Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAccepted-AOC | ₹5.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.6 L+₹12,847.84 (2.37%)Rejected-Finance | ₹5.6 L+₹12,847.84 (2.37%) | L2 | Rejected-Finance Second less |
| 3 | L3₹5.6 L+₹12,954.04 (2.39%)Rejected-Finance | ₹5.6 L+₹12,954.04 (2.39%) | L3 | Rejected-Finance Third Less |
| 4 | L4₹5.8 L+₹32,804 (6.04%)Rejected-Finance D NO 6 41 SREE THIRUMALAI ILLAM UPPER BAZAAR OOTY | ERODE | TAMIL NADU | 638451 | ₹5.8 L+₹32,804 (6.04%) | L4 | Rejected-Finance Fourth less |
| 5 | L5₹5.8 L+₹41,862.86 (7.71%)Rejected-Finance D NO 7 267 YELLANALLI KETTI PO | DHARMAPURI | TAMIL NADU | 635106 | ₹5.8 L+₹41,862.86 (7.71%) | L5 | Rejected-Finance Fifth Less |
| Sl No | Description | Qty | Unit | dhamodharan L5 | ravi L4 | JAYA TRADERS L3 | SRI LAKSHMI CONSTRUCTIONS L1 | MPANDCO L6 | ANBUMANI L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Providing New CC Drainage at New street permuchi colony H/O Perumuchi panchayat(120m) | |||||||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundasan | 72 | cum | 263.78 ₹18,992 | 255 ₹18,360 | 240 ₹17,280 | 263.78 ₹18,992 | 263.78 ₹18,992 | 220 ₹15,840 Lowest |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 12 | cum | 5,818.53 ₹69,822 | 5,700 ₹68,400 | 5,400 ₹64,800 Lowest | 5,818.53 ₹69,822 | 5,818.53 ₹69,822 | 5,818.53 ₹69,822 |
| 4.00 | Cement Concrete 1:3:6 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 33.12 | M2 | 6,571.17 ₹2,17,637 | 6,500 ₹2,15,280 | 6,300 ₹2,08,656 | 5,500 ₹1,82,160 Lowest | 6,571.17 ₹2,17,637 | 6,250 ₹2,07,000 |
| 5.00 | Supply and erecting of centering including cost and conveyance of all materials to work site and all labaour charges etc complete | 288 | cum | 547.5 ₹1,57,680 | 540 ₹1,55,520 | 517 ₹1,48,896 | 547.5 ₹1,57,680 | 610 ₹1,75,680 | 510 ₹1,46,880 Lowest |
| 6.00 | Plastering with CM 1:4 mix using 20mmTK including cost and conveyance and all labour charges etc | 54 | cum | 585.48 ₹31,616 | 565 ₹30,510 Lowest | 585.48 ₹31,616 | 585.48 ₹31,616 | 610 ₹32,940 | 585.48 ₹31,616 |
| 7.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 89,234.46 ₹89,234.46 | 87,852.6 ₹87,852.6 | 84,824.64 ₹84,824.64 | 82,848.6 ₹82,848.6 Lowest | 92,712.78 ₹92,712.78 | 84,808.44 ₹84,808.44 |
Tender Value
₹5.9 L
EMD Value
₹5,920
Closing Date
26 Feb 2026, 3:00 pmClosed
BDO VP AKM
Panchayat Union Arakkonam
Providing New CC Drainage at New street permuchi colony H/O Perumuchi panchayat(120m)
2026_RDTN_666091_1
AA1/2826/2025
Open Tender
Civil Works
Item Rate
180 days
Panchayat Union Arakkonam
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹5,920
Yes
18 Aug 2026
25 Feb 2026
26 Feb 2026
25 Feb 2026
26 Feb 2026
25 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing New CC Drainage at New street permuchi colony H/O Perumuchi panchayat(120m) | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundasan | 72 | cum | 263.78 | ₹18,992.16 |
| 3 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 12 | cum | 5,818.53 | ₹69,822.36 |
| 4 | Cement Concrete 1:3:6 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 33.12 | M2 | 6,571.17 | ₹2,17,637.15 |
| 5 | Supply and erecting of centering including cost and conveyance of all materials to work site and all labaour charges etc complete | 288 | cum | 547.5 | ₹1,57,680 |
| 6 | Plastering with CM 1:4 mix using 20mmTK including cost and conveyance and all labour charges etc | 54 | cum | 585.48 | ₹31,615.92 |
| 7 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | - | GST Amount | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.25 MB
BOQ_800089.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .