| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC Least Rate Quoted Bid Accepted |
| 2 | L2₹1.1 CrRejected-AOC NO 11 SATTAIYAPPAR SANNATHI NAGAPATTINAM 611 001 | NAGAPATTINAM | TAMIL NADU | 611001 | ₹1.1 Cr | L2 | Rejected-AOC High Rate Quoted The Bidder Rejected |
| Sl No | Description | Qty | Unit | UDHAYAM CONSTRUCTIONS L2 | S.Saravanan L1 |
|---|---|---|---|---|---|
| 1.0001. Strengthening of Raranthimangalam - Thiruparkadal Road 0/0-1/200 in Thirumarugal Block | |||||
| 2.00Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | |||||
| 3.00 | Km 0/0 - 1/200 | 864 | Sq.Mtr | 6 ₹5,184 | 6 ₹5,184 |
| 4.00collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc. | |||||
| 5.00 | Km 0/0 - 1/200 | 216 | Cum | 148 ₹31,968 | 147 ₹31,752 |
| 6.00Providing and laying Spreading and compacting graded stone aggregate to wet Mix Macadam (WMM) Specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by Tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achive the desired density including cost of Materials Labour charges rentals for Machinary , Fuel and all other incidential charges etc., Complete. | |||||
| 7.00 | KM 0/0 - 1/0 | 451.13 | Cum | 3,985 ₹18.0 L | 3,946 ₹17.8 L |
| 8.00 | Km 1/0-1/350 | 90 | Cum | 3,985 ₹3.6 L | 3,946 ₹3.6 L |
| 9.00Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | |||||
| 10.00 | Km 0/0 - 1/200 | 3,607.5 | Sq.Mtr | 88 ₹3.2 L | 87 ₹3.1 L |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
20 Feb 2026, 3:00 pmClosed
Project Director, DRDA, Nagapattinam
Collectorate campus Nagapattinam
01.Strengthening of Raranthimangalam - Thiruparkadal Road 0/0-1/200. 02. Strengthening of Thirupanaiyur Sebiyanmalai Road 0/0-1/350 in Thirumarugal Block
2026_RDTN_657981_1
Nagai/1044/NABARD-2026-27/P-09
Open Tender
Civil Works - Roads
270 days
Collectorate campus Nagapattinam
As per Tender Documents
8 documents required · 8 mandatory
₹0
₹1.2 L
DRDA, Collectorate Campus, Nagapattinam
17 Mar 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
17 Feb 2026
01. Strengthening of Raranthimangalam - Thiruparkadal Road 0/0-1/200 in Thirumarugal Block
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc.
Providing and laying Spreading and compacting graded stone aggregate to wet Mix Macadam (WMM) Specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by Tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achive the desired density including cost of Materials Labour charges rentals for Machinary , Fuel and all other incidential charges etc., Complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying tack coat over the WMM surface (Treated with primer) using 2.5 Kg of bituminous emulsion RS-01 for 1 sqm. for preparatory to another Bituminous construction over it including cost of Material, labour charges, rentals for Machinary, Fuel and all other incidential cahrges etc., Complete.
Providing and laying Bituminious concrete to 25, 30/40 MM Thick Using CMP(Grade-II) - Providing Bituminous Concrete to 40 mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providingand Laying Gravel including cost and conveyance Garvel form Approved Sources to worksite and stocking on road side to Departmental meric gauge fro premeasurement as directed including labour for spreading and Compacting etc., Complete ar per MORD Specification No.400.
Provision for Sign Board
Provision for Km Stone
Provision for Hm Stone
02. Strengthening of Thirupanaiyur Sebiyanmalai Road 0/0-1/350 in Thirumarugal Block
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc.
Providing and laying Spreading and compacting graded stone aggregate to wet Mix Macadam (WMM) Specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by Tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achive the desired density including cost of Materials Labour charges rentals for Machinary , Fuel and all other incidential charges etc., Complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying tack coat over the WMM surface (Treated with primer) using 2.5 Kg of bituminous emulsion RS-01 for 1 sqm. for preparatory to another Bituminous construction over it including cost of Material, labour charges, rentals for Machinary, Fuel and all other incidential cahrges etc., Complete.
Providing and laying Bituminious concrete to 25, 30/40 MM Thick Using CMP(Grade-II) - Providing Bituminous Concrete to 40 mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providingand Laying Gravel including cost and conveyance Garvel form Approved Sources to worksite and stocking on road side to Departmental meric gauge fro premeasurement as directed including labour for spreading and Compacting etc., Complete ar per MORD Specification No.400.
Provision for Sign Board
Provision for Km Stone
Provision for Hm Stone
Maintanace for 5 Years
1 st year Maintenance
II nd year Manitenence
III rd Year Maintenance
IV th Year Maintenance
Vth year Maintenance
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
tecbid.pdf
Tender Documents • 0.55 MB
pricebid.pdf
Additional Documents • 0.30 MB
BOQ_789272.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid