Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹48.7 LAdmitted-Finance | -21.60% | ₹48.7 L | L1 | Admitted-Finance |
| 2 | L2₹55.9 L+₹7.1 L (14.6%)Admitted-Finance H 115 MALVIYA INDUSTRIAL AREA MALVIYA INDUSTRIAL AREA MALVIYA NAGAR INDUSTRIAL AREA JAIPUR JAIPUR RAJASTHAN 302017 | JAIPUR | RAJASTHAN | 302017 | -10.12% | ₹55.9 L+₹7.1 L (14.6%) | L2 | Admitted-Finance |
| 3 | L3₹60.2 L+₹11.5 L (23.6%)Admitted-Finance | -3.11% | ₹60.2 L+₹11.5 L (23.6%) | L3 | Admitted-Finance |
| 4 | L4₹68.3 L+₹19.6 L (40.2%)Admitted-Finance PLOT NO 282 ROZKAMEO INDL AREA DISTT MEWAT HARYANA GURGAON HARYANA 122103 | GURUGRAM | HARYANA | 122103 | +9.90% | ₹68.3 L+₹19.6 L (40.2%) | L4 | Admitted-Finance |
| 5 | L5₹99.1 L+₹50.4 L (103.4%)Admitted-Finance | +59.50% | ₹99.1 L+₹50.4 L (103.4%) | L5 | Admitted-Finance |
Tender Value
₹73.3 L
EMD Value
₹11,000
Closing Date
31 Aug 2026, 12:00 pmClosed
CGM (M n C) NR
3rd Floor, Material and Contracts, Northern Region Office, Indian Oil Bhavan, Yusuf Sarai, New Delhi 110016
RVI WORKS ON DOUBLE COLUMN EV CANOPIES AT ROS UNDER ALL FIVE DIVISIONAL OFFICES OF UTTAR PRADESH STATE OFFICE II
2026_NRO_190973_1
MnC/NR/UPSO-2/ENG/LT-129/26-27
Limited
Civil Works
Works
60 days
As per NIT
Please refer Tender documents.
5 documents required · 5 mandatory
₹11,000
Yes
16 Sept 2026
24 Aug 2026
1 Sept 2026
24 Aug 2026
31 Aug 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1RVI WORKS ON DOUBLE COLUMN EV CANOPIES AT ROS UNDER ALL FIVE DIVISIONAL OFFICES OF UTTAR PRADESH STATE OFFICE–II | |||||
| 1.01 | Uniform percentage above or below, on the offered rates as per the enclosed Annexure-3 of Technical Bid Part-A
GST shall be paid Extra. | 1 | Nos | 62,15,391.83 | ₹62,15,391.83 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.76 MB
Tender-Acceptance-Format.pdf
Additional Documents • 0.08 MB
FAQs-IOCL-Online-EMD.pdf
Additional Documents • 0.55 MB
Bidders_help_Document_for_Preferencial_Bidding_20230207_v1.pdf
Additional Documents • 0.82 MB
BOQ_201260.xls
BOQ • 0.33 MB
Special_Instructions_to_the_Bidders_Version_5_dated_30_June_2025.pdf
Additional Documents • 2.80 MB
ED.xls
Additional Documents • 0.88 MB
02B_SOR.pdf
Tender Documents • 0.34 MB
04A_TechnicalBid_Part-A_LT_129.pdf
Tender Documents • 0.74 MB
04B_Part-B Version 5 (NIC).pdf
Tender Documents • 1.71 MB
10_Mechanical and Electrical Specifications_Volume3.pdf
Additional Documents • 10.68 MB
11_DOs and Dont.pdf
Additional Documents • 0.26 MB
12_OISD - Safety Practices during Construction.pdf
Additional Documents • 13.44 MB
13_GCC_Updated_13052026.PDF
Additional Documents • 1.87 MB
14_Guidelines on Personal Protective Equipment.pdf
Additional Documents • 3.08 MB
15_Job Safety Analysis.pdf
Additional Documents • 3.14 MB
1_Technical_Specification_RVI_Elements.pdf
Additional Documents • 1.30 MB
2_DESIGN_A_EV_CHARGER.pdf
Additional Documents • 1.22 MB
4_RVI_Inspection_Format_Stage_A.pdf
Additional Documents • 0.79 MB
5_RVI_Inspection_Format_Stage_B.pdf
Additional Documents • 0.63 MB
6_RVI_Inspection_Format_Stage_C.pdf
Additional Documents • 0.67 MB
7_Format_for_Contractors_Performance_Evaluation.pdf
Additional Documents • 1.68 MB
8_List of Preferred Makes_Engineering Materials_03 12 25.pdf
Additional Documents • 1.66 MB
9_Civil Specification 2023.pdf
Additional Documents • 18.90 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .