| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAccepted-AOC DHAMARAIPAKKAM BUILDING AT PUES IN DHAMARAIPAKKAM PANCHAYAT | ₹2.9 Cr | L1 | Accepted-AOC L-1 SSKT Enterprises Lowest Rate |
| 2 | L2₹2.9 CrRejected-AOC | ₹2.9 Cr | L2 | Rejected-AOC L-2 Rajaram and Co
Highet Rate |
| Sl No | Description | Qty | Unit | RAJARAM AND CO L2 | SSKT ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00Thimiri Block Package No.2 | |||||
| 2.001.Strengthening the road from Mosur to Paradharami road KM 0/0-0/750 (R-257 ) at Thimiri Block of Ranipet District | |||||
| 3.00 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 810 | Sqm | 7.5 ₹6,075 | 6.36 ₹5,151.60 |
| 4.00 | Picking 5 Cm to 10 cm of existing wornout BT / WBM Surface sectioning in all labour charges etc complete (1/3) | 757.5 | Sqm | 32 ₹24,240 | 23.2 ₹17,574 |
| 5.00 | Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A.. | 405 | Cum | 140.45 ₹56,882.25 | 140.45 ₹56,882.25 |
| 6.00 | Collection and supply of Cartered Earth for Basecourse And side berms and labour charges for filling etc complete | 90 | Cum | 146.39 ₹13,175.10 | 146.39 ₹13,175.10 |
| 7.00 | Providing & Laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges rentals for machinery, fuel and all other incidental charges etc, completed as per clause of MORTH Rev-5. | 340.88 | Cum | 2,468.16 ₹8.4 L | 2,468.16 ₹8.4 L |
| 8.00 | Applying Prime coat over WMM surface using 7 kgs of bitumen emulsion (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5. | 2,272.5 | Sqm | 86.51 ₹2.0 L | 86.51 ₹2.0 L |
| 9.00 | Applying tack coat over WMM surface using 2.50 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions appended herewith including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags, etc., complete as per standard specification No 503 of MOST | 2,272.5 | Sqm | 20 ₹45,450 | 20 ₹45,450 |
| 10.00 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 68.18 | Cum | 11,571.78 ₹7.9 L | 11,571.78 ₹7.9 L |
Tender Value
₹2.9 Cr
EMD Value
₹3.1 L
Closing Date
6 Mar 2026, 3:00 pmClosed
Project Director
Project Director DRDA-Ranipet
Strengthening of 7 Roads in Thimiri Block at Ranipet District MGSMT 2025-26 Additional package no.2
2026_RDTN_668133_1
A3/659/2026
Open Tender
Civil Works
180 days
DRDA-Ranipet
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3.1 L
9 May 2026
27 Feb 2026
6 Mar 2026
27 Feb 2026
6 Mar 2026
27 Feb 2026
Thimiri Block Package No.2
1.Strengthening the road from Mosur to Paradharami road KM 0/0-0/750 (R-257 ) at Thimiri Block of Ranipet District
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Picking 5 Cm to 10 cm of existing wornout BT / WBM Surface sectioning in all labour charges etc complete (1/3)
Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A..
Collection and supply of Cartered Earth for Basecourse And side berms and labour charges for filling etc complete
Providing & Laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges rentals for machinery, fuel and all other incidental charges etc, completed as per clause of MORTH Rev-5.
Applying Prime coat over WMM surface using 7 kgs of bitumen emulsion (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5.
Applying tack coat over WMM surface using 2.50 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions appended herewith including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags, etc., complete as per standard specification No 503 of MOST
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
PRetro-Reflectorised Traffic Signs (with out definition board) Type - IV Providing and erecting of Retro - Reflector›sed Cautionary, Maridatory and Informatory signs {without definition board} made out of High Intensity Prismatic Grade Sh
60 cm equilateral triangle
Provision for Hectometer stone
Provision for Pipe Culvert ch at 0/500
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete
Supply and Fixing of 900 mm Dia 2.50 m Hume pipe including cost and Conveyance etc., complete
2.Strengthening the road from Thimiri Mullandiram to Melathangal road KM 0/0-0/750 (R-90) at Thimiri Block of Ranipet District
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Picking 5 Cm to 10 cm of existing wornout BT / WBM Surface sectioning in all labour charges etc complete (1/3)
Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A..
Collection and supply of Cartered Earth for Basecourse And side berms and labour charges for filling etc complete
Providing & Laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges rentals for machinery, fuel and all other incidental charges etc, completed as per clause of MORTH Rev-5.
Applying Prime coat over WMM surface using 7 kgs of bitumen emulsion (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5.
Applying tack coat over WMM surface using 2.50 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions appended herewith including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags, etc., complete as per standard specification No 503 of MOST
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
PRetro-Reflectorised Traffic Signs (with out definition board) Type - IV Providing and erecting of Retro - Reflector›sed Cautionary, Maridatory and Informatory signs {without definition board} made out of High Intensity Prismatic Grade Sh
60 cm equilateral triangle
Provision for Hectometer stone
3.Strengthening the road from Valaiyathur Jogikudisai road KM 0/0-0/700 (R-192) at Thimiri Block of Ranipet District
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Picking 5 Cm to 10 cm of existing wornout BT / WBM Surface sectioning in all labour charges etc complete (1/3)
Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A..
Collection and supply of Cartered Earth for Basecourse And side berms and labour charges for filling etc complete
Providing & Laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges rentals for machinery, fuel and all other incidental charges etc, completed as per clause of MORTH Rev-5.
Applying Prime coat over WMM surface using 7 kgs of bitumen emulsion (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5.
Applying tack coat over WMM surface using 2.50 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions appended herewith including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags, etc., complete as per standard specification No 503 of MOST
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
PRetro-Reflectorised Traffic Signs (with out definition board) Type - IV Providing and erecting of Retro - Reflector›sed Cautionary, Maridatory and Informatory signs {without definition board} made out of High Intensity Prismatic Grade Sh
60 cm equilateral triangle
Provision for Hectometer stone
Provision for Hard bed ch at 0/651-0/680
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
Supply and fixing of bitumen pad for expansion joints including all cost and conveyance an d etc complete
4.Strengthening the road from T pudur to nambithangal road KM 0/0-1/120 (R-145) at Thimiri Block of Ranipet District
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Picking 5 Cm to 10 cm of existing wornout BT / WBM Surface sectioning in all labour charges etc complete (1/3)
Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A..
Collection and supply of Cartered Earth for Basecourse And side berms and labour charges for filling etc complete
Providing & Laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges rentals for machinery, fuel and all other incidental charges etc, completed as per clause of MORTH Rev-5.
Applying Prime coat over WMM surface using 7 kgs of bitumen emulsion (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5.
Applying tack coat over WMM surface using 2.50 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions appended herewith including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags, etc., complete as per standard specification No 503 of MOST
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
PRetro-Reflectorised Traffic Signs (with out definition board) Type - IV Providing and erecting of Retro - Reflector›sed Cautionary, Maridatory and Informatory signs {without definition board} made out of High Intensity Prismatic Grade Sh
60 cm equilateral triangle
Provision for Hectometer stone
Provision for Kilometer stone
5.Strengthening of Soraiyur Harijan colony road KM 0/0 -1/400 (R-131) at Thimiri Block of Ranipet District
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Picking 5 Cm to 10 cm of existing wornout BT / WBM Surface sectioning in all labour charges etc complete (1/3)
Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A..
Collection and supply of Cartered Earth for Basecourse And side berms and labour charges for filling etc complete
Providing & Laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges rentals for machinery, fuel and all other incidental charges etc, completed as per clause of MORTH Rev-5.
Applying Prime coat over WMM surface using 7 kgs of bitumen emulsion (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5.
Applying tack coat over WMM surface using 2.50 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions appended herewith including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags, etc., complete as per standard specification No 503 of MOST
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
PRetro-Reflectorised Traffic Signs (with out definition board) Type - IV Providing and erecting of Retro - Reflector›sed Cautionary, Maridatory and Informatory signs {without definition board} made out of High Intensity Prismatic Grade Sh
60 cm equilateral triangle
Provision for Hectometer stone
Provision for Kilometer stone
Provision for 1.50m Culvert ch at 0/588
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Plain Cement Concrete 1:2:4 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc Complete,
RCC 1:1.5:3 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc,
Supply and fabrication of steel for RCC items including cost and conveyance of binding wire, etc., complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items upto sill level
Deck slab
Provision for 1.50m Culvert ch at 0/679
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Plain Cement Concrete 1:2:4 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc Complete,
RCC 1:1.5:3 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc,
Supply and fabrication of steel for RCC items including cost and conveyance of binding wire, etc., complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items upto sill level
Deck slab
Provision for 1.50m Culvert ch at 0/882
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Plain Cement Concrete 1:2:4 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc Complete,
RCC 1:1.5:3 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc,
Supply and fabrication of steel for RCC items including cost and conveyance of binding wire, etc., complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items upto sill level
Deck slab
Provision for Pipe Culvert ch at 1/101
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete
Supply and Fixing of 900 mm Dia 2.50 m Hume pipe including cost and Conveyance etc., complete
6.Strengthening the road from Durgam Colony to Mohanawaram road KM 0/0-1/610 (R-238)at Thimiri Block of Ranipet District
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Picking 5 Cm to 10 cm of existing wornout BT / WBM Surface sectioning in all labour charges etc complete (1/3)
Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A..
Collection and supply of Cartered Earth for Basecourse And side berms and labour charges for filling etc complete
Providing & Laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges rentals for machinery, fuel and all other incidental charges etc, completed as per clause of MORTH Rev-5.
Applying Prime coat over WMM surface using 7 kgs of bitumen emulsion (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5.
Applying tack coat over WMM surface using 2.50 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions appended herewith including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags, etc., complete as per standard specification No 503 of MOST
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
PRetro-Reflectorised Traffic Signs (with out definition board) Type - IV Providing and erecting of Retro - Reflector›sed Cautionary, Maridatory and Informatory signs {without definition board} made out of High Intensity Prismatic Grade Sh
60 cm equilateral triangle
Provision for Hectometer stone
Provision for Kilometer stone
Provision for 1.50m Culvert ch at 0/500
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Plain Cement Concrete 1:2:4 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc Complete,
RCC 1:1.5:3 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc,
Supply and fabrication of steel for RCC items including cost and conveyance of binding wire, etc., complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items upto sill level
deck slab
7.Strengthening the road from Senganavaram ayiramangalam to Senganavaram road KM 0/0-1/800 (R-230)at Thimiri Block of Ranipet District
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Picking 5 Cm to 10 cm of existing wornout BT / WBM Surface sectioning in all labour charges etc complete (1/3)
Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A..
Collection and supply of Cartered Earth for Basecourse And side berms and labour charges for filling etc complete
Providing & Laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges rentals for machinery, fuel and all other incidental charges etc, completed as per clause of MORTH Rev-5.
Applying Prime coat over WMM surface using 7 kgs of bitumen emulsion (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5.
Applying tack coat over WMM surface using 2.50 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions appended herewith including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags, etc., complete as per standard specification No 503 of MOST
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
PRetro-Reflectorised Traffic Signs (with out definition board) Type - IV Providing and erecting of Retro - Reflector›sed Cautionary, Maridatory and Informatory signs {without definition board} made out of High Intensity Prismatic Grade Sh
60 cm equilateral triangle
Provision for Hectometer stone
Provision for Kilometer stone
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.42 MB
2Technicalbid.pdf
Tender Documents • 1.49 MB
2Pricebid.pdf
Additional Documents • 0.92 MB
BOQ_802751.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid