| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC 50 PRINCE ANWAR SHAH ROAD KOLKATA 700033 | KOLKATA | WEST BENGAL | 700033 | ₹4.9 L | L1 | Accepted-AOC Lowest (L1) |
| 2 | L2₹4.9 L+₹8,502.18 (1.75%)Rejected-Finance 1 57 BAGHAJATIN COLONY KOLKATA 92 | KOLKATA | WEST BENGAL | ₹4.9 L+₹8,502.18 (1.75%) | L2 | Rejected-Finance Not L1 |
| 3 | L3₹4.9 L+₹8,838.43 (1.82%)Rejected-Finance DHABLAT LALIPUR | ₹4.9 L+₹8,838.43 (1.82%) | L3 | Rejected-Finance Not L1 |
| 4 | Rejected-Technical 103 SADAR ROAD JORASHIB MANDIR NORTH BARRACKPORE KOL 700120 | NORTH BARRACKPORE | NORTH 24 PARGANAS | WEST BENGAL | 700120 | - | - | Rejected-Technical Shortfall documents as asked for not submitted |
| 5 | Rejected-Technical | - | - | Rejected-Technical Shortfall documents as asked for not submitted |
Tender Value
₹4.8 L
EMD Value
₹9,610
Closing Date
29 Jun 2026, 12:00 pmClosed
EE, DIV-VI, Circle II (KIT), Housing Sector, KMDA
OFFICE OF THE EXECUTIVE ENGINEER DIVISION-VI, HOUSING SECTOR , KMDA(KIT WING) Unnayan Bhawan, DJ-11, Sector-II, 1st Floor, Block-A, Salt Lake, Kolkata- 700 091
Urgent repairing work of O.H. water reservoir and repairing of concrete path way at the back side of 1 and 4A at Housing Scheme No. 114A, Lake Gardens, KMC Ward No.-93
2026_KMDA_1028322_1
KMDA/HOUSING /EE/DIV-VI/Circle II (KIT)/NIT-02/2026-2027
Open Tender
CIVIL WORKS
Percentage
90 days
114A, Lake Gardens
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹9,610
24 Jul 2026
19 Jun 2026
1 Jul 2026
19 Jun 2026
29 Jun 2026
19 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. | 10 | Cum | 939 | ₹9,390 |
| 2 | Dismantling R.C. floor, roof, beams etc. Including cutting rods and removing rubbish as directedwithina lead of 75m. includingstacking of steel bars.
a) At 3rd floor. | 3 | Cum | 2,106 | ₹6,318 |
| 3 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge | 15 | Cum | 166 | ₹2,490 |
| 4 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in gound floor as per relevant IS codes.
Pakur variety | 14 | Cum | 5,440.94 | ₹76,173.16 |
| 5 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes
a) At 3rd floor. | 3 | Cum | 6,045.86 | ₹18,137.58 |
| 6 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of work
(i)At 3rd floor | 25 | Sqm | 423 | ₹10,575 |
| 7 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
(a) For works in foundation, basement and upto roof of ground floor/upto 4 m
(i) Tor steel/Mild Steel
I. JSW/JSPL/SHYAM/SRMB/ELECTROSTEEL/ BMASL/SSL
a) At 3rd. floor | 0.3 | M.T. | 54,547.74 | ₹16,364.32 |
| 8 | Cleaning the exposed reinforcement preferably upto full diameter by wire brush, applying two coats of polymer based rust removing compound left for 24 hours, removing the coating and then applying two (2) coats of polymer modified anti corrosive protective coating formulated to inhibit the corrosion of reinforcement as per manufacturer's specification] [Mode of measurement:The affected surface area of reinforcement shall be considered for payment]. | 2 | Sqm | 782 | ₹1,564 |
| 9 | Cleaning the concrete surface by removing dirt and debris, marking defective locations and removing loose concrete by careful stripping untill hard surface is exposed, cutting the concrete to regular shape, wire brushing the exposed surface and removing debris from site complete as per direction of the Engineer - in - Charge. | 98 | Sqm | 90 | ₹8,820 |
| 10 | Applying epoxy mortar ( 10 mm nominal thick) over leached, honey combed and spalled concrete surface and exposed steel reinforcement complete as per Technical specification | 98 | Sqm | 665 | ₹65,170 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.68 MB
Tendernotice_2.pdf
PDF • 0.06 MB
Tendernotice_3.pdf
PDF • 0.12 MB
BOQ_2525845.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .