inch = 04 Nos | - | Job | 100 | - |
| 5 | SITC of Heavy Duty MS Class "C" pipe insulated with 1" thick nitrile foam with almunium cladding to exterior exposed pipes and coated with metal primer and heat proof white paint to interior exposed pipes. The job including all fittings like flange, TEE, Bends, Reducers, iron stands etc.
80 MM Dia | - | RM | 10 | - |
| 6 | 65 MM Dia | - | RM | 10 | - |
| 7 | 50 MM Dia | - | RM | 10 | - |
| 8 | 40 MM Dia | - | RM | 10 | - |
| 9 | Insulation to MS pipes with 1" thick nitrile foam with almunium cladding to exterior exposed pipes.
100 MM Dia | - | RM | 10 | - |
| 10 | 80 MM Dia | - | RM | 10 | - |
| 11 | Non toxic antifreeze (The right antifreeze product intended for use in heating boilers not automobile as the chemicals are different ) Propylene Glycol mixture is installed in the system to avoid costly water or mold contamination .
The amount or volume of antifreeze need to add to reach a desired freezing temperature of -40˚C. | - | Ltrs | 10 | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
Tdoc.pdf
Tender Documents • 0.96 MB
BOQ_45767.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .