| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.8 LAccepted-AOC ALAGHU BHAVANAM 83 YATHAVAR STREET TUTICORIN 02 | ₹10.8 L Quoted ₹13.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹14.1 LRejected-AOC | ₹14.1 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | R.K.V. ENTERPRISES L2 | ALAGUMUTHU ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | HT Motors : Charges for removing of terminal covers cleaning the terminal box by blower tightness checking of all three phase end terminals, and control termination, checking the DE/NDE bearing condition lubricating with grease- after completion of work meggering the motor trial operation with load including cost of consumables and hire charges for T&Ps etc., complete. | 48 | Operation | 1,26,528 ₹1.5 L | 1,17,504 ₹1.4 L |
| 2.00 | LT Motors : Charges for removing of terminal cover cleaning of LT motor, terminal box by blower, tightness checking of all three phase end termination, bearing checking and greasing- after completion of this work meggering the motor winding check the motor trial operation with load including cost of consumables,hire charges for T&Ps Etc. complete For 30 KW to 120KW | 36 | Operation | 45,360 ₹53,524.80 | 42,120 ₹49,701.60 |
| 3.00 | " " For 10 KW to 29 KW | 12 | Operation | 12,876 ₹15,193.68 | 11,964 ₹14,117.52 |
| 4.00 | " " Upto 10 KW | 180 | Operation | 1,44,900 ₹1.7 L | 1,34,640 ₹1.6 L |
| 5.00 | Scoop system/PLC/Switches/ FC panels etc., Charges for removing the top cover, cleaning all inside, the local/remote switch and push buttons, checking the terminal tightness, refixing the all in its original positions and cleaning the carbon dust particles and cleaning the terminal cover, internal components/ elements with molykote, tightness checking of bolts and nuts internal tightness checking of wiring with components and checking of annunciation in control desk/ panel, terminal tightness checking, checking the operation thoroughly including cost of consumables etc., complete. | 140 | Operation | 3,27,880 ₹3.9 L | 3,04,500 ₹3.6 L |
| 6.00 | Maintenance of Lighting : Charges for removal of carbon dust particles in the lighting accessories like MCB, PDB’s, 150W, 400W light fittings, tightness checking of all cables (wire checking the light fitting if necessary attending the circuit fault and replacement of bulb/ choke/ MCB/ Igniter will be supplied by TANGEDCO at free of cost in Conveyor-72,73,48A,B 61, 64, RBFD-1A/1B, JT-20, JT-20A high mast tower light near at JT-20, TT-7 & PCHII including hire charges for T&Ps, Cost of consumables etc., complete. | 120 | Operation | 7,53,960 ₹8.9 L | 7,00,320 ₹8.3 L |
Tender Value
Refer Docs
EMD Value
₹8,900
Closing Date
2 Jan 2026, 2:00 pmClosed
Chief Engineer/TTPS
O/o CE/TTPS
ECHP-II-Attending Electrical maintenance in CHS V Preventive electrical maintenance of conveyor 48A/B, RBFD 1A, 1B, 61, 64, 73, and Conveyor 72
2025_EB_633709_1
CE/SE/MI/TTPS/67/2026-2027
Open Tender
Miscellaneous Works
365 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,900
Yes
25 Mar 2026
18 Dec 2025
3 Jan 2026
18 Dec 2025
2 Jan 2026
18 Dec 2025
HT Motors : Charges for removing of terminal covers cleaning the terminal box by blower tightness checking of all three phase end terminals, and control termination, checking the DE/NDE bearing condition lubricating with grease- after completion of work meggering the motor trial operation with load including cost of consumables and hire charges for T&Ps etc., complete.
LT Motors : Charges for removing of terminal cover cleaning of LT motor, terminal box by blower, tightness checking of all three phase end termination, bearing checking and greasing- after completion of this work meggering the motor winding check the motor trial operation with load including cost of consumables,hire charges for T&Ps Etc. complete For 30 KW to 120KW
" " For 10 KW to 29 KW
" " Upto 10 KW
Scoop system/PLC/Switches/ FC panels etc., Charges for removing the top cover, cleaning all inside, the local/remote switch and push buttons, checking the terminal tightness, refixing the all in its original positions and cleaning the carbon dust particles and cleaning the terminal cover, internal components/ elements with molykote, tightness checking of bolts and nuts internal tightness checking of wiring with components and checking of annunciation in control desk/ panel, terminal tightness checking, checking the operation thoroughly including cost of consumables etc., complete.
Maintenance of Lighting : Charges for removal of carbon dust particles in the lighting accessories like MCB, PDB’s, 150W, 400W light fittings, tightness checking of all cables (wire checking the light fitting if necessary attending the circuit fault and replacement of bulb/ choke/ MCB/ Igniter will be supplied by TANGEDCO at free of cost in Conveyor-72,73,48A,B 61, 64, RBFD-1A/1B, JT-20, JT-20A high mast tower light near at JT-20, TT-7 & PCHII including hire charges for T&Ps, Cost of consumables etc., complete.
R.K.V. ENTERPRISES (BID ID -1543887)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_758212.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid