Loading…
Loading…
Tender Value
₹78,500
EMD Value
₹1,570
Closing Date
17 Sept 2026, 6:55 pm
Executive Engineer REW Pulwama
Executive Engineer REW Pulwama
RDDDC2627110237 CO CSC AT MASJID SHARIEF BONPORA HDPORA
2026_RDPR_320574_83
e- NIT No. 93/2026-27 Dated 11-08-2026
Open Tender
Civil Works
Percentage
Pulwama
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Pulwama
₹1,570
12 Aug 2026
12 Aug 2026
18 Sept 2026
12 Aug 2026
17 Sept 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by manual means over areas (exceeding 30 cm in\depth, 1.5 m in width as well as 10 m2 on plan)including disposal of excavated earthlead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 2.6.1 All kinds of soil : | 0.88 | cum | - | - |
| 0.0 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | 6.58 | cum | - | - |
| 0.0 | p/laying of St soling dully hand packed i/c all carriages | 1.43 | cum | - | - |
| 0.0 | P/L in position cement conc. of grade 1:4:8 (1 cement : 4 fine sand : 8 Nallah graded stone agg 40 mm N/s) excl. cost of centering & shuttering in all work upto plinth level | 0.06 | cum | 1 | ₹0.06 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: ( 1:3:6 ) mix | 0.96 | cum | - | - |
| 0.0 | Brick work in factry made hollow block bricks bricks of class designation 75 in foundation & plinth in cement mortar 1:6 (1 Cement : 6 coarse sand) | 1.83 | cum | - | - |
| 0.0 | Extra for B/W above Plinth Level upto Floor V Level | 1.83 | cum | - | - |
| 0.0 | Centering and Shuttering I/c Strutting, Propping etc & removal of formwork for roof. | 8.4 | sqm | - | - |
| 0.0 | centering & shuttering i/c strutting & removal of formwork | 2.42 | SQM | - | - |
| 0.0 | centering & shuttering i/c strutting & removal of formwork | 6.3 | SQM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_1066101.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].