Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | SINGLE₹3.5 LAccepted-AOC 001 00 BANK COLONY SHIVPURI SHIVPURI MADHYA PRADESH 473551 | SHIVPURI | MADHYA PRADESH | 473551 | SINGLE | Accepted-AOC AWARD OF WORK TO SINGLE BIDDER |
Tender Value
₹5.6 L
EMD Value
₹7,000
Closing Date
18 Jul 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GENERAL MANAGER EXCAVATION
NCL KHADIA PROJECT, SHAKTINAGAR, SONEBHADRA, U.P.
Repairing of 03 No. bucket Sl. No. 4, 5 and 7 of 20 Cubic Meter 20 / 90 Dragline of Khadia Project
2022_NCL_248256_1
KHD/G.M. (Excv)/E-Tender/22-23/306
Open Tender
Excavation Department Work
Item Rate
90 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹7,000
15 Sept 2022
28 Jun 2022
19 Jul 2022
28 Jun 2022
18 Jul 2022
29 Jun 2022
28 Jun 2022 - 6 Jul 2022
Amount
Scope of Work for Bucket No. Sl. No. 4 of 20/90 Dragline : 1. Dismantling of accessories like clamp, socket, tie rod, drag socket, drag ring etc.. 2. Cutting of 2 no. old I pin & fork and removal. 3. Fitment of 2 no. new I pin & fork, welding and hard facing. 4. Repairing of R1, R2, R5 Adopters. 5. Grinding, Cleaning and gauging of bucket. 6. Cutting, grinding of steel strips in different size from old / scrap steel materials. 7. Chain & fittings joining of padding material in bucket. 8. Gauging and re-building of tooth adopter, trunnion. 9. Gauging, shaping of rib, fork and rebuilding work. 10. Joining of cracks and hard facing of buckets.
Labour Charges for removal of 02 Nos. old worn out I pin & fork and fitment of new one of bucket Sl. No. 4 as per scope of work Note : It includes Group of 1 No. Skilled Welder and 1 No. skilled fitter and 1 No. un-skilled manpower per day in 2 shift for 5 days.
Labour Charges for repairing of torn apart and fallen R1, R2 & R5 adopters of bucket Sl. No. 4 as per scope of work. Note : It includes Group of 1 No. Skilled Welder and 1 No. skilled fitter per day in 2 shift for 3 days.
Labour Charges for repairing the body of Bucket with fastening of padding material and hard facing of bucket Sl. No. 4 as per scope of work. Note : It includes Group of 2 No. Skilled Welder, 1 No. skilled fitter and 1 No. unskilled manpower per day in 2 shift for 18 days.
Hiring Charges for repairing of Bucket Sl. No. 4 as per scope of work
Welding machine - 02 No. for max period of 18 days and 01 No. for max period of 08 days
Grinder Heavy Duty - 02 No. for a Max Period of 26 days
Cost of Grinding Wheel
Scope of Work for Bucket Sl. No. 5 of 20/90 Dragline. : 1. Dismantling of accessories like clamp, socket, tie rod, drag socket, drag ring etc.. 2. Cutting of broken trunion on both side and removal. 3. Fitment of new trunion by gouging, welding and hard facing. 4. Cutting of adopter from scrap bucket, aligning and welding it with bucket at L1 place. 5. Grinding, Cleaning and gauging of bucket. 6. Cutting, grinding of steel strips in different size from old / scrap steel materials. 7. Chain & fittings joining of padding material in bucket. 8. Gauging and re-building of tooth adopter, trunnion etc. 9. Gauging, shaping of rib, fork and rebuilding work. 10. Joining of cracks and hard facing of buckets.
Labour Charges for removal of old trunnion and fitment of new trunnion on both side of bucket Sl. No. 5 as per scope of work Note : It includes Group of 1 No. Skilled Welder and 1 No. skilled fitter and 1 No. un-skilled manpower per day in 2 shift for 6 days.
Labour Charges for repairing of worn out and fallen L1 adopter of bucket Sl. No. 5 as per scope of work Note : It includes Group of 1 No. Skilled Welder & 1 No. skilled fitter per day in 2 shift for 5 days.
Labour Charges for repairing the body of Bucket with fastening of padding material and hard facing of bucket Sl. No. 5 as per scope of work Note : It includes Group of 2 No. Skilled Welder, 1 No. skilled fitter and 1 No. unskilled manpower per day in 2 shift for 18 days.
Hiring Charges for repairing of Bucket Sl. No. 5 as per scope of work
Welding machine - 02 No. for max period of 18 days and 01 No. for max period of 11 days
Grinder Heavy Duty - 02 No. for a Max Period of 29 days
Cost of Grinding Wheel
Scope of Work Bucket Sl. No. 7 of 20/90 Dragline : 1. Dismantling of accessories like clamp, socket, tie rod, drag socket, drag ring etc.. 2. Cutting of broken trunion (L.H.S.) and removal. 3. Fitment of new trunion by gouging, welding and hard facing. 4. Cutting of base plate and adopter from scrap bucket, aligning and welding it with bucket at L1 place and around. 5. Grinding, Cleaning and gauging of bucket. 6. Cutting, grinding of steel strips in different size from old / scrap steel materials. 7. Chain & fittings joining of padding material in bucket. 8. Gauging and re-building of tooth adopter, trunnion etc. 9. Gauging, shaping of rib, fork and rebuilding work. 10. Joining of cracks and hard facing of buckets.
Labour Charges for removal of old trunnion L.H.S.) and fitment of new trunnion of bucket Sl. No. 7 as per scope of work Note : It includes Group of 1 Nos. Skilled Welder, 1 Nos. skilled fitter & 1 No. unskilled manpower per day in 2 shift for 3 days.
Labour Charges for repairing of torn apart and fallen L1 adopter and base plate of bucket Sl. No. 7 as per scope of work Note : It includes Group of 1 Nos. Skilled Welder & 1 Nos. skilled fitter per day in 2 shift for 7 days.
Labour Charges for repairing the body of Bucket with fastening of padding material and hard facing of bucket Sl. No. 7 as per scope of work Note : It includes Group of 2 Nos. Skilled Welder, 1 Nos. skilled fitter & 1 No. unskilled manpower per day in 2 shift for 18 days.
Hiring Charges for repairing of Bucket Sl. No. 7 as per scope of work
Welding machine - 02 No. for max period of 18 days and 01 No. for max period of 10 days
Grinder Heavy Duty - 02 No. for a Max Period of 28 days
Cost of Grinding Wheel
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
techsummary_256477.pdf
PDF • 0.10 MB
finsummary_256477.pdf
PDF • 0.10 MB
scan0353.pdf
PDF • 1.46 MB
finance_256477.pdf
PDF • 0.10 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .