Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 LAccepted-Finance | ₹14.5 L | L1 | Accepted-Finance Responsive |
Tender Value
₹14.6 L
EMD Value
₹29,140
Closing Date
18 Aug 2026, 6:00 pmClosed
Executive Engineer Irrigation Division Tral
Executive Engineer Irrigation Division Tral
Restoration of Water Channel at Lalgam
2026_IFC_318800_1
e NIT No 03 of 2026-27
Open Tender
Civil Works
Percentage
25 days
Irrigation Division Tral
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Chief Engineer I and FC Kashmir
₹29,140
21 Sept 2026
31 Jul 2026
19 Aug 2026
31 Jul 2026
18 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil : | 165.5 | Cum | 592.9 | ₹98,124.95 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 13.11 | Cum | 5,202.9 | ₹68,210.02 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 58.26 | Cum | 7,788.4 | ₹4,53,752.18 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for:
Foundations, footings, bases for columns | 235.94 | Sqm | 286.35 | ₹67,561.42 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level
Thermo-Mechanically Treated bars of grade Fe-500D or more. | 3,204 | Kg | 123.2 | ₹3,94,732.8 |
| 6 | 12mm Cement plaster of mix:
1 : 4 ( 1 cement : 4 fine sand) | 240.31 | Sqm | 283.8 | ₹68,199.98 |
| 7 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 143.07 | Cum | 218.4 | ₹31,246.49 |
| 8 | Supplying and stacking at site
Good Earth | 38.18 | Cum | 281.3 | ₹10,740.03 |
| 9 | Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand. | 1,165 | No | 7.8 | ₹9,087 |
| 10 | Loading/Unloading sand/ earth filled bags in lorries; lead upto 50m. | 1,165 | No | 4.95 | ₹5,766.75 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
BOQ_1052590.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .