Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance 224 OFFICERS ENCLAVE BEHIND PLV MEMORIAL COLLAGE SHIKARGARH ARMY AREA JODHPUR RAJ 342001 | JODHPUR | JODHPUR | RAJASTHAN | 342001 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance VILLAGE SEWAPURA POST KADERA TH CHAKSU JAIPUR RAJASTHAN | JAIPUR | JAIPUR | RAJASTHAN | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.0 Cr
EMD Value
₹2.0 L
Closing Date
14 Jun 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
UNIT HEAD
RIICO LTD. ALWAR
Construction of RCC OHSR at MIA Alwar
2022_RIICO_278562_1
12/2022-23
Open Tender
Civil Works
Percentage
180 days
ALWAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
RIICO LTD.
₹2.0 L
Yes
15 Jun 2022
3 Jun 2022
15 Jun 2022
3 Jun 2022
14 Jun 2022
3 Jun 2022
90 days
Amount
Dismantling/Demolishing of elevated service reservoir situated at Khairthal, Alwar using barricading, scaffolding etc. wherever necessary. The contractor will have to deposit the pipes and sluice valve etc. in MIA store to store in-charge in good condition before breaking off structure. However the broken cement concrete and reinforcement of demolished structure shall be property of contractor. He has to dispose off this serviceable/ unserviceable material away from industrial area or in dumping yard. The site shall have to be levelled and cleared after the demolishing complete in all respect. The reinforcement taken out after dismantling will also be property of contractor. Rate to be quoted by agency as complete job. Contractor should take all safety measures as per site requirement at the time of dismantling of SR. The whole safety measures should be on the part of contractor. Department shall not be liable for this. Work is to be done as per instructions given by engineer-in-charge.
Bidder Name
Amount
shyam traders(GSTN-08BHEPS8937E1ZW)
SHAMA CONSTRUCTION COMPANY(GSTN-08ABAPA1153D1ZJ)
P M Construction Company(GSTN-08ABIPY8298F1ZR)
SRI KRISHNA CONST. COMAPNY KI.RENWAL(GSTN-08ACPPY6080K1ZN)
Hariom Construction Company(GSTN-08AAGFH3300Q1Z9)
M/S PACHAR AND COMPANY(GSTN-NA)
M/s Nest Infra(GSTN-NA)
SK ASSOCIATES(GSTN-NA)
SRI KRISHNA CONST. COMAPNY KI.RENWAL
M/S PACHAR AND COMPANY
Hariom Construction Company
M/s Nest Infra
P M Construction Company
SK ASSOCIATES
SHAMA CONSTRUCTION COMPANY
M/s Nest Infra
P M Construction Company
SHAMA CONSTRUCTION COMPANY
shyam traders
M/S PACHAR AND COMPANY
SK ASSOCIATES
Hariom Construction Company
stage.html
html • 0.03 MB
finance_495107.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .