Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance N 3 91 IRC VILLAGE NAYAPALLI BHUBANESWAR 751015 | BHUBANESWAR | KHORDHA | ODISHA | 751015 | Admitted-Finance |
| 2 | Admitted-Finance 8 C 1 SECTOR NO 21 MIHAN AREA NAGPUR | NAGPUR | NAGPUR | MAHARASHTRA | Admitted-Finance |
| 3 | Admitted-Finance UNIT NO 514 515 AND 516 5TH FLOOR SUNCITY SUCCESS TOWER GOLF COURSE EXTENSION ROAD GURGAON 122005 | GURGAON | GURGAON | HARYANA | 122005 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
16 Jan 2021, 5:00 pmClosed
Chief Engineer (World Bank Project), Odisha
O/o EIC (Civil), Odisha, Nirman Soudha Bhubaneswar
Construction of H.L. Bridge over River Subarnarekha at 36th km on Haldipada NH-16 to West Bengal border via Baliapal, Pantei and Chandaneswar in the district of Balasore in the state of Odisha under CRF
2020_EICCL_64702_1
CE-WBP(O)-18/2020-21
National Competitive Bid
Civil Works - Others
Item Rate
2372 days
In the District of Balasore
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹50,000
Yes
O/o EIC (Civil), Odisha, Nirman Soudha Bhubaneswar
24 May 2021
17 Dec 2020
22 Jan 2021
17 Dec 2020
16 Jan 2021
24 Dec 2020
17 Dec 2020 - 16 Jan 2021
24 Dec 2020
Amount
I. REMUNERATION FOR LOCAL PROFESSIONAL STAFF A.Key Personnel
Team leader cum Senior Bridge Construction Engineer 30 Man-month in Construction period 4 Man-month in Maintenance period
Sr. Bridge Design Engineer 6 Man-month in Construction period 0Man-month in Maintenance period
Resident Bridge Engineer 30 Man-month in Construction period 4 Man-month in Maintenance period
Senior Quality -cum- Material Engineer 9 Man-month in Construction period 0 Man-month in Maintenance period
Senior Geotechnical Engineer 9 Man-month in Construction period 0 Man-month in Maintenance period
Sr. Contract Specialist 5 Man-month in Construction period 1 Man-month in Maintenance period
B.Sub- Professional staff
Assistant Resident Engineer (Bridge) 30 Man-month in Construction period 12 Man-month in Maintenance period
Assistant Resident Engineer (Quality) 30 Man-month in Construction period 0 Man-month in Maintenance period
Quantity Surveyor 30 Man-month in Construction period 4 Man-month in Maintenance period
Survey Engineer 12 Man-month in Construction period 0 Man-month in Maintenance period
CADD Engineer 30 Man-month in Construction period 0 Man-month in Maintenance period
Lab Technician -1 30 Man-month in Construction period 0 Man-month in Maintenance period
Lab Technician -2 30 Man-month in Construction period 0 Man-month in Maintenance period
Asst. Highway Engineer 8 Man-month in Construction period 0 Man-month in Maintenance period
II. Support Staff
Office Manager-cum-Accountant
Computer Operator
Guard No. 1
Office Boy
III. Transportation (Fixed rate on rental basis)
The vehicles provided by the Consultants shall include the cost for rental, drivers operation, maintenance, repairs, insurance, etc. for all complete
Innova /Scorpio or equivalent (not more than 2 years old) During Construction period (1x30) During Maintenance period (0)
Bolero A/C or equivalent (not more than 2 years old) During Construction period (2 x 30) During Maintenance period (12)
IV. Office Rent (Fixed Costs)– Minimum 200 sqm carpet area of office shall be rented
The rent cost includes electricity and water charges, maintenance, Cleaning, repairs, etc. complete
Main Office (1 No) During Construction period (30 month)
Main Office (1 No) During Maintenance period (12 month)
V. Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies - During Construction
Office Supplies - During Maintenance
Drafting Supplies - During Construction
Drafting Supplies - During Maintenance
Computer Running Cost - During Construction
Computer Running Cost - During Maintennace
Communications - During Construction
Communications - During Maintenance
VI.Office Furniture and Equipment (Reimbursable)
Executive Table
Executive Chairs
Tables
Ordinary Chairs
Steel Shelving Cabinet
Multifunction Network Printer (A3) with Facsmile
Computer PC
Ink Jet Printers
VII. Reports and Document Printing
Monthly Reports (Design and Construction) (6 Copies for 30 Months)
Quarterly Reports (5 Copies for 10 Quarters)
Quarterly Reports during Maintenance (6 Copies each quantity for 16 Quarters)
VIII. Survey Equipment with Survey Party and Vehicle etc complete
Rental Cost towards survey equipment (GPS/ Total station/ Auto level) with semi skilled survey party (4 persons) and one dedicated vehicle for survey party (inclusive of vehicle rental driver 's salary, fuel operation and maintenance etc complete) with rods,flags and other sundries for a period of 3 days in a month
IX. Lump item
Study examination and ratification of survey data, hydrology and bridge hydraulics, with re-computation
MSV International Inc., USA
S.M. Consultants
K & J Projects Private Limited
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .