| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Single₹15.8 LAccepted-AOC | Single | Accepted-AOC Low Quoted |
Tender Value
₹15.1 L
EMD Value
₹30,290
Closing Date
21 Oct 2022, 3:00 pmClosed
Executive Engineer
Executive Engineer (PRI) South Andaman Division-I No. J/4, Old Councilor Bungalow, Junglighat, Port Blair, South Andaman
Black Top Road from Arabandu Bala house to Mahadev Par house at Netaji Nagar under Netaji Nagar Gram Panchayat. (4th Call)
2022_RDPRI_7601_1
EE/PRI/SAD-I/RR/2020-21/1079
Open Tender
Civil Works - Roads
Works
180 days
Netaji Nagar, Little Andaman
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Executive Engineer, GPPS
₹30,290
4 Mar 2023
11 Oct 2022
21 Oct 2022
12 Oct 2022
21 Oct 2022
12 Oct 2022
Amount
Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres.
Supplying and stacking at site.
90 mm to 45 mm size stone aggregate
63 mm to 45 mm size stone aggregate
53 mm to 22.4 mm size stone aggregate
Stone screening 13.2 mm nominal size (Type A)
Stone screening 11.2 mm nominal size (Type B)
Moorum
Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density .
Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications :
On W.B.M. @ 0.75 Kg I sqm
2 cm premix carpet surfacing with 1.8 cum and 0.90 cum of stone chippings of 13.2 mm size and 11.2 mm size respectively per 100 sqm and 52 kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively, including a tack coat with hot straight run bitumen, including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately). ( Use shredded plastic @10% of total bitumen instead of 100% i.e 90% VG-30 & 10% shredded plastic)
With paving Asphalt grade VG - 30 with no solvent
Providing and laying seal coat of premixed fine aggregate ( passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG - 10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface, including rolling and finishing with road roller all complete.
Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m :
All kinds of soil
Carriage of moorum/earth by Mechanical Transport including loading, unloading in truck then stacking at work site properly with in a lead of 8.00 Km.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .