| 1 | L1₹26.1 LAccepted-AOC | ₹26.1 L | L1 | Accepted-AOC Drawn the agreement |
| 2 | L1₹24.8 LRejected-AOC AT PO DEOGARH DIST DEOGARH 768108 | DEOGARH | DEOGARH | ODISHA | 768108 | ₹24.8 L | L1 | Rejected-AOC Unsuccessful |
| 3 | L1₹25.7 LRejected-AOC AT GUNDIAPALI P O RENGALBEDA PS REAMAL DIST DEOGARH | DEOGARH | DEOGARH | ODISHA | ₹25.7 L | L1 | Rejected-AOC Unsuccessful |
| 4 | L1₹25.9 LRejected-AOC | ₹25.9 L | L1 | Rejected-AOC Unsuccessful |
| 5 | L1₹26.1 LRejected-AOC AT WARD NO 08 PS PO KUCHINDA DIST SAMBALPUR PIN 768222 | KUCHINDA | SAMBALPUR | ODISHA | 768222 | ₹26.1 L | L1 | Rejected-AOC Unsuccessful |
Tender Value
₹30.7 L
EMD Value
₹30,655
Closing Date
30 Jan 2026, 5:00 pmClosed
SE RW Division Deogarh
O/o the SE RW Division Deogarh
Building work
2026_CERWI_124976_1
SERWDGH-Online-11 of 2025-26
Open Tender
Civil Works - Buildings
120 days
Deogarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
₹30,655
Yes
5 May 2026
22 Jan 2026
31 Jan 2026
22 Jan 2026
30 Jan 2026
22 Jan 2026
22 Jan 2026 - 29 Jan 2026
Brick work with Flyash bricks 25cm x 12cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±8 percent in cement mortar (1:6) with portland slag cement (PSC) immersing the bricks for minimum 6 hours in water before use with necessary projections, splays, cutting, circular moulding, corbelling etc. including cost, conveyance, taxes, royalties, loading and unloading of all materials and all labour for scaffolding, watering and curing, sundries, T&P etc complete as per direction of the Engineer-in-charge as per approved specification.
First Floor
Second Floor
Providing, lifting, hoisting and laying RCC of M25 grade design mix using portland slag cement as per IS:455 as per the drawing with 20mm aggregate (downgraded conforming to IS: 383) of hard crusher broken granite aggregate of approved quality from approved quarry including weigh batching, mixing in approved mechanical concrete mixers and compacting to proper shape and size level and plumbs and finishing the exposed surface smooth, scaffolding watering and curing for the required period as per direction of the Engineer-in-charge including cost of all materials with taxes royalities, transportation, loading and unloading, all labour sundries T&P etc. including cost of material and labour and centering, shuttering etc complete including providing strong rigid and levelled Steel centering and shuttering to required shape and size for all kinds of RCC works mentioned in different items with approved centering and shuttering materials with all necessary bracing ties and supports with level centering covered with bituminous paper including provision of necessary holes and pockets electrical conduct pipe, PH pipes fan hooks or boxes, switch and board insert plates, clamps and extension bars etc. as per the direction of the Engineer-in-charge and dismantling and removing after the required time from the date of casting, including cost of all materials with transportation, taxes, loading and unloading etc. and all labour, sundries, T&P scaffolding etc complete as per direction of the Engineer-in-charge as per approved specification For finished item of the works excluding reinforcement..
First Floor
Columns Upto Roof Level
Lintel
RCC Chajja
RCC Roof Beam
RCC Roof Slab,
Second Floor
Columns Upto Mumty Level
Supplying reinforcement of required diameter and approved quality for the RCC items with reinforcement for concrete work shall be Fe 500 conforming to IS 1786 and strictly to the latest Indian Standards including straightening, cutting to sizes, bending and binding the grills, lifting and placing in position as per design complete including cost of bars, binding wires for binding reinforcement which shall be soft & of annealed mild steel of 16 SWG and shall conform to IS 280: all labour, sundries, T&P and scaffolding (linear measurement of reinforcement only will be taken and quantity will be calculated on standard weight) for all heights etc complete as per direction of the Engineer-in-charge as per approved specification
First Floor
Second Floor
Fixing Ceramic tiles in floors of size (300 x 300)mm on 25 mm thick bed of cement mortar 1:1 jointed with neat white cement slurry mixed with pigment to match the shades of the tiles including rubbing polishing ,cost of tiles as per director of Engineer-in-charge.
First Floor
Fixing Ceramic tiles in Wall & dadoo on 12mm thick Cement Plaster in Cement mortar (1:3) jointed with neat cement Slurry mixed with Pigments including cost of Tiles, labour, T&P etc as per director of Engineer-in-charge.
First Floor
Providing 12mm thick cement plaster with cement mortar (1:6) using portland slag cement (IS 455) to outside surface of brick masonry walls including raking out joints to a depth of 12mm, scrapping and cleaning the surface and finishing the plastered surface smooth to proper plumbs and level as per direction of the Engineer-in-charge including cost of all materials, conveyance loading and unloading, all taxes and royalties, all labour for scaffolding, watering and curing, sundries and T&P etc complete as per direction of the Engineer-in-charge as per approved specification.
First Floor
Second Floor
16mm thick cement plaster on the rough side of brick masonry wall with cement mortar of mix (1:6) using portland slag cement (IS 455) with including raking out joints upto a depth of 12mm, scraping and cleaning the surface and finishing the plastered surface smooth to proper plumbs and level as per direction of the Engineer-in-charge including cost of all materials, conveyance, loading and unloading, all taxes and royalities, all labour for scaffolding, watering and curing, sundries and T&P etc complete as per direction of the Engineer-in-charge as per approved specification.
First Floor
Second Floor
Providing 20mm thick Grading plaster with cement mortar of mix (1:4) with portland slag cement (IS 455) over roof slab including cost of all materials, conveyance, taxes and royalties, scaffolding, watering and curing, sundries and T&P etc complete as per direction of the Engineer-in-charge as per approved specification.
First Floor
Second Floor
Providing Finished wall surface of walls with ACRYLIC Wall Putty ( water based ) of approved make and finished smooth and Even surface to receive painting including cost of materials, labour, T&P all comp.
First Floor
Providing and Painting wall Surface one coat with wall Primer to give an even shed before applying distemper including cost of all materials with taxes, all labour, scaffoldings, sundries T&P etc complete as per direction of the Engineer-in-charge as per approved specification.
First Floor
Second Floor
Providing and Painting Finished wall surface with Weather Coat Paint two coats of approved shed including cost of paint, labour, T&P all comp.
First Floor
Second Floor
Distempering two coats to inside walls with approved make distemper of approved shed on new work to give an even shed including cost of all materials with taxes, all labour, scaffoldings, sundries T&P etc complete as per direction of the Engineer-in-charge as per approved specification.
First Floor
Supplying, Fitting &Fixing Up Window Sliding Type madeup from Aluminium Section 151-154,151-155 as windows frame section no-151-155,151-153,151-167 as Shutter Frame fitted with 5mm thick Black Glass as penal fitted as per specifications.
Al. Frame
First Floor
Providing 5mm thick Plain glass
First Floor
Providing fitting and fixing Al. Door with OEL anodized Aluminium door section of 9202 as Vertical member , 9201 as top member and 9200 as bottom & middle member with fixing of 6mm thick Plain glass in top portion and 12mm thick Prelaminated board in bottom portion fixed on door frame by means of clip no-4660 as per Specifications all comp.
AI Frame
First Floor
Providing 5mm thick Plain glass
First Floor
Providing A.C.P Sheet
First Floor
Providing, fitting, fixing up partition walling OEL aluminium anodized section No. 9210 and 9207 as single groove and double groove respectively as horizontal and vertical member and OEL section 4660 as Tapered clip for fixing up 12mm thick B.W.R ply board and jointing angle No. 1855 including all fitting ,cost of all materials, taxes, labour, T&P etc. complete.
Al. Frame
First Floor
Providing 5mm thick Plain glass
First Floor
Providing A.C.P Sheet
First Floor
Supplying, fitting and fixing of M.S. grill with cost, conveyance of all materials, labour, T&P etc. required for the complete in all respect.
First Floor
Painting two coats with approved paint on new Iron work over coat of primer etc. Enalmel paint including cost of all materials with taxes, all labour, scaffoldings, sundries T&P etc complete as per direction of the Engineer-in-charge as per approved specification.
First Floor
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
Tendernotice_2.pdf
PDF • 2.00 MB
BOQ_577385.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid