Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
8 Jun 2023, 3:00 pmClosed
Executive Engineer, ED Budgam, KPDCL
ED Budgam, KPDCL
Annual Rate Contract for Carrying out various electrical maintenance works including SITC / ITC of various Line materials and 11/0.433 kV Distribution Substations
2023_PDD_213836_1
EDB/05 of 2023-24
Open Tender
Electrical and Maintenance Works
Turn-key
360 days
ED Budgam, KPDCL
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Yes
Executive Engineer, ED Budgam, KPDCL
₹20,000
28 Jun 2023
29 May 2023
10 Jun 2023
29 May 2023
8 Jun 2023
3 Jun 2023
29 May 2023 - 2 Jun 2023
Amount
Carraige upto site , erection,Testing and commisioning of 11/0.433KV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2 (Aluminium wound upto 200KVA, Copper wound for 250KVA or higher KVA ratings ). From divisional Stores.
Supply, Carraige upto site, installation, testing and Commissioning of Gapless Surge Arrestor 9 kV, 10 kA, LA with polymer housing, Stn. Type.
Carraige upto site, installation, testing and Commissioning of Gapless Surge Arrestor 9 kV, 10 kA, LA with polymer housing, Stn. Type.
Supply, Carraige upto site, installation, testing and Commissioning of 11 kV G.O Switch(200 Amp (vertical type), with fittings complete in all respects.
Carraige upto site, installation, testing and Commissioning of 11 kV G.O Switch(200 Amp) (vertical type), with fittings complete in all respects.
Supply, Carraige upto site, installation, testing and Commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A.
Carraige upto site, installation, testing and Commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A.
Supply, Carraige upto site, laying, stringing, tensioning, binding of 1.1 KV grade, 1-core (2Ckt) 300 Sqmm PVC Conductor FRLS type.
Supply, Carraige upto site, laying, stringing, tensioning, binding of 1.1 KV grade, 1-core 185 Sqmm PVC Conductor FRLS type.
Earthing of substation-Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239. GI Strip for neutral earthing of size 75 mmx10 mm & 50 mmx6 mm, for connection of transformer body & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
Supply, carriage, installation and commissioning of LT Fuse unit Complete as per REC standards/drawings available on KPDCL website.
Supply,Carraige upto site, fixing of Aluminium Thimbles of size 300 Sqmm.
Supply,Carraige upto site, fixing of Aluminium Thimbles of size 185 Sqmm.
Supply,Carraige upto site, fixing and Commissioning of Aluminium Solderless Clamps of size 300 Sqmm.
Supply,Carraige upto site, fixing and Commissioning of Aluminium Solderless Clamps of size 185 Sqmm.
Supply,Carraige upto site, Erection,testing and commisioning of Steel Tubular Poles of sizes complete with base plate(300x300x5mm), top cap, including digging of pit (1/6th of pole height) positioning etc, complete in all respect as per REC Standard.
13 m Long ( ST- 410 SP69)
11 m Long ( ST- 410 SP56)
9 m Long ( ST- 410 SP33)
8 m Long ( ST- 410 SP15)
Carraige from store upto site, Erection,testing and commisioning of Steel Tubular Poles of sizes complete with base plate(300x300x5mm), top cap, including digging of pit (1/6th of pole height) positioning etc, complete in all respect as per REC Standard.
13 m Long ( ST- 410 SP69)
11 m Long ( ST- 410 SP56)
9 m Long ( ST- 410 SP33)
8 m Long ( ST- 410 SP15)
8 m Long (PCC-WL200KG)
Supply,Carraige upto site, fixing and installation of GI V Cross-arm with top braket including clamps as per REC Standards/as per drawings available on KPDCL website.
Supply,Carraige upto site, fixing and installation of GI X-arm including clamps and braces as per REC Standards/ as per drawings available on KPDCL website.
Supply, Carraige upto site, laying, stringing, tensioning, binding of ACSR Conductor of sizes complete in all respects as per REC standards.
Carraige from store upto site, laying, stringing, tensioning, binding of ACSR Conductor of sizes complete in all respects as per REC standards
Supply, carriage and fixing of PG clamps Complete as per standards
Supply,Carraige upto site, fixing and installation of GI Mukhi Clamps for shackle insulators.
Supply, Carraige upto site, fixing and installation of 16kN porcelain shackle insulators.
Supply, Carraige upto site, installation,testing and Commissioning of 11 kV Disc Insulators (porcelain) Complete with fitting(45KN),complete in all respects as per REC standards.
Carraige from store upto site,Installation,testing and Commissioning of 11 kV Disc Insulators (porcelain) Complete with fitting(45KN),complete in all respects as per REC standards.
Supply, Carraige upto site,Carraige upto site,Installation,testing and Commissioning of 11 kV Disc Insulators (polymer) Complete with fitting(45KN),complete in all respects as per REC standards.
Supply, Carraige upto site,Installation,testing and Commissioning of 11 KV Pin Insulators (porcelain) with Pins (5KN),complete in all respects as per REC standards.
Supply, Carraige upto site,Installation,testing and Commissioning of 11 KV Pin Insulators (polymer) with Pins (5KN),complete in all respects as per REC standards.
Supply, Carraige upto site and installation of Danger Plates with Clamps.
Supply, Carraige upto site and installation of Anti Climbing devices
Carraige from store upto site and installation of Anti Climbing devices
Supply, carriage and installation of LT Line Spacers.
Earthing complete by GI pipe 40mm or GI rod 20 mm 2.5 mtr long through GI strip of Poles.
Painting of poles with Red oxide.
Painting of poles with Aluminiun paint.
Cement bottoming of S T poles in 1:2:4 mix as per REC standards 0.5 cum/pole/ as per drawings available on KPDCL website.
Supply, carriage and fixing of Aluminium Jointing Sleeves.
Supply, Carraige upto site,Installation,testing and Commissioning of Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2NO..), anchor plate (200x 200 x 6 mm), nut-bolts, 2 NO. turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete with all fittings as per REC Standards
Supply, Carraige upto site,laying ,stringing,tensioning , binding of 11 KV grade, 1-core ABC Type cable of sizes
Supply,Carraige upto site,Installation,testing and Commissioning of Heat shrinkable 1-core cable termination kit (indoor / outdoor type) of sizes.
Supply, Carraige upto site, laying, binding of 11 KV grade, 3-core XLPE, armoured, FRLS cable of sizes
Supply,Carraige upto site,Installation,testing and Commissioning of Heat shrinkable 3-core cable termination kit (indoor / outdoor type) of sizes
Supply,Carraige upto site,Installation,testing and Commissioning of LED Lights.
Supply, Carraige upto site,laying ,stringing,tensioning , binding of 1.1 KV grade, 4-core armoured FRLS Type cable of sizes
Supply, Carraige upto site,laying ,stringing,tensioning , binding of 1.1 KV grade, 4-core un armoured FRLS Type cable of sizes
Supply,Carraige upto site,Installation,testing and Commissioning of 11 Kv Heavy duty linksets as per REC standards.
400 Ampare
600 Ampare
Dismantling, safe packing and transportation to divisional stores of 11/0.433KV, 3-phase Distribution Transformers incuding unloading and staking.
Dismantling, safe packing and transportation to divisional stores of Gapless Surge Arrestor 9 kV, 10 kA, LA with polymer housing, Stn. Type incuding unloading and staking.
Dismantling, safe packing and transportation to divisional storesof 11 kV G.O Set (vertical type), with fittings,incuding unloading and staking.
Dismantling, safe packing and transportation to divisional stores of 11 kV Horn Gap Fuse Set 3 Phase 200A,incuding unloading and staking.
Dismantling, safe packing and transportation to divisional stores of 1.1 KV grade, cable of sizes,incuding unloading and staking.
Dismantling, safe packing and transportation to divisional storesof LT Fuse unit,incuding unloading and staking.
Dismantling, Removing, safe packing and transportation to divisional stores at Budgam from different sites ,old Steel Tubular Poles of sizes , top cap, cross arms, braces,insulators etc,incuding unloading and staking.
Dismantling, Removing, disposing off and dumping at suitable places/staking at stores as decided by the site engineer from different sites ,of old PCC Poles of sizes.
Dismantling, Removing, safe packing and transportation to divisional stores at Budgam from different sites ,of old wooden Poles of sizes, braces,insulators etc,incuding unloading and staking.
Dismantling, safe packing and transportation to divisional stores of ACSR conductor of sizes,incuding unloading and staking.
Dismantling, safe packing and transportation to divisional stores of old HT/LT cable of sizes,incuding unloading and staking.
Dismantling, safe packing and transportation to divisional stores of old/damaged 11 Kv linksets,incuding unloading and staking.
WULAR INFRASTRUCTURE PVT LTD
M/S NEW MIR ELECTRICALS WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .