| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.2 LAccepted-Finance | ₹5.2 L | 1 | Accepted-Finance L1 Bidder |
| 2 | 2₹5.3 LRejected-Finance | ₹5.3 L | 2 | Rejected-Finance L2 Bidder |
| Sl No | Description | Qty | Unit | TAJ INFRA L1 | M/s A.Chelladurai & Co L2 |
|---|---|---|---|---|---|
| 1.00 | Assisting shift/Maintenance duties in the cadre of Technical assistant Grade - II | 3 | m² | 1,090 ₹2.0 L | 1,000 ₹1.8 L |
| 2.00 | Assisting shift/Maintenance duties in the cadre of Wireman Grade -II | 2 | m² | 820 ₹1.0 L | 730 ₹89,060 |
| 3.00 | Assisting shift/Maintenance duties in the cadre Field Assistant/Mazdoor Grade - II | 4 | m² | 534 ₹1.3 L | 530 ₹1.3 L |
| 4.00 | Contractors service charges to be quoted in Percentage (value alone) Ex. 1%, it should be entered as 1 only. | 1 | LS | 1.9 ₹8,166.31 | 12 ₹48,165.60 |
| 5.00 | SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only for Tamil Nadu Contractor. If the contractor is outside Tamil Nadu may be quoted as "0" only | 1 | LS | 9 ₹39,417.51 | 9 ₹40,459.10 |
| 6.00 | CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only for Tamil Nadu Contractor. If the contractor is outside Tamil Nadu may be quoted as "0" only | 1 | LS | 9 ₹39,417.51 | 9 ₹40,459.10 |
| 7.00 | Inter-state GST to be quoted in percentage (value alone) Ex. 18%, it should be entered as 18 only for other than Tamil Nadu contractor. If the contractor is within Tamil Nadu may be quoted as "0" only | 1 | LS | - | - |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
16 Jan 2025, 2:00 pmClosed
Executive Engineer/Operation/Othakkalmandapam
O/o, Executive Engineer/ Operation, 230/110KV Substation, Othakkalmandapam, Coimbatore - 641 032.
Supplying 549 Nos. Mandays for Shift/ Maintenance activities at 230/110KV Othakkalmandapam Substation for a period of two months from the date of utilization under works contract in Coimbatore Operation circle.
2025_EB_516055_1
ET/EE/O/OKM/04/2024-25, Dated. 02.01.2025
Limited
Electrical and Maintenance Works
230/110KV Othakkalmandapam Substation
Please refer tender documents.
3 documents required · 3 mandatory
₹0
₹5,000
Yes
19 Feb 2026
2 Jan 2025
17 Jan 2025
2 Jan 2025
16 Jan 2025
2 Jan 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid