Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹39.5 L
EMD Value
₹39,500
Closing Date
26 Nov 2026, 6:00 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE ENGINEER UPSIC KANPUR
EXECUTIVE ENGINEER UPSIC KANPUR
Estimate for construction of Mini industrial estate Atrauli -aligarh
2026_MSME_1207478_2
350/EE3/UPSIC/2026-27
Open Tender
Civil Works
Percentage
180 days
KANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
EXECUTIVE ENGINEER UPSIC KANPUR
₹39,500
10 Nov 2026
10 Nov 2026
27 Nov 2026
10 Nov 2026
26 Nov 2026
10 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in surface excavationby mechanical means in foundation and trenches and lead up to 50 m ….....complete | 25.92 | cum | 196.68 | ₹5,097.95 |
| 2 | Providing and laying in cement concrete 1:4:8 with Stone ballast including all materials, labours T&P etc . | 3.66 | Cum | 5,147.2 | ₹18,838.75 |
| 3 | Rcc work with cement approved coarse sand and 2 cm gauge approved stone grith in 1:1.5:3proportation for slab ,up to plinth level | 20.57 | cum | 6,835.04 | ₹1,40,596.77 |
| 4 | Rcc work with cement approved coarse sand and 2 cm gauge approved stone grith in 1:1.5:3proportation for slab ,above plinth level | 3.59 | cum | 8,200.57 | ₹29,440.05 |
| 5 | Thermo mechanically treated bars of grade Fe500D or more in rcc work | 23.86 | qtl | 8,149.23 | ₹1,94,440.63 |
| 6 | centering and shuttering including strutting proping etc removal of form work for foundation footing base of column etc | 19.82 | sqm | 296.31 | ₹5,872.86 |
| 7 | centering and shuttering including strutting proping etc removal of form work for column piller piers and struts etc | 28.62 | sqm | 726.37 | ₹20,788.71 |
| 8 | centering and shuttering including strutting proping etc removal of form work for lintel beams plinth beams and antilivers etc | 45 | sqm | 556.43 | ₹25,039.35 |
| 9 | m-150 brick work in 1:6cement and coarse sand in foundation and plinth including supply of all material ,labour and t$p etc. required for proper completion of work in super structure | 37.26 | cum | 6,880.52 | ₹2,56,368.18 |
| 10 | 12mm thick cement plaster with 1:4 cement and sand mortor on fair side of wall including all material, labours, T&P etc all complete. | 210 | sqm | 270.02 | ₹56,704.2 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
TermsandConditionTenderCivilWorks.pdf
Tender Documents • 0.05 MB
BOQ_2290584.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .