| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹5.8 L+₹26,748.01 (4.86%)Rejected-Finance GOVT CONTRACTOR VPO DHASOLI TEHSIL JAWALI DISTT KANGRA H P | KANGRA | HIMACHAL PRADESH | 175013 | L2 | Rejected-Finance Second lowest bidder | |
| 3 | L3₹5.8 L+₹32,678.62 (5.93%)Rejected-Finance NOT AVAILABLE | L3 | Rejected-Finance Third lowest bidder | |
| 4 | L4₹6.0 L+₹49,754.35 (9.04%)Rejected-Finance BASSI UNDER BASSI POWER HOUSE DIVISION HPSEBL JOGINDER NAGAR | SHIMLA | HIMACHAL PRADESH | 171001 | L4 | Rejected-Finance Fourth lowest bidder | |
| 5 | L5₹6.2 L+₹66,228.39 (12.0%)Rejected-Finance | L5 | Rejected-Finance Fifth lowest bidder |
Tender Value
₹5.3 L
EMD Value
₹10,600
Closing Date
5 May 2021, 5:00 pmClosed
Executive Engineer
HPSIDC Ltd. Shimla
Construction of Boundary wall and approach road to pump house Phase-III at Ind. Area Tahliwala Distt. Una (HP).
2021_SIDC_46948_1
Job No. 14
Open Tender
Civil Works
Item Rate
90 days
Tahliwala (Una)
Please refer Tender documents.
9 documents required · 9 mandatory
₹600
₹10,600
11 Aug 2021
28 Apr 2021
6 May 2021
28 Apr 2021
5 May 2021
28 Apr 2021
Amount
Excavation in soil in Hilly Area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with in all leads and lifts as per Technical Specification Clause 1603. At dumping site (To be arranged by the contractor) including payment of MC/ local body dumping charges if lived any as per satisfaction of Engineer-in-charge through all modes of transportation including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required). Any loss to the public and private propriety during the course of execution and disposal of serviceable and unserviceable materials shall be absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges.
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal witn in all leads , dressing of sides and bottom and backfilling in trenches with excavated suitable material including curing and carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge.
Providing and Laying concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 1:6:12 (1 Cement:6 Sand : 12 Crushed graded aggregates 40mm nominal dia ) including cost of formwork including curing and carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge.
Providing and Laying concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 1:4:8 (1 cement : 4 sand : 8 Graded stone aggregate 25mm nominal size) including curing and carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge.
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Granular Materialincluding curing and carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge.
Providing weapholes in brick masonry / stone masonry /plain reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full with of the structures with slope of 1(v):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7 including curing and carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge.
Brick work using common burnt clay building bricks in foundation and plinth in Cement Mortar 1:6 (1 Cement : 6 Sand) First Class Bricks including curing and carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge.
Brick work using common burnt clay building bricks in Superstructure in Cement Mortar 1:6 (1 Cement : 6 Sand) First Class Bricks including curing and carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge.
Providing form work with steel plates (3.15mm) three point fifteen milimetre thick welded with angle iron in frame (30x30x5mm) ( Thirty x thirty x five milimetre) so as to give a fair finish including centering, shuttering, strutting and propping etc., with wooden battens and ballies, height of propping and centering below supporting floor to ceiling not exceeding 4mtr.(Four metre) including carriage of materials upto all leads and lifts. (a). Beams, cantilever, girders and lintels sides and soffits of beams, beam haunchings, cantilevers, bressumers and lintels not exceeding 1 Mtr. in depth in all heights from floor.
(b) vertical surfaces such as walls (any thickness) partitions and the like including attached pillasters butteresses, plinth and string courses and the like.
Providing and laying cement concrete 1:1.5:3 (One cement : one point five sand :Three graded stone aggregate 20mm nominal size)( Twenty milimetre) and curing complete, mixing the material in mechanical mixture and compacting the concrete with viberator complete excluding cost of form work and reinforcement for reinforced concrete work including carriage of materials upto all leads and lifts and as per the direction of Engineer-in-Charge. (a) Suspended floors, roofs, landings and shelves and their support balconies, beams, girders, bressumers and cantilevers in all floor levels.
Providing mild steel/tor steel reinforcement for reinforced cement concrete work including bending, binding and placing in position complete in all floor levels (a). Tor steel. including carriage of materials upto all leads and lifts and as per the direction of Engineer-in-Charge.
15mm (fifteen milimetres) thick cement plasters in single coat on rough side of brick/concrete/stone walls for interior/exterior plastering upto all floor level including arises, internal rounded angles, chamfers and or rounded angles not exceeding 80mm (Eighty milimetres) in girth and finished even and smooth with cement mortar 1:6 (one cement: six sand) including carriage of materials within all leads and lifts and as per the direction of Engineer-in-Charge.
Applying Birla white wall care putty over plaster surface after thoroughly brushing the surface free from mortar drops, dust, loose materials and other foreign matters sand papered smooth to give final matter finish to the surface complete including carriage of materials within all leads and lifts
Applying priming coat over new concrete/masonry/asbestos cement/plastered surfaces after and including prepairing the surface by thoroughly cleaning oil grease, dirt and other foreign matters sand papered knotting Ready mixed primer including carriage of materials, labour, tool and plant through all modes of transportion within all leads and lifts and as per direction of Engineer-in- Charge.
Finishing wall with water proofing cement paint of approved brand and manufacture and of required shade on undecorated wall surfaces(two coats)to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials. including curing and carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge.
Providing and laying upto floor two level cement concrete 1:2:4 (1 cement : 2 Sand : 4 graded stone aggregate 20mm nominal size) and curing complete including form work in : String courses coping bed plates, anchor blocks plain window sills and the like including curing and carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge.
Steel work welded in built up sections,trusses and framed work,including cutting ,hoisting ,fixing in position and applying a priming coat of red lead paint In gratings framed guard bars, ladders, railling, brackets and similar works including curing and carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge.
Painting two coats (excluding priming coat) on new steel and other metal surfaces with enamel paint brushing to give and even shade includes cleaning the surfaces of all dirt, dust and other foreign matter with enamel white paint. including carriage of material within all leads and lifts.
P/L of Interlock ing paver block pavements having thickness 60mm ISI marked as per drawing and Technical specification Clause-1504 , including carriage of materials ,labour ,tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-charge.
Sushil Kumar
RAMESH KUMAR
Suresh Kumar
Sahil Choudhary
NARESH KUMAR
ARUN CHAUDHARY GOVT CONTRACTOR
Rajinder Kumar
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .