Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹7.2 LAccepted-AOC | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹6.6 L+₹50,824.36 (8.31%)Rejected-AOC | L-2 | Rejected-AOC L-2 | |
| 3 | L-3₹6.7 L+₹55,434.09 (9.07%)Rejected-AOC | L-3 | Rejected-AOC L-3 | |
| 4 | L-4₹6.7 L+₹61,223.72 (10.0%)Rejected-AOC | L-4 | Rejected-AOC L-4 |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
6 Jun 2022, 3:00 pmClosed
Sr Xen civil mtc Division,PSTCL,Jalandhar
Sr Xen civil mtc Division,PSTCL,Jalandhar
Replacement of old u fencing at 132 kv sub station Jandiala Guru
2022_POWER_86238_1
ET-22/2022-23
Open Tender
Civil Works
Item Rate
90 days
Jandiala guru
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹15,000
Yes
10 Oct 2022
31 May 2022
7 Jun 2022
31 May 2022
6 Jun 2022
31 May 2022
Amount
Dismantling of brick work in cement
Scraping of bricks Dismantled from brick work
Dismantling of concrete for Removal of Old Angle
PF/ Angle iron post 75x75x8 3.12 mtr @4.50kg/Rm
P/F Angle iron post 50x50x6 mm 3.12 mtr. Long @4.50kg/Rm (15+12)
P/F Angle iron post 50x50x6 mm 2.60 mtr. Long @4.50kg/Rm (20+8)
Ist class brick work in cement sand mortar 1:5 in foundation and plinth OLD TOE WALL
First class brick work in cement sand mortar 1:5 above plinth level
Centring and shuttering of block for grouting of Angle Iron
Cement cocrete 1:2:4 for grouting of Angles as per CSR 10.13
12.5 MM thick cement plaster 1:5 OLD Toe Wall
Priming coat over mettalic surface including preperaton of surface with special quality paint
Scraping of Old Paint form Angles for new one
Painting two coats with aluminium paint of special quality
Corrugated GI Sheet roofing 0.80 mm thick fixed with galvanized iron J or L hooks 10mm dia, GI Limpot and bitumen washers complete excluding the cost of purling rafters and trusses.
P/F wire netting mesh of G.I. ,12 Gauge 50x50 Mesh 180 cm high complete as per NS Item (340 OLD+54 NEW)
P/F Barbed wire 4 rows over angle for U-Fencing complete AS per NS item
Extra carriage for fine sand as per AOR
Extra carriage for Aggregate as per AOR
Extra carriage for Bricks as per AOR
Extra carriage for Cement
recover of scrap
recovery of bricks (5150+10%+1%)
diff of material rate for Crushed bajri 13.2mm
diff of material rate Crushed bajri 11.2mm
diff of material rate for coarse sand
diff of material rate for tiles
THE CHETANPURA COOPERATIVE L/C SOCIETY
The Goldstar Cooperative Labour and Construction Society Ltd.
The Khalsa Co-op L/C Society Ltd
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .