Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC R O VILL HASOL P O CHUKHATH TEHSIL JAWALAMUKHI DISTT KANGRA | KANGRA | HIMACHAL PRADESH | 175013 | ₹8.0 L | L1 | Accepted-AOC AOC |
| 2 | L2₹8.3 L+₹27,280 (3.40%)Rejected-Finance | ₹8.3 L+₹27,280 (3.40%) | L2 | Rejected-Finance Being 2nd lowest bidder |
| 3 | L3₹8.7 L+₹66,607.50 (8.31%)Rejected-Finance | ₹8.7 L+₹66,607.50 (8.31%) | L3 | Rejected-Finance Being 3rd lowest bidder |
| 4 | L4₹8.8 L+₹80,692.50 (10.1%)Rejected-Finance GOVT CONTRACTOR VILLAGE KADHYAR P O TEHSIL JUNGA DISTT SHIMLA 9 | ₹8.8 L+₹80,692.50 (10.1%) | L4 | Rejected-Finance Being 4th lowest bidder |
| Sl No | Description | Qty | Unit | VISHAL THAKUR L4 | NAVEEN VERMA L3 | VIKAS THAKUR L1 | RAHIL VERMA L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in soil in hill area by manual means/mechanical means including cutting and trimming of side slope and disposing of excavated earth with in all leads and lifts as per drawing and technical specification clause 1603.10 as per direction of the Engineer-in-charge. | 41.75 | Per Cubic Metre | 160 ₹6,680 | 250 ₹10,437.5 | 140 ₹5,845 Lowest | 180 ₹7,515 |
| 2.00 | Earth work in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing removal of stumps and other deleterious material and disposal upto all leads and lifts dressing of sides and bottom backfilling in trenches with excavated suitable materials upto all leads and lifts as per directions of the Engineer-in-Charge. | 44.25 | Per Cubic Metre | 240 ₹10,620 | 310 ₹13,717.5 | 210 ₹9,292.5 Lowest | 250 ₹11,062.5 |
| 3.00 | Providing and laying concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203) P.C.C nominal mix 1:5:10 (40mm aggregates) including entire carriage of materials through all modes of transportation with in all leads and lifts as per direction of the Engineer-in-Charge.. | 172 | Per Cubic Metre | 4,690 ₹8,06,680 | 4,600 ₹7,91,200 | 4,295 ₹7,38,740 Lowest | 4,450 ₹7,65,400 |
| 4.00 | Back filling behind abutment, retaining wall/breast wall including entire carriage of materials through all modes of transportation with in all leads and lifts as per direction of the Engineer-in-Charge. | 42 | Per Cubic Metre | 940 ₹39,480 | 810 ₹34,020 | 750 ₹31,500 | 600 ₹25,200 Lowest |
| 5.00 | Providing weapholes in brick masonry/stone masonry/plain reinforced concrete abutment, wing wall, return wall with 100mm dia PVC pipe extending through the full width of the structures with slop of 1 (v):20(H) towards drawing face complete as per drawing and technical specification clauses 614,709,1204.3.7 including entire carriage of materials through all modes of transportation with in all leads and lifts as per direction of the Engineer-in-Charge. | 87 | Each | 220 ₹19,140 | 220 ₹19,140 | 190 ₹16,530 Lowest | 230 ₹20,010 |
Tender Value
₹8.9 L
EMD Value
₹17,750
Closing Date
8 Mar 2026, 6:00 pmClosed
Executive Engineer
Kumarsain Division HPPWD Kumarsain
C/O PCC R/Wall at Rd 105/520 to 105/545 and 108/105 to 108/130
2026_PWD_130056_1
PW-KMS-AB-NIT/2025-26-9661-62 dt 25.02.2026
Open Tender
Civil Works - Roads
Item Rate
30 days
Kumarsain
Please refer Tender documents.
9 documents required · 9 mandatory
₹350
₹17,750
7 Apr 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
8 Mar 2026
2 Mar 2026
Excavation in soil in hill area by manual means/mechanical means including cutting and trimming of side slope and disposing of excavated earth with in all leads and lifts as per drawing and technical specification clause 1603.10 as per direction of the Engineer-in-charge.
Earth work in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing removal of stumps and other deleterious material and disposal upto all leads and lifts dressing of sides and bottom backfilling in trenches with excavated suitable materials upto all leads and lifts as per directions of the Engineer-in-Charge.
Providing and laying concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203) P.C.C nominal mix 1:5:10 (40mm aggregates) including entire carriage of materials through all modes of transportation with in all leads and lifts as per direction of the Engineer-in-Charge..
Back filling behind abutment, retaining wall/breast wall including entire carriage of materials through all modes of transportation with in all leads and lifts as per direction of the Engineer-in-Charge.
Providing weapholes in brick masonry/stone masonry/plain reinforced concrete abutment, wing wall, return wall with 100mm dia PVC pipe extending through the full width of the structures with slop of 1 (v):20(H) towards drawing face complete as per drawing and technical specification clauses 614,709,1204.3.7 including entire carriage of materials through all modes of transportation with in all leads and lifts as per direction of the Engineer-in-Charge.
stage.html
html • 0.05 MB
technical_192252.pdf
techsummary_192252.pdf
finance_192252.pdf
BOQ Comparative Chart
xlsx
finsummary_192252.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
SBD.pdf
Tender Documents • 2.67 MB
BOQ_192252.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .