Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L4₹10.4 Cr+₹1.5 Cr (16.4%)Accepted-AOC | L4 | Accepted-AOC For being most eligible | |
| 2 | L1₹8.9 CrRejected-AOC | L1 | Rejected-AOC Not eligible | |
| 3 | L2₹10.3 Cr+₹1.3 Cr (14.6%)Rejected-AOC | L2 | Rejected-AOC Not eligible | |
| 4 | L3₹10.3 Cr+₹1.3 Cr (14.7%)Rejected-AOC | L3 | Rejected-AOC Not eligible |
| Sl No | Description | Qty | Unit | M/S TNT ENTERPRISES L4 | M/S TSERING DHONDUP L2 | M/S ALLIANCE TRADING CO L1 | M/S MONYUL ENTERPRISES L3 |
|---|---|---|---|---|---|---|---|
| 1.00SH:- Building Work (Office Building with Type-IV=1No, Type-III Qtr=4Nos, Type-II Qtr=5Nos, Boiler room=3Nos & Battery room=3Nos) | |||||||
| 1.01 | Earth work in excavation in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) including banking in 20 cm layers and breaking clods, ramming and dressing up for the purpose of making embankments or filling up ground depressions, lead upto 50 m and lift upto 1.50 m. | 3,748.95 | Cum | 200 ₹7,49,790 | 185 ₹6,93,555.75 | 165 ₹6,18,576.75 Lowest | 189.26 ₹7,09,526.28 |
| 1.02 | Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m. | 1,238.15 | Cum | 340 ₹4,20,971 | 325 ₹4,02,398.75 | 286 ₹3,54,110.9 Lowest | 328.29 ₹4,06,472.26 |
| 1.03 | Re-filling excavated earth in foundations and plinth etc. in 15 cm layer including ramming and watering etc. complete. | 723.65 | Cum | 176 ₹1,27,362.4 | 174 ₹1,25,915.1 | 152 ₹1,09,994.8 Lowest | 174.28 ₹1,26,117.72 |
| 1.04 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. | 67.35 | Cum | 3,411 ₹2,29,730.85 | 3,374 ₹2,27,238.9 | 2,940 ₹1,98,009 Lowest | 3,375.34 ₹2,27,329.15 |
| 1.05 | Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. | 175.42 | Cum | 8,465 ₹14,84,930.3 | 8,374 ₹14,68,967.08 | 7,295 ₹12,79,688.9 Lowest | 8,375.12 ₹14,69,163.55 |
| 1.06 | Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) excluding the cost of centring an shuttering in: | 33 | Cum | 9,380 ₹3,09,540 | 9,280.66 ₹3,06,261.78 | 8,083 ₹2,66,739 Lowest | 9,280.66 ₹3,06,261.78 |
| 1.07 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in over and including 50mm thick compacted bed of coarse sand, filling the joints required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. | 407.13 | Sqm | 4,559 ₹18,56,105.67 | 4,510 ₹18,36,156.3 | 3,929 ₹15,99,613.77 Lowest | 4,510.5 ₹18,36,359.87 |
| 1.08 | Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in :
a) M25 (1 cement : 1 coarse sand : 2 stone aggregate 20 mm
nominal size). | 191.17 | Cum | 15,118 ₹28,90,108.06 | 14,950 ₹28,57,991.5 | 13,028 ₹24,90,562.76 Lowest | 14,957 ₹28,59,329.69 |
| 1.09 | Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in :
a) M25 (1 cement : 1 coarse sand : 2 stone aggregate 20 mm
nominal size). | 64.99 | Cum | 15,209 ₹9,88,432.91 | 15,000 ₹9,74,850 | 13,106 ₹8,51,758.94 Lowest | 15,047 ₹9,77,904.53 |
Tender Value
₹11.0 Cr
EMD Value
₹11.0 L
Closing Date
27 Jan 2025, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer Tawang Division PWD
Office of the Executive Engineer Tawang Division PWD AP
Construction of OCR Building and Residential building at Tawang under SIB Itanagar.
2025_PWDAP_2049_1
TWD/DB-2/2024-25/01
Open Tender
Civil Works - Building
Item Rate
548 days
Tawang
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
Executive Engineer Tawang Division PWD
₹11.0 L
SE Tawang PWD AP, Lhou.
24 Feb 2025
20 Jan 2025
27 Jan 2025
20 Jan 2025
27 Jan 2025
20 Jan 2025
23 Jan 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SH:- Building Work (Office Building with Type-IV=1No, Type-III Qtr=4Nos, Type-II Qtr=5Nos, Boiler room=3Nos & Battery room=3Nos) | |||||
| 1.01 | Earth work in excavation in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) including banking in 20 cm layers and breaking clods, ramming and dressing up for the purpose of making embankments or filling up ground depressions, lead upto 50 m and lift upto 1.50 m. | 3,748.95 | Cum | 1.25 | ₹4,686.19 |
| 1.02 | Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m. | 1,238.15 | Cum | - | - |
| 1.03 | Re-filling excavated earth in foundations and plinth etc. in 15 cm layer including ramming and watering etc. complete. | 723.65 | Cum | 100 | ₹72,365 |
| 1.04 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. | 67.35 | Cum | 53 | ₹3,569.55 |
| 1.05 | Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. | 175.42 | Cum | 10 | ₹1,754.2 |
| 1.06 | Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) excluding the cost of centring an shuttering in: | 33 | Cum | 11 | ₹363 |
| 1.07 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in over and including 50mm thick compacted bed of coarse sand, filling the joints required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. | 407.13 | Sqm | 1.25 | ₹508.91 |
| 1.08 | Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in :
a) M25 (1 cement : 1 coarse sand : 2 stone aggregate 20 mm
nominal size). | 191.17 | Cum | - | - |
| 1.09 | Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in :
a) M25 (1 cement : 1 coarse sand : 2 stone aggregate 20 mm
nominal size). | 64.99 | Cum | 100 | ₹6,499 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_2206.xls
BOQ • 0.47 MB
161246575.pdf
Tender Documents • 0.23 MB
161246577.html
Tender Documents • 0.06 MB
TD.pdf
Tender Documents • 6.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .