Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.2 CrAccepted-AOC DHANI CHANDPUR TEHSIL AND DISTT REWARI HARYANA 123401 | REWARI | REWARI | HARYANA | 123401 | ₹4.2 Cr | 1 | Accepted-AOC Lowest |
| 2 | 2₹4.2 CrRejected-AOC VPO PATUWAS TEHSIL AND DISTT CHARKHI DADRI 127306 | CHARKI DADRI | HARYANA | 127306 | ₹4.2 Cr | 2 | Rejected-AOC Highest |
| 3 | 3₹4.2 CrRejected-AOC HOUSE NO 3123 66 WARD NO 23 SATI COLONY REWARI 123401 | REWARI | REWARI | HARYANA | 123401 | ₹4.2 Cr | 3 | Rejected-AOC Highest |
| Sl No | Description | Qty | Unit | Sachin Goyal L3 | Deepak Yadav Contractor L1 | AMARJEET SANWAL CONT L2 |
|---|---|---|---|---|---|---|
| 1.00 | Supply and Fixing of Dismantling Joints PN 1.6 complete in all respect. 100 mm i/d | 16 | No | 3,000 ₹48,000 | 2,800 ₹44,800 | 500 ₹8,000 |
| 2.00 | Supply and Fixing of Dismantling Joints PN 1.6 complete in all respect. 150 mm i/d | 14 | No | 4,000 ₹56,000 | 3,800 ₹53,200 | 700 ₹9,800 |
| 3.00 | Supply and Fixing of Dismantling Joints PN 1.6 complete in all respect. 200mm i/d | 10 | No | 5,000 ₹50,000 | 4,100 ₹41,000 | 1,000 ₹10,000 |
| 4.00 | Providing Fixing Led light of 9watt (Syska, Havells, Philips make) | 2 | Each | 500 ₹1,000 | 350 ₹700 | 100 ₹200 |
| 5.00 | Supplying, erection, testing and commissioning of horizontal motor pumping set for clear water having head 15.00m as per the indicated requirements of discharge in 2300 LPM and power capacity in BHP as per IS marked. | 2 | No | 2,00,000 ₹4 L | 2,90,000 ₹5.8 L | 1,00,000 ₹2 L |
| 6.00 | Providing and fixing of 100 watt led lights make havells complete in all respect as per derication of Engineerin- charge | 15 | No | 6,500 ₹97,500 | 4,500 ₹67,500 | 1,000 ₹15,000 |
| 7.00 | Operation and maintenance for the complete scope of work cover under this contract, as per Schedule of operation and maintenance attached in DNIT under additional documents, for a period of 3 years after 3 years deflect Lability period and 3 months Trial run Period. (the cost of will be charged against year wise A/mtc Estimate) Operation and maintenance during 1st year defect liability
period (Operation only) | 1 | No | 6,00,000 ₹6 L | 5,00,000 ₹5 L | 5,00,000 ₹5 L |
| 8.00 | Operation and maintenance for the complete scope of work cover under this contract, as per Schedule of operation and maintenance attached in DNIT under additional documents, for a period of 3 years after 3 years deflect Lability period and 3 months Trial run Period. (the cost of will be charged against year wise A/mtc Estimate) Operation and maintenance during 2nd year defect liability period (Operation only) | 1 | No | 6,50,000 ₹6.5 L | 5,00,000 ₹5 L | 6,00,000 ₹6 L |
| 9.00 | Operation and maintenance for the complete scope of work cover under this contract, as per Schedule of operation and maintenance attached in DNIT under additional documents, for a period of 3 years after 3 years deflect Lability period and 3 months Trial run Period. (the cost of will be charged against year wise A/mtc Estimate) Operation and maintenance during 3rd year defect liability period (Operation only) | 1 | No | 7,00,000 ₹7 L | 5,00,000 ₹5 L | 7,00,000 ₹7 L |
| 10.00 | Operation and maintenance for the complete scope of work cover under this contract, as per Schedule of operation and maintenance attached in DNIT under additional documents, for a period of 3 years after 3 years deflect Lability period and 3 months Trial run Period. (the cost of will be charged against year wise A/mtc Estimate) Operation and Maintenance during 4th year | 1 | No | 7,50,000 ₹7.5 L | 5,00,000 ₹5 L | 8,00,000 ₹8 L |
Tender Value
₹4.8 Cr
EMD Value
₹9.6 L
Closing Date
9 Apr 2026, 5:00 pmClosed
VINAY PRAKASH CHAUHAN
Rewari PHED No. 1
Construction of Add. 01 Nos S and S Tank, 01 nos CWT, 02 Nos FB, repair of Pump Chmaber, boundary Wall and lying of balance distribution system
2026_HRY_511788_1
2026B3BD8F3B F97F 44CF BBA0 D216FD1C01C0579PUH
Open Tender
Civil Works
300 days
ASAD PUR BALIAR KHURD FADANI JIT PURA ISTMURAR
2 documents required · 2 mandatory
₹15,000
₹9.6 L
Yes
2 Jun 2026
30 Mar 2026
10 Apr 2026
30 Mar 2026
9 Apr 2026
30 Mar 2026
30 Mar 2026 - 1 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Supply and Fixing of Dismantling Joints PN 1.6 complete in all respect. 100 mm i/d | |||||
| 2Supply and Fixing of Dismantling Joints PN 1.6 complete in all respect. 150 mm i/d | |||||
| 3Supply and Fixing of Dismantling Joints PN 1.6 complete in all respect. 200mm i/d | |||||
| 4Providing Fixing Led light of 9watt (Syska, Havells, Philips make) | |||||
| 5Supplying, erection, testing and commissioning of horizontal motor pumping set for clear water having head 15.00m as per the indicated requirements of discharge in 2300 LPM and power capacity in BHP as per IS marked. | |||||
| 6Providing and fixing of 100 watt led lights make havells complete in all respect as per derication of Engineerin- charge | |||||
| 7Operation and maintenance for the complete scope of work cover under this contract, as per Schedule of operation and maintenance attached in DNIT under additional documents, for a period of 3 years after 3 years deflect Lability period and 3 months Trial run Period. (the cost of will be charged against year wise A/mtc Estimate) Operation and maintenance during 1st year defect liability period (Operation only) | |||||
| 8Operation and maintenance for the complete scope of work cover under this contract, as per Schedule of operation and maintenance attached in DNIT under additional documents, for a period of 3 years after 3 years deflect Lability period and 3 months Trial run Period. (the cost of will be charged against year wise A/mtc Estimate) Operation and maintenance during 2nd year defect liability period (Operation only) | |||||
| 9Operation and maintenance for the complete scope of work cover under this contract, as per Schedule of operation and maintenance attached in DNIT under additional documents, for a period of 3 years after 3 years deflect Lability period and 3 months Trial run Period. (the cost of will be charged against year wise A/mtc Estimate) Operation and maintenance during 3rd year defect liability period (Operation only) | |||||
| 10Operation and maintenance for the complete scope of work cover under this contract, as per Schedule of operation and maintenance attached in DNIT under additional documents, for a period of 3 years after 3 years deflect Lability period and 3 months Trial run Period. (the cost of will be charged against year wise A/mtc Estimate) Operation and Maintenance during 4th year | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_590586.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid