Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.3 LAccepted-Finance | ₹24.3 L | L1 | Accepted-Finance OK |
| 2 | L2₹24.7 L+₹32,712.86 (1.34%)Accepted-Finance | ₹24.7 L+₹32,712.86 (1.34%) | L2 | Accepted-Finance OK |
Tender Value
₹25.0 L
EMD Value
₹49,940
Closing Date
17 Aug 2026, 9:00 amClosed
EXECUTIVE OFFICER
MUNICIPAL OFFICE, RIYANBADI
Construction of wbm road Natho Ki Dhani to Mehlo ki Dhani
2026_DLB_584169_1
03/2026-27
Open Tender
Civil Works
Percentage
RIYABADI
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EXECUTIVE OFFICER/MDRISL
₹49,940
Yes
17 Aug 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, includingdisposal of surplusmaterialwithall lift and lead up to 1000 metre as per MoRT & H specificationclause 301.In all type of soil | 379.35 | cum | 235.5 | ₹89,336.93 |
| 2 | Carriage of Materials by mechanical transport including loading, unloading and stacking : Earth lead upto 2 km | 379.35 | cum | 185.54 | ₹70,384.6 |
| 3 | Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) | 2,023.2 | cum | 178.5 | ₹3,61,141.2 |
| 4 | Carriage of Materials by mechanical transport including loading, unloading and stacking : Earth lead upto 2 km | 1,264.5 | cum | 40.64 | ₹51,389.28 |
| 5 | Carriage of Materials by mechanical transport including loading, unloading and stacking : Earth lead upto 2 km | 758.7 | cum | 239.12 | ₹1,81,420.34 |
| 6 | Providing laying, spreading and compacting stone aggregates of specific sizes as per Table 400-7 to Water Bound Macadam specification including spreading in uniform thickness; hand packing, rolling with power roller 8-10 tonnes, in stages to proper grade and camber, applying and brooming requisite type of screening (Table 400-8) binding materials to fill up the interstices of coarse aggregates, watering (with water browser) and compacting to required density, making necessary earthen bund to protect edges as per clause 404 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion complete.
Crusher broken - Grade-II (63-45mm) | 758.7 | cum | 2,298 | ₹17,43,492.6 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1037563.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
Tendernotice_2.pdf
PDF • 0.20 MB
Tendernotice_3.pdf
PDF • 16.22 MB
Tendernotice_4.pdf
PDF • 0.54 MB
Tendernotice_5.pdf
PDF • 0.19 MB
BOQ_1037563.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .