Tender Value
₹19.8 L
Closing Date
15 Feb 2021, 2:30 pmClosed
Executive Engineer (civil), ALHW, Rangat Bay
ALHW, Rangat Bay
Repair/re-laying of water supply line from Morice dera source to sump at ALHW office and distribution line in the ALHW Colony at Rangat Bay.
2021_ALHW_614116_1
EEC/RGT/RE-TEND-41/2020-21
Open Tender
Pipe Laying Works
Item Rate
60 days
Rangat Bay
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
Exempted
1 Apr 2021
5 Feb 2021
16 Feb 2021
5 Feb 2021
15 Feb 2021
8 Feb 2021
5 Feb 2021 - 7 Feb 2021
Amount
Dismantling G.I.Pipes from Morice dera to Sump at ALHW office Rangat Bay including excavation and refilling treaches after taking out the pipes, manually/by mechanical including stacking of pipes within 50 meters lead as per direction of Engineer -in -charge, including cost of all labour charges,transporation charges of all materials to worksite,cost of minor tools etc complete. The rate is inclusive of all consumable items and GST.
Re-fixing the G..I.Pipe from Morice dera source to sump at ALHW office Ranga Bay ,manually/by mechaniclal including cost of labour charges,transporation charges of all materials to workside , cost of minor tools etc complete. The rate is inclusive of all consumable items and GST.
Earth work excavation in foundation (excluding kankar, moorum, saturated soil and rock) lift upto 1.5 m stacking the excavated soil not more than 3 m clear from the edge of excavation and then returning the excavated soil in 150 mm layers by ramming , watering and then disposing of all surplus excavated soil as directed with in a lead of 50 m Including cost of labour charges, minor tools etc complete. The rate is inclusive of all consumable items and GST.
Providing and laying pulverised stone sand filling below the column foundation, plinth beams and floor etc, including cost of pulverised stone sand from the approved quarry at Panchawati, watering ramming, consolidation, transportaion charges of all materials to worksite, all labour charges, cost of minor tools etc complete. The rate is inclusive of all consumable items and GST.
Providing and laying PCC 1:3:6 (1 Cement, 3 pulverised sand and 06 graded stone aggregate 20mm nominal size) including cost of cement with (OPC Gr-43, IS 8112:1989), pulverised sand & stone chips, screening and washing of both the aggregates, mixing of concrete, conveying and placing the same, consolidation and curing, cost of all other materials, hire charges of mixer machine,vibrator, transportation charges of all materials to work site, all labour charges, cost of minor tools etc complete. The rate is inclusive of all consumable items and GST.
Providing and laying RCC 1:1.5:3 (1 Cement, 1.5 pulverised sand and 3 local stone chips 20 mm nominal size) for foundation, works as directed by the EIC, including cost of cement with (OPC Gr-43, IS 8112:1989), pulverised sand & local stone chips, screening and washing of both the aggregates, mixing of concrete, conveying and placing the same, consolidation and curing, cost of all other materials, hire charges of mixer machine,vibrator, transportation charges of all materials to work site, all labour charges, cost of minor tools etc complete. The rate is inclusive of all consumable items and GST.
Providing and fixing mild/cold twisted steel reinforcements for RCC works including cost of steel, cost of all labour charges, transportation charges of materilas to work site, cutting , bending, binding and placing in position and cost of binding wire, scaffolding charges etc complete. The rate is inclusive of all consumable items and GST.
Providing form work including centering and shuttering so as to give a rough finish, shuttering and proping etc (Height of proping and centering below supporting floor to ceiling not exceeding 4 m) and removal of the same in situ reinforcement Cement Concrete and plain concrete work using standard hard wood including cost of timber, all labour charges, nails, cost of minor tools etc complete. The rate is inclusive of all consumable items and GST.
Supply of USM for Area cleaning for water source in morice dera and dismantling & removing the old foundation, and excavating the earth wrk for new foundation. The rate is inclusive of all consumable items and GST.
Providing and fixing of G.I.Pipe complete with GI Fitting from Morice dera source to Sump at ALHW office Rangat Bay.including cost of pipe transportation charges of all materails to worksite all labour charges cost of minor tools etc complete. The rate is inclusive of all consumable items and GST.
G.I.Pipe 4" ø
G.I.Pipe 3" ø
G.I.Pipe 2½" ø
G.I.Pipe 2" ø
G.I.Pipe 1½" ø
Providing & fixing G.I.fitting of water supply line from Morice dera soure to Sump at ALHW office Rangat Bay to 0.00 km to 8.00 km including cost of G.I.fittungs, transportation charges of all materials to worksite all labour charges cost of minor tools etc complete. The rate is inclusive of all consumable items and GST.
Brass Gate Value 4"Ø
Brass Gate Value 3"Ø
Brass Gate Value 2½" Ø
Brass Gate Value 2"Ø
G.I.Union Socket 4"Ø
G.I.Union Socket 3"Ø
G.I.Union Socket 2½" Ø
G.I.Union Socket 2"Ø
G.I. Nipple 4"Ø
G.I.Nipple 3"Ø
G.I. Nipple 2½" Ø
G.I Nipple 2"Ø
G.I. Tee 4"Ø
G.I.Tee 3"Ø
G.I.Tee 2½" Ø
G.I.Tee 2" x 1" Ø
G.I. Bend 2"
With ready mixed red oxide zinc chromate yellow primer of approved brand and manufacture on steel galvanised iron / steel works.transportation charges of all materials to work site, all labour charges, cost of minor tools etc complete. The rate is inclusive of all consumable items and GST.
Painting 2 coats of anticorrosive bitumastic paint of approved brand and manufacture to give an even shade.transportation charges of all materials to work site, all labour charges, cost of minor tools etc complete. The rate is inclusive of all consumable items and GST.
liton paul
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .