Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.6 CrAccepted-AOC AT GIRISH TAKIES KALYANPUR DIST JAMUI PIN 811307 | JAMUI | BIHAR | 811307 | L1 | Accepted-AOC OK | |
| 2 | L2₹12.6 Cr+₹6.4 L (0.51%)Rejected-AOC AT CHAPARIA PO KOIRIDIH PS JASIDIH DIST DEOGHAR JHARKHAND PIN 814153 | GODDA | JHARKHAND | 814153 | L2 | Rejected-AOC OK |
Tender Value
₹12.7 Cr
EMD Value
₹25.4 L
Closing Date
7 Aug 2024, 5:00 pmClosed
E.E. RWD WORKS DIVISION, DEOGHAR
E.E. RWD WORKS DIVISION, DEOGHAR
RWD/EE/DEOGHAR/STPKG/02/2024-25 Strengthening of Road from (i) Lusio More to Belmi, Dudhani........
2024_RWD_88565_1
RWD/EE/DEOGHAR/STPKG/02/24-25
Open Tender
Civil Works - Roads
Percentage
450 days
DEOGHAR
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹25.4 L
Yes
21 Mar 2026
23 Jul 2024
8 Aug 2024
23 Jul 2024
7 Aug 2024
23 Jul 2024
23 Jul 2024 - 7 Aug 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (i) Lusio More to Belmi, Dudhani (L-1.640 Km.)
Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201 | 0.28 | Ha | 19,760.3 | ₹5,532.88 |
| - | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres.
By Mechanaical Means using Hydraulic excavator. | 1,736.55 | M2 | 4.8 | ₹8,335.44 |
| - | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres) (By Mechanichal Means)
Cement Concrete Grade M-15 & M-20 | 2.1 | M3 | 652.8 | ₹1,370.88 |
| - | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres) (By Mechanichal Means)
Prestressed/ Reinforced cement concrete grade M-20 & above (Deck Slab) | 4.5 | M3 | 887 | ₹3,991.5 |
| - | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres) (By Mechanichal Means)
Dismantling Rubble stone masonry in cement mortar | 11.25 | M3 | 286.3 | ₹3,220.88 |
| - | Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2) | 1,396.9 | M3 | 131.3 | ₹1,83,412.97 |
| - | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 474.62 | M3 | 3,161.4 | ₹15,00,463.67 |
| - | Prime Coat over WMM/WBM (Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.) | 2,923.19 | M2 | 81.75 | ₹2,38,970.78 |
| - | Tack Coat on Granular surfaces treated with primer
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared granular surface cleaned with mechanical broom. | 2,923.19 | M2 | 16.06 | ₹46,946.43 |
| - | Tack Coat on Bituminous surfaces
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 2,923.19 | M2 | 13.01 | ₹38,030.7 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_119397.xls
BOQ Document • 0.37 MB
148856408.pdf
Tender Document • 0.59 MB
LUSIO_PKG_02.pdf
Tender Document • 0.35 MB
148856410.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .