Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Finance | -15.15% | ₹1.5 L | L1 | Admitted-Finance |
| 2 | L2₹1.6 LAdmitted-Finance | -6.00% | ₹1.6 L | L2 | Admitted-Finance |
| 3 | L3₹1.7 LAdmitted-Finance | -5.00% | ₹1.7 L | L3 | Admitted-Finance |
| 4 | L4₹1.8 LAdmitted-Finance | +0.77% | ₹1.8 L | L4 | Admitted-Finance |
Tender Value
₹1.8 L
EMD Value
₹3,500
Closing Date
15 Apr 2026, 6:00 pmClosed
Executive Engineer PWD (RandB) Division Nagrota
Executive Engineer PWD (RandB) Division Nagrota
Construction of Girls Toilet at MS Chhibba PAB 2025-26 Zone Gandhi Nagar District Jammu (Under Samagra Shiksha). (3rd Call)
2026_PWDJK_307247_2
Short e-NIT No. 01 of 2026-2027/Nagrota Dated 02-04-2026
Open Tender
Civil Works
30 days
Executive Engineer PWD (RandB) Division Nagrota
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD (RandB) Division Nagrota
₹3,500
Yes
17 Apr 2026
4 Apr 2026
16 Apr 2026
4 Apr 2026
15 Apr 2026
4 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil | - | Cum | - | - |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | - | Cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | Kg | - | - |
| 6 | Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete | - | Sqm | - | - |
| 7 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | - | Cum | - | - |
| 8 | Extra for brick work with common burnt clay bricks/cement concrete bricks in
superstructure above plinth level upto floor five level | - | Cum | - | - |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | - | Sqm | - | - |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for: Suspended floors, roofs, landings, balconies and access platforms. | - | Sqm | - | - |
stage.html
html • 0.03 MB
techsummary_996947.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_996947.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid