Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.9 LAdmitted-Finance | ₹41.9 L | L1 | Admitted-Finance |
| 2 | L2₹44.1 L+₹2.2 L (5.16%)Admitted-Finance | ₹44.1 L+₹2.2 L (5.16%) | L2 | Admitted-Finance |
| 3 | L3₹44.4 L+₹2.5 L (6.05%)Admitted-Finance | ₹44.4 L+₹2.5 L (6.05%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S S.K. CONTRACTOR AND SUPPLIER L3 | Neeraj Electricals L1 | M/S RUDRA CONTRACTOR AND SUPPLIER BAREPUR ANDHARRA HARDOI L2 |
|---|---|---|---|---|---|---|
| 1.00Supply and ererction of following Material | ||||||
| 2.00 | H/C with nut and bolt for top t-off droper channel | 253 | Kg. | 200 ₹50,600 Lowest | 291 ₹73,623 | 201 ₹50,853 |
| 3.00 | LT clamp with nut & bolt | 144 | Nos | 200 ₹28,800 Lowest | 281 ₹40,464 | 200 ₹28,800 Lowest |
| 4.00 | Allumunium lugs | 167 | Nos | 150 ₹25,050 | 128 ₹21,376 Lowest | 150 ₹25,050 |
| 5.00 | Distribution box 3 phase | 92 | Nos | 1,230 ₹1,13,160 Lowest | 1,282 ₹1,17,944 | 1,230 ₹1,13,160 Lowest |
| 6.00 | Distribution box clamp | 92 | Nos | 200 ₹18,400 Lowest | 274 ₹25,208 | 200 ₹18,400 Lowest |
| 7.00 | Dead end clamp | 51 | Nos | 200 ₹10,200 Lowest | 207 ₹10,557 | 200 ₹10,200 Lowest |
| 8.00 | LT Shackle Insulator | 137 | Nos | 50 ₹6,850 | 48 ₹6,576 Lowest | 51 ₹6,987 |
| 9.00 | Nut Bolt for shackle insulator | 49 | Kg. | 100 ₹4,900 Lowest | 135 ₹6,615 | 101 ₹4,949 |
| 10.00 | copper L piece | 88 | Nos | 1,000 ₹88,000 | 979 ₹86,152 Lowest | 1,000 ₹88,000 |
Tender Value
₹42.3 L
EMD Value
₹42,270
Closing Date
9 Jun 2026, 2:00 pmClosed
Electricity Distribution Circle hardoi
Asha nagar Hardoi
21/EDC(H)/2026-27
2026_MVVNL_1153533_1
21/EDC(H)/2026-27
Open Tender
Miscellaneous Works
Item Rate
90 days
EDC Asha Nagar Hardoi
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
A/C No. 066505005389, IFSC Code ICIC0000665
₹42,270
Electricity Distribution Circle hardoi
10 Jun 2026
25 May 2026
9 Jun 2026
25 May 2026
9 Jun 2026
25 May 2026
25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply and ererction of following Material | - | - | - | - |
| 2 | H/C with nut and bolt for top t-off droper channel | 253 | Kg. | - | - |
| 3 | LT clamp with nut & bolt | 144 | Nos | - | - |
| 4 | Allumunium lugs | 167 | Nos | - | - |
| 5 | Distribution box 3 phase | 92 | Nos | - | - |
| 6 | Distribution box clamp | 92 | Nos | - | - |
| 7 | Dead end clamp | 51 | Nos | - | - |
| 8 | LT Shackle Insulator | 137 | Nos | - | - |
| 9 | Nut Bolt for shackle insulator | 49 | Kg. | - | - |
| 10 | copper L piece | 88 | Nos | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
TD21.pdf
Tender Documents • 2.84 MB
BOQ_2160898.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .