Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.2 LAdmitted-Finance | -27.99% | ₹7.2 L | L1 | Admitted-Finance |
| 2 | L2₹7.6 L+₹38,866.30 (5.39%)Admitted-Finance | -24.11% | ₹7.6 L+₹38,866.30 (5.39%) | L2 | Admitted-Finance |
| 3 | L3₹8.3 L+₹1.0 L (14.6%)Admitted-Finance 106 DAROOGA MOHALLA LAL KOTHI AHOO DARWAJA DIG | -17.51% | ₹8.3 L+₹1.0 L (14.6%) | L3 | Admitted-Finance |
| 4 | L4₹8.3 L+₹1.1 L (15.3%)Admitted-Finance | -16.99% | ₹8.3 L+₹1.1 L (15.3%) | L4 | Admitted-Finance |
| 5 | L5₹8.7 L+₹1.4 L (20.0%)Admitted-Finance | -13.57% | ₹8.7 L+₹1.4 L (20.0%) | L5 | Admitted-Finance |
Tender Value
₹11.8 L
EMD Value
₹23,640
Closing Date
8 Jul 2026, 6:00 pmClosed
EE PWD DN PARBATSAR
EE PWD DN PARBATSAR
Construction of CD Work on Kurada to Barnel Road
2026_CEPWD_572703_3
NIT No. 08 of 2026-27 EE PWD DN PARBATSAR
Open Tender
Civil Works
Percentage
60 days
PARBATSAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EE PWD DN PARBATSAR, MD RISL JAIPUR
₹23,640
Yes
10 Jul 2026
2 Jul 2026
9 Jul 2026
2 Jul 2026
8 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dr | 167.67 | Cum | 137 | ₹22,970.79 |
| 2 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104
P.C.C grade M 10
Nominal mix 1:3:6 | 36.95 | Cum | 2,584 | ₹95,465.88 |
| 3 | Stone masonry work in cement mortar in foundation complete as per drawing and MoRTH specifications Clauses 1402, 1405, 2102 & 2104 including Weepholes as per MoRTH specifications Clauses 2706
Coursed rubble masonry (1st sort)
In 1:4 cement mortar | 218.7 | Cum | 3,183 | ₹6,96,122.1 |
| 4 | Pointing with cement mortar (1:3) on Stone work as per drawing and MoRTH specification Clauses 1406 and 2200 | 162 | Sqm | 70 | ₹11,340 |
| 5 | Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and MoRTH specification Clauses 1313, 1411 and 2206.6
50 mm thick | 72.9 | Sqm | 211 | ₹15,381.9 |
| 6 | Fillling in foundation trenches as per drawing and MoRTH specification Clause 304.3.7
Earth filling (For marshy soil) | 476.28 | Cum | 92 | ₹43,817.76 |
| 7 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth whe | 72.9 | Cum | 407 | ₹29,670.3 |
| 8 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, bac | 22.5 | Rmt | 3,864 | ₹86,940 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_1018745.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .